1. INTRODUCTION

Underground roadway design is complex, as it takes into account many different geological, mining and technical factors and relies on experience.

The methodology of designing the underground construction based on a flowchart was included, among others, in the Feng and Hudson (2011). It was shown that the method could equally relate to mining roadways. The scheme proposed in Feng and Hudson (2011) covers the direct design process of underground construction. The process is divided into seven stages, starting from the project purpose, key features of the site, then strategy, choice of modelling method, initial design, feedback information, and final design. Every stage of design establishes the essential tasks to be completed.

There is a slightly different approach in Canbulat (2010), who describes a process of designing the support in hard coal mines. While it is necessary to have an understanding of the mining and geological conditions applied in each case, the financial benefits related to possible support types are not analysed in early stages. Likewise, potential hazards from underground construction instability are not considered in the initial design.

During the design process there are some cases where the specific mining and geological conditions and roadway support schemes would be inappropriate, especially roadways at the great depths or in geologically disturbed regions. Currently, however, some mining roadways are driven at a depth of 1200 m or deeper and their frequency is expected to increase in the coming years. It therefore appears that there is a need to develop a design method which would maintain underground roadway stability, regardless of conditions.

Mishra and Rinne (2014) developed the geotechnical risk assessment ("GRA") method for underground workings, based both on qualitative parameters (available geotechnical data) and on quantitative parameters (such as mining design planning or support calculation). To assess the likelihood and consequences of mining working instability, Mishra and Rinne divided the evaluation process into three stages: identification of the hazards for a given site, selection of risk assessment parameters, and risk analysis. Using hazard identification tools and risk assessment parameters (with certain weight), they were able to assess if a risk exists, could be mitigated, or completely avoided.

In the case of soft rocks prone to separate, one of the most important stages of mining should be the proper design of supports to suit to the changing mining and geological situation. The situation can then be monitored by the geotechnical measurements in the rock mass (such as Wang and Fan, 2000).

In the terms of Polish coal mines, steel yielding supports are the main protection against rock movements, with one scheme of support usually developed for the whole mine, assuming the modified support scheme in the initial design can be optimised; that is, proper support for the working with changing mining and geological conditions (Malkowski et al., 2012).

Based on the existing methods of design as well as the authors' own research, this paper proposes a new method of hard coal mine roadways stability assessment. Based on geological, mining and technological data, two indices have been developed: Roadway Design Efficiency index ("RDE"), which indicates the extent of problems that can be associated with roadway designing; and Roadway Maintenance Functionality index ("RFM"), which indicates the difficulties that may occur during roadway use. Both indices are based on rating points and weightings for the factors obtained from the Analytic Hierarchy Process ("AHP") method of analysis. Some examples of method application with the in situ measurements results in the field have also been presented.

2. USING AHP METHOD FOR ROADWAYS DESIGNING

One of the most important aspects of underground construction design, including roadway support, is recognition of the physical properties of the rock mass while taking into consideration mining factors and geological conditions. The problems considered can be assumed as multi-criterial, because of the large number of varied factors, partly described qualitatively (rockburst energy, depth, rock quality designation RQD, for example) and partly described quantitatively (type of support, hydrogeological conditions, workmanship, etc). One method to solve this problem is AHP, which allows for the selection of factors and ranks their importance.

The AHP method has long been used as a tool for supporting a decision-making process in problematic and unequivocal situations (Saaty, 1980), although the method was also applied to more typical mining problems (Jamshidi et al., 2009; Namin et al., 2009; Guptaa and Kumarb, 2012). Surveys using AHP were also developed to determine the importance of natural, mining and technical factors for designing roadway supports and their maintenance (Malkowski et al., 2012). In total, 27 factors were considered, which were divided into three groups and two subgroups. By comparing each parameter to the next in the group, their importance in support design and roadway maintenance is considered to be: geological factors: 43.63 %, mining factors: 31.66 %, and technical factors: 24.71 %.

Pair wise comparison of the main groups of factors has shown that geological factors influence the effectiveness of roadway design in hard coal mines the most. It was also considered that technical factors are the least significant parameters in roadway maintenance.

The factors affecting the roadways design and maintenance derived by AHP and their rank are presented in Table 1.

The above results of the AHP analysis were used to develop indices for evaluating the effectiveness of roadway design and maintenance.

The identification of key factors which influence the roadway design process can also help in roadway stability maintenance evaluation for the specific time range. The research results presented have been examined closely with the relation to roadway stability and functionality.

The roadway cycle can be divided into three stages: designing, development and exploitation. Each stage is influenced by specific factors and the appropriate effect of the next stage can be reached only if only the high quality works are carried out in the previous stage.

It is possible to distinguish two stages of the potential effective design and effective functioning of the roadway. In the first or design stage, geological and mining factors should be analysed, together with the method of developing the roadway. The analysis allows for the evaluation of potential difficulties in maintaining roadway stability and in the support design process. In the second stage, technical factor analysis should be carried out, especially of, which allows for roadway maintenance assessment for a specific time range.

3. ROADWAY DESIGN EFFICIENCY INDEX AND ROADWAY FUNCTIONALITY MAINTENANCE INDEX

In order to assess the level of support design efficiency, results of AHP research were used (Niedbalski, 2014). Based on the individual feature hierarchy, a point algorithm has been created. Each factor and its influence ratio on support design efficiency and roadway functionality is shown in Tables 3, 4, 5 and 7. The sum of the weight of the factors was 100%. Because of the important role of geomechanical rock properties in the design and maintenance process, it was assumed that these properties are equivalent to the mining and geological factors (Canbulat, 2010; Malkowski et al., 2012; Protosenya and Trushko, 2013). The range of any factor variation fits the five class from the highest, which have a positive influence the design process (the influence ratio equals 1.0), to the lowest, which makes the design process difficult (the influence ratio equals 0.2). The influence ratios have been adjusted to the factors on the basis of the authors' many years of experience in roadway support design in coal mines. All of the factors with the weight below 10 % have been discounted in the evaluation system as inessential for a mining practice.

A range of factor variations has been developed by the authors, based on their experience in roadway support design for the hard coal mines. The slakeability index r was developed by the Central Mining Institute in Poland. The slakeablity test requires that a sample of rock is immersed in water for 24 hours, dried for 24 hours, and again immersed into the water for 24 hours (Kidybinski, 2004). The Table 2 shows the slakeability index r in relation to rock behaviour after a water treatment. Table 3 shows the range of geological factor variation [N.sub.N]. It is worth noting that all chosen geological and mining factors can affect the change of a vertical or horizontal stress around the roadway. The geomechanical and mining factors, with their range of variation, are given in Tables 4 and 5, respectively.

The factors shown in Tables 3-5 allow a new parameter, Roadway Design Efficiency index RDE to be proposed to describe the scale of difficulties in the proper support design for the specific mining and geological conditions (Niedbalski, 2014), which is calculated as:

RDE = [SIGMA] ([N.sub.N], [N.sub.GM], [N.sub.G]) (1)

where:

* [N.sub.N] the sum of points for geological factors, calculated from Table 3, as:

[N.sub.N] = [[SIGMA].sup.i=1.sub.i=1] [w.sub.pi] x [w.sub.wi] (2)

* [N.sub.GM] the sum of points for geomechanical factors, calculated from Table 4, as:

[N.sub.Gm] = [[SIGMA].sup.i=7.sub.i=1] [w.sub.pi] x [w.sub.wi] (3)

* [N.sub.G] the sum of points for mining factors, calculated from Table 5, as:

[N.sub.G] = [[SIGMA].sup.i=6.sub.i=1] [w.sub.pi] x [w.sub.wi] (4)

* [w.sub.pi] the weight of the specific factor, % (from Tables 3 - 5); and

* [w.sub.wi] the influence ratio of the specific factor (from Tables 3 - 5).

Given the most favourable mining and geological conditions, where every factor gets the highest possible mark, the support design efficiency index RDE will be 300; similarly, applying the least favourable conditions results in the poorest marks, resulting in an RDE index of 60. Six class ranks were developed (Table 6), where class VI means the lack of possibilities to design a safe support which immediately suggests the roadway needs to be relocated.

The second stage of the efficiency evaluation is the assessment of the roadway stability in the required time period for the chosen technical solutions. The most important is a support type selection and its parameters which mainly determines roadway stability (Table 1, factors Nos. 1, 3 and 6). It is worth pointing out that it can only be estimated, since it is only possible to assess the workmanship after driving is completed (Table 1, factor No. 2).

Based on data included in Table 7 and RDE index, Roadway Functionality Maintenance index RFM was developed. The RFM index is conditional on the RDE index, because the geological and mining conditions are also essential for maintaining roadway stability in the future. The formula to obtain the RFM index is as follows:

RFM = [N.sub.T] RDE/RD[E.sub.max] (5)

where:

[N.sub.T] the sum of points for technical factors, calculated from Table 7, as:

[N.sub.T] = [[SIGMA].sup.i=7.sub.i=1] [w.sub.pi] x [w.sub.wi] (6)

RDE the running value of Roadway Design Efficiency index; and

[RDE.sub.max] the maximum value of Roadway Design Efficiency index equal 300.

Using formula (5), the potential roadway stability maintenance classification was developed (Table 8). The RFM index ranges from 4 to 100 points with six classes of stability maintenance.

The proposed methodology allows the level of difficulties to be evaluated in keeping with roadways stability and functionality, not only for design workings, but also for existing roadways. Furthermore, there is a possibility to verify factors and their changes if the mining conditions have been altered or if new geological or geomechanical data becomes available. The change of mining conditions along the roadway can be met by the roadway division into some sections during the design process. The change in geological conditions comes after working construction completion forces a new support scheme to be designed. For practical application, the permanent support should be designed for the best mining and geological conditions. Every predicted deterioration of the conditions will decrease the RDE index and indicate the necessity of support reinforcement. Given it that the RDE value ranges from 60 to 300, the range of change is therefore 240. One can therefore assume that the load capacity of support system should increase by 0.10 MN for every 20 point reduction in RDE (Fig. 1). It enables unequivocal prediction of required support reinforcement in relation to RDE index value. The proposed load capacity increment meets current construction and technical limits in this field (Niedbalski, 2014).

The methodology can be used for a both newly designed workings, for which the current mining and geological conditions are set, and for those where changes of conditions were predicted. In the case of altered technical factors (Table 5), the load capacity of support system should be changed based on the RFM index (Fig. 2). The difference between the support size and roadway cross-section size and the workmanship accuracy can greatly affect the RFM index. As a consequence, since support system overloading and working convergence can occur, an increase of support construction load bearing capacity by 0.4 MN/m per every 25 RFM index points is proposed.

Engineers should react quickly to geological or mining conditions changes which can lead to a deterioration of roadway functionality or loss of roadway stability.

Simple monitoring methods should be used to control the state of the support and rock mass around the roadway, including convergence measurements, roof rocks displacement or separation measurements, or yielding support clamps displacement.

[FIGURE 1 OMITTED]

[FIGURE 2 OMITTED]

4. CASE STUDIES: RDE AND RFM APPLICATION

RDE and RFM indices were tested for hard coal mine workings to verify their usefulness. The research has been done in workings where the measurements of damage zone in the roof together with the loads on support frames were being carried out with the help of a borehole endoscope. Endoscopic investigation is the best quantitative control of rocks behaviour around the roadways (Majcherczyk et al., 2005, Prusek & Bock, 2008, Niedbalski et al., 2013). Loads on support frames or performance characteristics of a friction joint in a yielding support as well as the measurement of forces in the instrumented bolt in a roof, in turn, can be good indicators of a support selection (Singh et al., 2004, Brodny 2010, Niedbalski et al. 2013, Majcherczyk et al., 2014). Two or three working sections were investigated. Values of the evaluated RDE index have been compared with the damage zone parameters: range of damage zone, number of fractures and their separation. Values of RFM index were compared with loads on selected supports. The selected workings included varied mining and geological conditions and varied depth in some hard coal mines in Silesian Coal Basin. The evaluated RDE index and RFM index for these roadways are presented in Table 9.

[FIGURE 3 OMITTED]

[FIGURE 4 OMITTED]

[FIGURE 5 OMITTED]

[FIGURE 6 OMITTED]

The total value of the RDE index for the selected workings is between 194.7 (test roadway Cw-1 -342 m) and 270.3 (shaft II bypass--108 m), resulting in an RDE class for the specific workings of I, II, or III, showing that geological and mining conditions are favourable for design (class I), or can be slightly unfavourable (class III). Generally, the conditions around the design workings were similar and their drivage was planned in favourable or average mining and geological conditions. The assessment of geological, geomechanical, and mining factors, based on the point scale, shows that the highest values were given to mining factors, up to 100 points in some cases. This was due to roadways being located in a new mining field with no geological disturbance or previous mining activity. Any change caused by the new mining operations will decrease both this and the RDE index. In this case, based on Figure 1, the engineers should consider a change in support construction.

The RFM index shows that roadway stability can be maintained with some or even real difficulties (class III or IV). It shows that nearly all of the development workings in Silesian Coal Mines are driven in rather fair geological and mining conditions.

The RDE and RFM indices for selected workings were compared with the damage zone parameters in the roof controlled by endoscopic measurements. The range of fracture zones in the roof, change of fracture numbers, and their separation are the most common signs of working instability. Investigations in the field have been carried out for a minimum of one year, which allowed the most intensive rock mass movements to stabilize and a state close to secondary equilibrium. The results have been processed with the help of Statistica software with the 95 % confidence level (StatSoft, 2011).

Analysis of the relationship between the RDE index and the in situ measurements was carried out at over 20 sections of selected roadways, resulting in correlation coefficients r of 0.71 to 0.79. (Figs. 3, 4 and 5). These values are quite high, giving the coefficient of determination [r.sup.2] of 0.50 to 0.63, which is satisfactory. The RDE index value drops with number of fracture in the roof (Fig. 3), roof rocks separation (Fig. 4), as well as with higher damage zone above the roadway (Fig. 5). The figures confirm that RDE index can predict the rock mass behaviour around the monitored workings.

[FIGURE 7 OMITTED]

It should be emphasised that the load bearing capacity of the designed support does not suit the RDE index (Fig. 6). There is no correlation (no fit has been done to this point cloud), which suggests that the support selection is not properly adjusted to its predicted performance characteristics. As a consequence, there are weak relationships between RFM index and the loads on the support. In the case of support frames measured with the help of hydraulic dynamometers, there is a relatively weak linear correlation (r = 0.51), but which shows a visible tendency of the load increase on the support frames together with the RFM index reduction (Fig. 7). There is no correlation between the loads on the bolts and RFM index (Fig. 8); however, it should be emphasised that there was a combined steel arch support construction with bolting in the majority of analysed roadways, which probably prevents the roof strata moving down naturally.

There are exceptionally random distribution of measured values, where some factors dominate the others, which lead to other distribution then a normal one. It consider mostly endoscopic research parameters which depends on different factors as, for example: a roof bedding (some roof strata were bedded intensively), a type of support (roofbolting prevents the roof strata from a separation), the way of driving (the rock mass is more damaged by blasting) or mining situation (the exploitation edges, pillars, goafs, the distance to previously mined seams). Some of investigated data suit Shapiro-Wilk test distribution, which is more appropriate for small sample sizes.

It is worth noting that while some results are beyond the assumed confidence level due to a lack of statistical measurements, it should be borne in mind that such investigations are still in progress.

[FIGURE 8 OMITTED]

5. SUMMARY

On the basis of the geological, mining and technical factors which influence roadway stability, two indices were developed: Roadway Design Efficiency index, RDE, and Roadway Functionality Maintenance index, RFM. Both should be used at a working design stage. Based on geological, geomechanical and mining, RDE shows the potential difficulties in maintaining roadway stability and in the support design process. RFM takes into consideration the technical factors and assesses the roadway maintenance for a specific time range.

The RDE and RFM indice values were verified from underground measurements taken from selected roadways in the Silesian Coal Basin. Analysing the relationships between the RDE index and rock mass damage parameters around the workings, gives a competent correlation, given the coefficient of determination [r.sup.2] of 0.50 to 0.63. The correlation between RFM index and support performance controlled by the load on the support frames ([r.sup.2] = 0.26) is poorer; however, in situ research confirms that both indices can be good indicators of roadways stability at a design stage.

The proposed methods of roadways and their support design and roadways functionality control seem to bring practical and economic advantages. The practical advantage of this solution is that it is possible to design the one basic support scheme for the most favourable conditions and reinforcement methods matched to this support. It helps shorten the decision process both when the support construction is overloaded, either due to a predicted fault or mining exploitation or induced by unexpected geological disturbances, or when the load capacity of the support decreases due to rock strength increase, or the lack of expected tectonic disturbance.

Further analyses and mining investigations for geological, mining and technical factors calibration should be continued as only research carried out in different mining regions can verify the indices and the weight of their factors quantitatively. These should include not only rock mass behaviour, such as observing beds separation in a roof, loads on the support or the damage zone range evaluation around the working, but other results of ground control measurement, such as a convergence.

DOI:10.13168/AGG.2016.0002

ARTICLE INFO

Article history:

Received 10 October 2015

Accepted 22 January 2016

Available online 12 February 2016

REFERENCES

Brodny, J.: 2010, Determining the working characteristic of a friction joint in a yielding support. Archives of Mining Sciences, 55, No 4, 733-746.

Canbulat, I.: 2010, Roadway roof support design in critical areas at Anglo American Metallurgical Coal's underground operations. Underground Coal Operators' Conference, University of Wollongong & the Australasian Institute of Mining and Metallurgy, 50-72.

Feng, X.T. and Hudson, J.A.: 2011, Rock engineering design. London: CRC Press, Taylor & Francis.

Guptaa, S. and Kumarb, U.: 2012, An analytical hierarchy process (AHP)-guided decision model for underground mining method selection. International Journal of Mining, Reclamation and Environment, 26, Issue 4, 324-336. DOI: 10.1080/17480930.2011.622480

Jamshidi, M., Ataei, M., Sereshki, F. and Jalali Seyed, M.E.: 2009, The application of AHP approach to selection of optimum underground mining method. Case study: Jajarm Bauxite Mine (Iran). Archives of Mining Science, 54, No. 1, 103-117.

Kidybinski, A.: 2004, Geotechnical aspects of adaptation of the terminated coal mine workings for underground gas storage caverns. Quarterly Mining and Environment, No. 2, Central Mining Institute, 37-63, (in Polish).

Majcherczyk, T., Matkowski, P. and Niedbalski, Z.: 2005, Describing quality of rocks around underground headings: Endoscopic observations of fractures. Proceedings of Eurock 2005: Impact of human activity on the geological environment, Brno 18-20.05, 355-360.

Majcherczyk, T., Malkowski, P., Niedbalski, Z. and Bednarek L.: 2014, Analysis of yielding steel arch support with rock bolts in mine roadways stability aspect. Archives of Mining Sciences, 59, 3, 641-654. DOI: 10.2478/amsc-2014-0045

Malkowski, P., Majcherczyk, T. and Niedbalski, Z.: 2012, Multi-criterion analysis of factors affecting maintenance of roadways. AGH Journal of Mining and Geoengineering, 36, No. 1, 243-252.

Mishra, R.K. and Rinne M.: 2014, Guidelines to design the scope of a geotechnical risk assessment for underground mines. Journal of Mining Science, 50, No. 4, 745-756, DOI: 10.1134/S1062739114040152

Niedbalski, Z.: 2014, Functionality maintenance of headings in hard coal mines: a proposal for prognosis methodology. Wydawnictwa AGH, Krakow, (in Polish).

Niedbalski, Z., Malkowski, P. and Majcherczyk, T.: 2013, Monitoring of stand-and-roof-bolting support: design optimization. Acta Geodyn. Geomater., 10, 2, 215-226. DOI: 10.13168/AGG.2013.0022

Namin, F.S., Shahriar, K., Bascetin, A. and Ghodsypour, S.H.: 2009, Practical applications from decisionmaking techniques for selection of suitable mining method in Iran. Mineral Resources Management, 25, 3, 57-77.

Protosenya, A.G. and Trushko, V.L.: 2013, Forecast of excavation stability in weak Iron ore in terms of the Yakovlevsky Deposit. Journal of Mining Science, 49, No. 4, 557-566.

Prusek, S. and Bock, S.: 2008, Assessment of rock mass stresses and deformations around mine workings based on three-dimensional numerical modelling. Archives of Mining Sciences, 53, 3, 349-360.

Saaty, T.L.: 1980, The Analytic Hierarchy Process. McGraw Hill, New York.

Singh, R., Singh, A.K., Mandal, P.K., Singh, M.K. and Sinha, A.: 2004, Instrumentation and monitoring of strata movement during underground mining of coal. Minetech, 25, No. 5, 12-26.

StatSoft, Inc.: 2011, STATISTICA, version 10. www.statsoft.com.

Wang, T. and Fan, Q.: 2000, Optimization of soft rock engineering with particular reference to coal mining. International Journal of Rock Mechanics and Mining Sciences, 37, 535-542. DOI: 10.1016/S1365-1609(99)00080-5

Piotr MALKOWSKI *, Zbigniew NIEDBALSKI and Tadeusz MAJCHERCZYK

AGH University of Science and Technology, al. Mickiewicza 30, 30-059 Krakow, Poland

* Corresponding author's e-mail malkgeom@agh.edu.pl
Table 1 Factors affecting the roadways design
and their maintenance derived by AHP.

                    Factor and its weight [%]

No.           Geological                   Geomechanical

1     Distance between fault and     Rock quality designation
            roadway - 20.6                  RQD - 21.7

2       Seismic activity - 17.4      UCS weighted avarage for
                                          the roof - 20.9

3            Geomechanical          Brasilian tensile strength
           parameters - 17.2            of the roof - 15.3

4       Drivage along the fault      UCS weighted avarage for
              zone - 16.9                 the wall - 13.6

5        The thin beds in the        Slakeability of the roof
         immediate roof - 9.3               rock - 13.3

6           Hydrogeological            UCS weighted avarage
           conditions - 8.0             for the floor - 8.3

7      Drivage in the fold - 6.1        Unit weight of the
                                       immediate roof - 7.1

8      Rock beds gradient - 4.5

9

                     Factor and its weight [%]

No.             Mining                       Technical

1        Exploitation workings         Load capacity of the
             nearby - 24.3             support system - 24.7

2          Exploitation edge           Precision of support
           influence - 23.5             workmanship - 14.3

3         Pillars and unmined         Type of support - 13.6
          areas nearby - 20.8

4          The goafs - 18.1            Time range of roadway
                                        maintenance - 13.6

5           The depth - 7.8           The roadway's size and
                                            shape -12.8

6     Other roadways nearby - 5.4      Type of lagging - 9.3

7                                   Drivage with blasting - 5.1

8                                        Speed of roadway
                                           drivage - 3.2

9                                   Drivage with shearer - 3.1

Table 2 Description of slakeability and value of r index.

No.   Description                               Index r

1     Water does not change a rock                1.0
      structure and cohesion
2     The rock cracks parallel to the beds        0.8
3     The rock crack parallel to the beds         0.6
      and perpendicular to them
4     The rock cracks dense                       0.4
5     The rock structure changes into debris      0.2
6     The rock changes into mud                   0.1

Table 3 The range of geological factor variation Nn.

                                     The weight
No.              Factor             of the factor
                                    [w.sub.p] [%]

1          The fault crossed            28.6
              the roadway

2           Seismic activity            24.1

3       Drivage along the fault         23.4
                  zone

         The thin beds lying in
4          the immediate roof           12.9
                (6-8 m)

5      Hydrogeological conditions       11.0

                                                           Influence
No.                 The factor description                   ratio
                                                           [w.sub.w]

                             none                              1
1                  throw of fault up to 2 m                   0.8
                   throw of fault up to 5 m                   0.6
                   throw of fault up to 10 m                  0.4
                   throw of fault above 10 m                  0.2

                             none                              1
              rockbursts with energy up to 10E3 J             0.8
2             rockbursts with energy up to 10E4 J             0.6
              rockbursts with energy up to 10E5 J             0.4
              rockbursts with energy over 10E5 J              0,2

                             none                              1
                   throw of fault up to 10 m                  0.8
3                  throw of fault up to 20 m                  0.6
                   throw of fault up to 50 m                  0.4
                   drivage in the fault zone                  0.2

              beds with the thickness of over 3 m              1
              beds with the thickness of over 2 m             0.8
4            beds with the thickness of over 0.5 m            0.6
             beds with the thickness of over 0.2 m            0.4
            beds with the thickness of under 0.2 m            0.2

         no water levels--impermeable rocks in a roof          1
          no water levels--permeable rocks in a roof          0.8
5        water level above the roof--impermeable rocks        0.6
           in a roof with the thickness of over 8 m
       water level above the roof--impermeable rocks in       0.4
          a roof with the thickness of less than 8 m
       water level above the roof--permeable roof rocks       0.2

Table 4 The range of geomechanical factor variation [N.sub.Gm].

                                     The weight
No.              Factor             of the factor
                                    [w.sub.p] [%]

1                 RQD                   25.6

2           UCS of the roof             24.5
            [[sigma].sub.cr]

       Brazilian tensile strength
3             of the roof               18.1
            [[sigma].sub.tr]

4           UCS of the side             16.1
            [[sigma].sub.cs]

              Slakeability
5                  r                    15.7
           (Kidybinski, 2004)

                                           Influence
No.               The factor                 ratio
                  description              [w.sub.w]

                   over 90 %                   1
                   over 75 %                  0.8
1                  over 50 %                  0.6
                   over 25 %                  0.4
                  below 25 %                  0.2

                  over 80 MPa                  1
2                 over 60 MPa                 0.8
                  over 40 MPa                 0.6
                  over 20 MPa                 0.4
                 up to 20 MPa                 0.2

                  over 8 MPa                   1
                  over 6 MPa                  0.8
3                 over 4 MPa                  0.6
                  over 2 MPa                  0.4
                  up to 2 MPa                 0.2

                  over 40 MPa                  1
4                 over 30 MPa                 0.8
                  over 20 MPa                 0.6
                  over 10 MPa                 0.4
                 up to 10 MPa                 0.2

                     r =1                      1
       r [greater than or equal to] 0.8       0.8
5      r [greater than or equal to] 0.6       0.6
       r [greater than or equal to] 0.4       0.4
       r [greater than or equal to] 0.2       0.2

Table 5 The range of mining factor variation [N.sub.Gr].

No          Factor           The weight
                            of the factor
                            [w.sub.p] [%]

         Exploitation
1       workings nearby         28.0

2        Exploitation
        edge influence          27.1

3     Pillars and unmined
         areas nearby           24.1

4          The goafs            20.8

No               The factor description              Influence
                                                       ratio
                                                     [w.sub.w]

                          none                           1
         yes, h [less than or equal to] 2 m *,          0.8
              with a distance of over 50 m
1      yes, h > 2 m, with a distance of over 50 m       0.6
        yes, h [less than or equal to] 2 m, with        0.4
                a distance of below 50 m
      yes, h > 2 m, with a distance of below 50 m       0.2

                        D > 80 m                         1
                        D > 60 m                        0.8
2                       D > 40 m                        0.6
           D [greater than or equal to] 20 m            0.4
                        D < 20 m                        0.2

                          none                           1
          shaft pillar or full-mined coal seam          0.8
3          barrier pillar, a width over 50 m            0.6
           barrier pillar, a width over 25 m            0.4
           barrier pillar, a width below 25 m           0.2

                          none                           1
            below the seam or above the seam            0.8
4            in the seam, distance 50-100 m             0.6
             in the seam, distance 20-50 m              0.4
            in the seam, distance below 20 m            0.2

* the height of a longwall panel

Table 6 The efficiency of designing a roadway
support in the hard coal mines.

Class   Description                                          RDE index
                                                             [points]

I       Very favourable mining and geological                 261-300
        conditions for designing

II      Favourable mining and geological conditions           221-260
        for designing

III     Average mining and geological conditions              181-220
        for designing

IV      Unfavourable mining and geological conditions         141-180
        for designing

V       Very unfavourable mining and geological               101-141
        conditions for designing

VI      Lack of possibilities to design a safe support        60-100

Table 7 The range of technical factor variation [N.sub.T]

No.            Factor            The weight
                                of the factor
                                [w.sub.p] [%]

1       Load capacity of the        27.9
           support system

2       Precision of support        16.1
            workmanship

3         Type of support           15.8

4      Time range of roadway        15.3
            maintenance

5      Roadway size and shape       14.4

6         Type of lagging           10.5

No.             The factor description             Influence ratio
                                                      [w.sub.w]

                     N > 400 kN/m                         1
1         N [less than or equal to] 400 kN/m             0.8
          N [less than or equal to] 300 kN/m             0.6
          N [less than or equal to] 200 kN/m             0.4
          N [less than or equal to] 100 kN/m             0.2

                       very good                          1
2                        good                            0.8
                        average                          0.6
                         poor                            0.4
                       very poor                         0.2

            Steel yielding support with the               1
            additional roof beams along the
              working bolted to the roof
          Steel yielding support with bolting            0.8
                  between the arches
3        Steel yielding support with a bolted            0.6
           roof-bar; steel yielding support
            reinforced with beams on props;
                  rigid steel support
          Rockbolting; steel yielding support            0.4
       reinforced with steel/wooden beams along
          the working Steel yielding support             0.2

                     up to 1 year                         1
4                    up to 2 years                       0.8
                     up to 5 years                       0.6
                    up to 10 years                       0.4
                 longer than 10 years                    0.2

            arched: width<5 m; height<3.5 m               1
       arched: width [greater than or equal to]          0.8
        5 m; height [greater than or equal to]
                         3.5 m
5      arched: width [greater than or equal to]          0.6
        7 m; height [greater than or equal to]
                         4.5 m
          rectangular: width<6 m; height<3 m             0.4
           rectangular: width [greater than              0.2
        or equal to] 6 m; height [greater than
                   or equal to] 3 m

         Steel heavy chain screen mesh + grout            1
                    lagging system
         Concrete blocks + loose rock lagging            0.8
6        Steel heavy chain screen mesh + loose           0.6
                     rock lagging
         Steel chain screen mesh + loose rock            0.4
                        lagging
          Steel hook screen mesh + loose rock            0.2
                        lagging

Table 8 The classification of roadways stability
maintenance effectiveness in the hard coal mines.

Class            Description            RFM index
                                        [points]

I       Roadway stability maintained    86 - 100
               in an easy way

II      Roadway stability maintained     71 - 85
            without difficulties

III     Roadway stability maintained     56 - 70
           with some difficulties

IV      Roadway stability maintained     41 - 55
           with real difficulties

V       Roadway stability maintained     26 - 40
         with critical difficulties

VI         No way of maintain the        4 - 25
              roadway stability

Table 9 Roadway Design Efficiency index and Roadway
Functionality Maintenance index for selected hard
coal mine workings.

Workings            Borehole   Geologi-    Geome-    Mining
name                position     cal      chanical   factors
                      [m]      factors    factors

                                           Points

Western incline        35        92.2       68.0      100.0

Western incline       215        92.6       76.5      94.4

Western incline       326        92.6       78.0      94.4

Belt incline C-3      110        95.2       46.3      100.0

Belt incline C-3      163        97.8       65.1      100.0

Belt incline C-3      260        90.0       63.5      100.0

Connection             67        76.4       76.9      83.8
roadway Z-3

Connection            342        79.0       72.0      83.8
roadway Z-3

Test roadway          155        85.6       49.7      67.0
Cw-1

Test roadway          342        83.0       44.8      67.0
Cw-1

Gateroad              216        80.4       68.4      72.4
2-Z1. Z2

Gateroad B-7          248        84.8       65.0      83.2

Gateroad B-7          959        87.8       58.1      100.0

Gateroad B-3          292        92.6       68.2      60.9

Gateroad B-3          371        89.6       64.6      60.9

Western
roadway              237.9       83.3       54.7      100.0
level 1050

Vent. roadway W1     953.5       94.8       50.7      100.0
level 1000

Roadway W             456        94.8       66.1      100.0
level 838

Shaft II bypass       108        91.2       79.1      100.0

Cutter IV             110        54.5       41.2      100.0

Minimum                          54.5       41.2      60.9

Maximum                          97.8       79.1      100.0

Workings             RDE     RDE    Techni-    RFM     RFM
name                index   class     cal     index   class
                                    factors

                                    Points

Western incline     260.2    II      62.7     54.4     IV

Western incline     263.5     I      62.7     55.1     III

Western incline     265.0     I      62.7     55.4     III

Belt incline C-3    241.5    II      56.4     45.4     IV

Belt incline C-3    262.9     I      56.4     49.4     IV

Belt incline C-3    253.6    II      56.4     47.7     IV

Connection          237.0    II      56.5     44.7     IV
roadway Z-3

Connection          234.7    II      66.0     51.6     IV
roadway Z-3

Test roadway        202.2    III     74.7     50.3     IV
Cw-1

Test roadway        194.7    III     69.1     44.9     IV
Cw-1

Gateroad            221.1    II      63.3     46.7     IV
2-Z1. Z2

Gateroad B-7        233.0    II      74.4     57.8     III

Gateroad B-7        245.9    II      80.7     66.2     III

Gateroad B-3        221.8    II      59.4     43.9     IV

Gateroad B-3        215.2    III     71.3     51.2     IV

Western
roadway             238.0    II      69.0     54.7     IV
level 1050

Vent. roadway W1    245.5    II      74.2     60.7     III
level 1000

Roadway W           260.9    II      57.4     49.9     IV
level 838

Shaft II bypass     270.3     I      64.6     58.2     III

Cutter IV           195.7    III     77.5     50.6     IV

Minimum             194.7    III     56.4     43.9     IV

Maximum             270.3     I      80.7     66.2     III
COPYRIGHT 2016 Akademie Ved Ceske Republiky, Ustav Struktury a Mechaniky Hornin
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2016 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Original paper
Author:Malkowski, Piotr; Niedbalski, Zbigniew; Majcherczyk, Tadeusz
Publication:Acta Geodynamica et Geromaterialia
Article Type:Report
Date:Apr 1, 2016
Words:6132
Previous Article:Experimental measurement at the seismic station Ostrava-Krasne pole (OKC): preliminary results and remarks on site effect at the studied locality.
Next Article:The use of geoelectrical method in preliminary investigation of the Fredro Family's iron mine adit in the village of Cisna, the Bieszczady Mountains,...
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters