Printer Friendly

Supply hydro turbine guide bearings for the First Powerhouse at Bonneville Dam.

Contract Awarded to Supply hydro turbine guide bearings for the First Powerhouse at Bonneville Dam

Contract Value : US$479,000

The U.S. Army Corps of Engineers% Portland District most recently solicited bids for the work in February, for two cylindrical fit, shell-type turbine guide bearings with an optional third guide bearing for the Bonneville First Powerhouse. American Babbitt Bearing will furnish all necessary parts including stud bolts, nuts and plugs.

The Corps previously awarded a contract in 2013 to Precision Machine and Supply Inc. to repair the turbine of Main Unit 11 in Bonneville%s Second Powerhouse. It also awarded a contract to Transformer Services Inc. to refurbish step-up transformers at the Second Powerhouse. Bonneville is a turbine design testing site for improvement of fish passage.

Bonneville Dam and the associated 1,076.6 MW hydropower project are located on the Columbia River between Washington and Oregon.

Contractor name : AMERICAN BABBITT BEARING INC.

Contractor address : American Babbitt Bearing Inc.

12433 Robert E Lee Rd,

Houston, TX 77044

country :United States

2014 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).
COPYRIGHT 2014 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2014 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:May 24, 2014
Words:183
Previous Article:Local Bus Services (2 routes).
Next Article:Lease and rental of property or building Office space.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters