Printer Friendly

Study and development of the ferromagnetic core (and tool assembly) of the electromagnetic pump of the test loop pemdyn.

Contract notice: Study and development of the ferromagnetic core (and tool assembly) of the electromagnetic pump of the test loop pemdyn

In the project ASTRID (Advanced Sodium Technological Reactor for Industrial Demonstration), CEA performs the loop PEMDYN is a test circuit to test and characterize an electromagnetic pump (EMP) for the movement of sodium to large flow inside of the cooling circuits. This contract covers the design and implementation of the ferromagnetic core (and its mounting tool) of the PEM this test loop. These services are provided on behalf of the Department of Nuclear Energy (DEN) - Department of Nuclear Technology (DTN) - Service Advanced Technologies and Processes (STPA) of the CEA Cadarache.

Time limit for receipt of tenders or requests to participate: 30.4.2013 - 15:30

Language(s) in which tenders or requests to participate may be drawn up:

French.

Tender documents : T15451030.html

2013 Al Bawaba (Albawaba.com)

Provided by Syndigate.info an Albawaba.com company
COPYRIGHT 2013 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2013 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Mar 23, 2013
Words:157
Previous Article:Bel air business park - forest: missions consulting architect in planning, coordinating and landscape.
Next Article:Guarding the headquarters.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters