Printer Friendly

Providing sets of pneumatic hoses stainless steel trolleys of 84 as part of their modernization.

Contract notice: Providing sets of pneumatic hoses stainless steel trolleys of 84 as part of their modernization.

Founiture sets of tires stainless steel pipes, diameters 1/4 inch, 1/2 inch and 1 inch of trolleys OF 84 as part of their modernization. : Based on these sets: pneumatic power brake systems and auxiliaries. : Each set will include 50 steel pipe and bent to form in a pattern supplied by SNCF. Each pipe shall be provided with pneumatic connections for their mounting components and clamps. The pneumatic connections must comply with the VBO mounting (mounting only approved by the SNCF pneumatic brake). Each pipe and fittings will be delivered in an envelope marked following the drawing station. : The implementation of these projects will be carried out on trolleys by SNCF. : SNCF select up to 5 candidates.

Language(s) in which tenders or requests to participate may be drawn up:

French.

Tender documents : T16494633.html

2013 Al Bawaba (Albawaba.com)

Provided by Syndigate.info an Albawaba.com company
COPYRIGHT 2013 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2013 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jun 8, 2013
Words:166
Previous Article:Earthworks, art works, restore communications and roads) for the elimination of level crossings.
Next Article:Studies in soil soil piezometric studies, permeability and geotechnical - zac multisite jouy-le-moutier (95).
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters