Printer Friendly

Russian Federation,United Kingdom : JKX announces repairing of production at Koshekhablskoye well in Russia.

After repairs and re completion, Well 27 in the Koshekhablskoye Field onshore southern Russia has been fixed to production.

At present, the well is growing at a rate of 16.3 MMcf/d via a 27/64-in. choke, with a flowing wellhead pressure of 3,370 psi. Prior to performing a routine acid treatment of the carbonate reservoir to clean out the well and further stimulate production, the well was completed.

Restoration of production from well 27 brings the total field rate to in excess of 45 MMcf/d from four wells, comfortably above the original design specification of our process plant, JKX Chief Executive, Dr Paul Davies said in the release. Our next task is to replace the damaged tubing in well05 and bring it on production to utilize fully the recently upgraded plant capacity of 60 MMcf/d.

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Geographic Code:4EXRU
Date:Dec 9, 2015
Words:153
Previous Article:Russian Federation : Sberbanks mortgage loan portfolio reaches 2.155 trillion rubles.
Next Article:Saudi Arabia : Arabasco launches new Elite Service packages.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters