Printer Friendly

The Purchase Of New Vehicles And Transport Equipment For Pgnig Sa.

Contract notice: The purchase of new vehicles and transport equipment for pgnig sa.

The contract is for the purchase and delivery of brand new (not older than produced in 2016) trucks, vehicles, passenger and commercial vehicles and other transport equipment for PGNiG SA Branch in Zielona Gra and PGNiG SA Branch Borehole Mining Rescue Station in Krakow. Provided the vehicles are to be approved in force in the Republic of Poland (steering wheel on the left side), must be covered by the manufacturer~s warranty and meet the technical requirements of the Polish road traffic regulations. Object of the contract was divided into 10 parts as described below. The delivery includes the part 1 of the contract - tank truck with GVW 12t to carry water reservoir - 2 pcs. lot 2 - tank truck with GVW 12t to carry methanol - 1 pc. section 3 of the contract - Tank-semi-trailer to transport molten sulfur - 1 pc. section 4 of the contract - semitrailer tube - 1 pc. No. 5 parts orders - Commercial vehicle dropside 4x4 DMC to 3.5 t 6 people - 1 pc. lot 6 orders - Small commercial vehicle station wagon VAN, 5 bed, 4x4 (2 pieces) and 4x2 (1-pack) - 3 pcs. lot 7 order - Pick-up 5 bedded 4x4 -2 units. section 8 orders - Forklift combustion - 1 pcsection 9 order - Self-propelled platform mobile - 1 pcsection 10 order - Specialist vehicles with body type van, DMC to 5t - 2 pcsA detailed description of the contract will be included in the Terms of Reference (ToR), which will be communicated to the Contractors invited to tender.

Total quantity or scope: The estimated value of the contract exceeds the PLN equivalent of EUR 418 000.

This contract is divided into lots: yes

Deposits and Guarantees required: The contractor will be required to provide an offer for the guarantee of

lot 1 16 000 PLN (say sixteen thousand)

lot 2 8 000 PLN (eight thousand)

section 3 of the contract 7 000 PLN (say seven hundred thousand)

section 4 of the contract PLN 2 500 (two thousand five hundred)

part of the No. 5 Order 2 000 PLN (two thousand)

lot 6 of the order of 4 000 PLN (four thousand)

lot 7 order 3 000 PLN (three thousand)

section 8 orders 2 000 PLN (two thousand)

section 9 of the contract PLN 2 000 (two thousand)

section 10 orders 7 000 PLN (say seven hundred thousand).

Securities shall be lodged before the deadline for submission of bids, in one or more forms referred to in Article. 45 paragraph. 6 of the Act of 29.1.2004 the Public Procurement Law (unified text Journal of Laws 2015, item. 2164), hereinafter referred to as "PPL".

Description of how the bid bond will be included in the Terms of Reference, submitted with

the Call for tenders Contractors selected for further participation in the proceedings.

The Employer will not require performance bond (ZNWU).

In the case of 1,2,3,4 Employer provides for the possibility of granting an advance on the

Major organization : POLSKIE GRNICTWO NAFTOWE I GAZOWNICTWO SA

Address : Ul. Marcina Kasprzaka 25

01-224 Warszawa

Contact Point(S): Pgnig Sa

Departament Zakupw

Budynek Nr C6

For The Attention Of: Renata Warjas

Country :Poland

Url : http://www.pgnig.pl

Tender notice number : 259748-2016

Notice type : Tender Notice

Open date : 2016-08-29

Tender documents : T34643741.html , G34643741.html

[c] 2016 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).
COPYRIGHT 2016 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2016 Gale, Cengage Learning. All rights reserved.

 
Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Geographic Code:4EXPO
Date:Aug 17, 2016
Words:566
Previous Article:Art Installation Of A Brand New Complete Belt Conveyor.
Next Article:Supply Of Medical Equipment, Small Medical Equipment, Disposable Medical Products And Neurosurgical Implants In Packages For Sps Zoz Zdroje. Case No:...

Terms of use | Privacy policy | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters