Printer Friendly

United States : Scoggins Dam geologic investigations continue.

The Bureau of Reclamation will resume geologic investigations near Scoggins Dam the week of July 24. Reclamation crews will be working on both sides of the dam as well as downstream. Soil and rock samples will be collected from up to 50 sites to support ongoing analysis and design for Scoggins Dam seismic stability studies.

The work will include drilling, test pits, hand-excavated pits, and geophysics testing. Although no road closures are anticipated, temporary delays may be required to move equipment to the work areas.

Reclamation advises the public to be aware of drilling equipment near the dam and to avoid the area. The drill crews are expected to continue work through mid-December.

Scoggins Dam has been part of Reclamations Tualatin River Project since 1978. It stores water for Tualatin Valley Irrigation District and municipalities in the area.

[c] 2017 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jul 17, 2017
Words:151
Previous Article:United States : David van Rijn Selected as Planning Officer for the Bureau of Reclamations Mid-Pacific Region.
Next Article:Bahrain : TRA Issues Regulation to Manage Risks in Critical Telecommunications Infrastructure.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters