Printer Friendly

Browse Integer programming topic

Usage subtopic

Articles

1-20 out of 20 article(s)
Title Author Type Date Words
A DE-LS Metaheuristic Algorithm for Hybrid Flow-Shop Scheduling Problem considering Multiple Requirements of Customers. Yingjia, Sun; Xin, Qi Report Jul 31, 2020 8687
A Novel Method for Inference of Chemical Compounds of Cycle Index Two with Desired Properties Based on Artificial Neural Networks and Integer Programming. Zhu, Jianshen; Wang, Chenxi; Shurbevski, Aleksandar; Nagamochi, Hiroshi; Akutsu, Tatsuya Report May 1, 2020 19024
A Generalized MILP Formulation for the Period-Aggregated Resource Leveling Problem with Variable Job Duration. Tarasov, Ilia; Hait, Alain; Battaia, Olga Report Jan 1, 2020 8161
Emergency Evacuation of Hazardous Chemical Accidents Based on Diffusion Simulation. Zhang, Jiang-Hua; Liu, Hai-Yue; Zhu, Rui; Liu, Yang Report Jan 1, 2017 9376
The integrated scheduling problem in container terminal with dual-cycle operation. Zhang, Y.; Rong, Z.; Liu, Z.-X. Report Sep 1, 2014 7014
Multi-objective integrated production planning model and simulation constrained doubly by resources and materials. Wang, C.; Liu, X.-B.; Zhao, G.-Z.; Chin, K.O. Report Jun 1, 2014 4983
A mathematical model for the industrial hazardous waste location-routing problem. Boyer, Omid; Hong, Tang Sai; Pedram, Ali; Yusuff, Rosnah Bt Mohd; Zulkifli, Norzima Report Jan 1, 2014 6580
Control allocation design of reaction control system for reusable launch vehicle. Mu, Rongjun; Zhang, Xin Report Jan 1, 2014 4764
Introducing the MCHF/OVRP/SDMP: Multicapacitated/Heterogeneous Fleet/Open Vehicle Routing Problems with Split Deliveries and Multiproducts. Eroglu, Duygu Yilmaz; Gencosman, Burcu Caglar; Cavdur, Fatih; Ozmutlu, H. Cenk Report Jan 1, 2014 8925
MIP models and hybrid algorithms for simultaneous job splitting and scheduling on unrelated parallel machines. Eroglu, Duygu Yilmaz; Ozmutlu, H. Cenk Report Jan 1, 2014 12860
Hybrid biogeography-based optimization for integer programming. Wang, Zhi-Cheng; Wu, Xiao-Bei Report Jan 1, 2014 5256
Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure. Afshar-Nadjafi, Behrouz; Arani, Mohammad Report Jan 1, 2014 7132
Activity-based scene decomposition for topology inference of video surveillance network. Zhang, Hongguang; Cui, Jianzhu; Wang, Peng; Zheng, Shibao Technical report Jan 1, 2014 4525
An operation optimization for express freight trains based on shipper demands. Zhang, Yuzhao; Yan, Yusong Report Jan 1, 2014 5320
Identification of contamination control strategy for fluid power system using an inexact chance-constrained integer program. Huang, Y.Q.; Nie, S.L.; Ji, H. Report Jan 1, 2014 11378
Mixed integer programming-based liveness test for FMS with full routing flexibility. Dong, Lida; Chi, Tianyang; Zhu, Chengcheng; Yin, Jun Report Jan 1, 2014 10427
Algorithms for the shortest path improvement problems under unit Hamming distance. Zhang, Bingwu; Guan, Xiucui; He, Chunyuan; Wang, Shuguo Report Jan 1, 2013 7618
A dynamic scheduling method of earth-observing satellites by employing rolling horizon strategy. Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma. Report Jan 1, 2013 6564
A two-stage procedure for designing a group technology system. Cheng, Chun-Hung; Goh, Chon-Huat; Lee, Anita Jun 1, 1995 3259
A volume and material handling cost based heuristic for designing cellular manufacturing cells. Ahmed, Mesbah U.; Ahmed, Nazim U.; Nandkeolyar, Udayan Oct 1, 1991 7911

Terms of use | Privacy policy | Copyright © 2021 Farlex, Inc. | Feedback | For webmasters |