Printer Friendly

Teerpechhaltigem road construction material 2014/2015.

Contract notice: teerpechhaltigem road construction material 2014/2015

Weigh, Answer, and interim storage of teerpechhaltigem road construction material recycling units to mix for foundation layers, weigh and deliver to the customer, or dispose of shares of the pitch-containing road construction material in their own responsibility. : Evidence required lead (electronic waste detection methods). : Execution times Beginning of the acceptance of road construction material: 1/1/2014 : End of the acceptance of road construction material: 31/12/2015 : Start of delivery of the processed material: 1/1/2014 : End of the delivery of the processed material: 31/12/2016

Time limit for receipt of requests for documents or for accessing documents: 20.8.2013 - 16:00

Language(s) in which tenders or requests to participate may be drawn up:


Tender documents : T17046921.html

2013 Al Bawaba (

Provided by an company
COPYRIGHT 2013 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2013 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jul 11, 2013
Previous Article:Architectural and engineering services for modernization and repair work including energy refurbishment and loft conversion to residential buildings...
Next Article:Property planning for traffic installations.

Terms of use | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters