Printer Friendly

Richmond/sunset districts sewer replacement & pavement renovation.

Tenders are invited for Replace existing sewer and street pavement on various streets. Trench and excavation support for sewer work. 39 EA concrete manhole for 12" to 24" diameter sewers with frame and cover. 9 EA clean and mortar existing brick manhole; 9,934 LF of 12" - 21" VCP Sewer; 204 LF of 10" - 16" HDPE; 60 LF of 20" steel casing by boring; Bypass main sewer flow related to trenchless work. 630 EA of television inspection of existing 6" or 8" diameter side sewer and 10" culvert. 50 CY exploratory potholes, 35 CY controlled density fill bedding material for water main and AWSS facilities within the sewer trench prior to backfill. 375,000 SF full depth planing per 2" depth of cut. Sidewalk, pavement marking, manhole adjust.

Bid Date & Time: 05/12/16 2:00 PM

Notes: A pre-bid and contractor networking conference to be held at 1680 Mission Street, 2nd floor Conference Room, at 10AM on April 26, 2016. The LBE Subcontracting Participation Requirement is 20%. MBE 6.90%, WBE 2.80%, OBE 10.30%. Additional POC: Marcus Lange, Ph: 415-554-3106. Ken Nim, Ph: 415-701-4848.

Est. Low Value: $7,400,000

Est. High Value: $7,400,000

Bond: 10% bid bond

Prebid: 04/26/16 10:00 AM

Major organization : SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION

Address : 525 Golden Gate Avenue, 3rd Floor - Tuolumne Room

City: San Francisco,

CA, 94102

Attn: Pauline Lam

Country :United States

Url : http://sfwater.org/

Tender notice number : WW-618, CWWRNRCSD5

Notice type : Tender Notice

Open date : 2016-05-12

Tender documents : T33175093.html

[c] 2016 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2016 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2016 Gale, Cengage Learning. All rights reserved.

 
Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Apr 20, 2016
Words:272
Previous Article:Municipal Separate Storm Sewer System Program Support.
Next Article:Heating & ventilation improvements, administration building, phase 1 *rebid*.

Terms of use | Privacy policy | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters