Printer Friendly

Suffolk Seaboard Coastline Trail (Phase IV).

Bid are invited for Suffolk Seaboard Coastline Trail (Phase IV)

SCOPE OF WORK Provide a 10-ft wide paved multi-use trail with 2-ft wide gravel shoulders and two trail heads. The project is described as Segment 4 (the Village of Driver to the Chesapeake City line) of the Suffolk Seaboard Coastline Trail Master Plan dated August 2006. The 3.3 mile trail alignment will be contained within the existing varying to 100-ft wide City property along the abandoned Seaboard Coastline rail corridor. The project will be developed as a two phase project, Base Bid and a Bid Alternate. The Base Bid is defined as the proposed parking lot at the Village of Driver beginning at approximate Station 10+00 and the 10-ft wide paved multi-use trail ending at Shoulders Hill Road approximate Station 133+33. The Bid Alternate is described as the Cross Walk at Shoulders Hill Road beginning at approximate Station 133+33, and the 10-ft wide paved multi-use trail and proposed parking lot at City Line with Suffolk and Chesapeake. The bid alternate ends at approximate Station 198+37.

Mandatory Pre-Bid Conference: 04/29/2014 10 A.M. on site in the parking lot at the intersection of King s Hwy and Nansemond Pkwy

Tender documents : T21823604.doc

2014 Al Bawaba (Albawaba.com) Provided by Syndigate.info , an Albawaba.com company
COPYRIGHT 2014 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2014 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Apr 14, 2014
Words:222
Previous Article:Seventy-five foot heavy duty stick ladder truck.
Next Article:Valves/Supplies (stock contract).

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters