Printer Friendly

Worthington Energy Inc completes ''4 Point Test'' on I-1 well.

M2 EQUITYBITES-October 9, 2012-Worthington Energy Inc completes ''4 Point Test'' on I-1 well(C)2012 M2 COMMUNICATIONS http://www.m2.com

Energy company Worthington Energy Inc (OTCBB:WGAS) reported on Monday the completion of the "4 Point Test" on its I-1 well, which is required by the Railroad Commission of Texas (RRC), the state regulatory agency for the oil and gas industry.

This test measures the deliverability of a well as defined by the well's capacity to produce. It is used by the RRC to allocate production quotas.

According to the company's president & CEO, Tony Mason, the I-1 well was opened on a seven choke and was allowed to stabilise for three hours. It flowed well on both a six choke and a seven choke, and the extrapolated oil rate flow ranged between approximately 200 to 400 BOEPD (barrels of oil equivalent per day).

The CEO added that the six choke will be its initial production choke once the pipeline is charged. The oil produced was 38.3 API WTI and the pipeline pressure was up to 80 psi, but it needs to be at least 300 to 400 psi in order to begin 24-hour production.

((Comments on this story may be sent to info@m2.com))

COPYRIGHT 2012 Normans Media Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2012 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:M2 EquityBites (EQB)
Date:Oct 9, 2012
Words:207
Previous Article:St. Jude Medical Inc unveils MediGuide Technology, reducing need for fluoroscopic images in cardiovascular procedures.
Next Article:Rockwell closes buy of Jiuzhou Electric's medium voltage drives business.
Topics:

Terms of use | Privacy policy | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters