Printer Friendly

Provide a range of technical support.

Contract Awarded to Provide a range of technical support.

Some specific areas under this contract are as follows:

Software Process Improvement

Software Engineering

Asset Development

Product Training and Deployment

Project Management

System Engineering

The TEPIT Directorate is part of the U.S. Army Armament Research, Development, and Engineering Center (ARDEC); according to their website, they are " r ecognized as DoD's foremost provider of network lethality tactical fire control solutions, emergency management, force protection, interactive technologies and training for armament systems to equip, modernize and sustain the Joint Forces." WisEngineering has been providing a host of services to the TEPIT Directorate under several other contract vehicles. Specific projects include:

Graphics, Interactive Technologies, and Multimedia (GITM): Development of 3D interactive training systems for a range of tasks pertaining to weapon systems and Army processes.

Keystone: Software development to link together disparate Emergency Management and Force Protection systems through information sharing protocols.

Fire Control Systems: Varied support for Fire Control enhancements including distributed fires, radar integration, and others.

Contractor name : WISENGINEERING

Contractor address : 3159 Schrader Rd,

Dover,

NJ 07801

Implementing agency : Tactical Effects Protection and Interactive Technologies Directorate

Country :United States

Url : www.wisengineering.org/

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Aug 11, 2015
Words:205
Previous Article:Complete a pilot scale demonstration and evaluation of its Selen-IX technology to remove selenium from mine water.
Next Article:Build the Tees Renewable Energy Plant, a 299MW CHP project.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters