Well Rehabilitation Improvements.

CIP Total : 4,250

PROJECT DESCRIPTION: Funds are budgeted to rehabilitate TMWA production wells as required. Typically for subgrade rehabilitation efforts, four to six wells are inspected, tested and evaluated every year to determine if rehabilitation is required. Typical subgrade rehab activities include but are not limited to, pump and pump column pipe replacements rehabilitation of well casing and other enhancements to maintain well quality and capacities. Spending in fiscal years 2016-2020 will include improvements at several wells to provide general above grade well equipment and building upgrades including upgrades to electrical and telemetry equipment. TMWA has over 90 water production wells operating throughout the water system. TMWA relies on these wells to provide drought and emergency supply and as a supplemental source to meet peak demands on the water system.

SCHEDULE: Four wells have been targeted for rehabilitation improvements in FY2016: Hunter Lake, Reno High, Galetti, and Corbett.

Project completion date : 2020-12-31 12:00:00


Address : 1355 Capital Blvd

Reno, NV 89502

Country :United States

Url :

[c] 2015 Al Bawaba ( Provided by SyndiGate Media Inc. ( ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Nov 12, 2015
Previous Article:Double Diamond Well #3 (Equip).
Next Article:Well Bypass and Chlorine Room Improvements (former STMGID wells).

Terms of use | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters