Printer Friendly

Stone Track Ballast,arema 3,4 And 5.

Tenders are invited for Stone Track Ballast,

Arema 3,4 And 5.

SCOPE:

1.1 SUMMARY

1.1.1 This package includes all labor, materials, and equipment for the production, testing, and delivery

of stone track ballast for use in the WMATA Metrorail system.

1.1.2 This procurement includes Number 3 ballast for use with concrete crossties, Number 4 ballast for

use with wood crossties, and Number 5 ballast for use in rail yards.

1.1.3Stone ballast is a critical material used for track construction, stabilization, and drainage,

therefore, it must meet the required specifications in this package

Description of Work:

This solicitation is to provide mineral aggregate for use as ballast, AREMA size 3, size 4 and

size 5 to various WMATA locations within the Metropolitan area. The ballast must meet the

technical specifications as set forth in the specifications package and American Railway

Engineering

Major organization : WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

Address : 600 Fifth Street, NW,

Room 3D-02-D,

Washington, DC 20001-2651.

Attn: Leaser T. Rivas/CA

Country :United States

Email : lrivas@wmata.com

Tender notice number : FQ17050/LTR

Notice type : Tender Notice

Open date : 2016-11-22

Tender documents : T36238288.pdf

[c] 2016 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2016 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2016 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Nov 9, 2016
Words:206
Previous Article:Dabob Piper Road Well Decommissioning.
Next Article:Pressure Transducers.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters