Printer Friendly

Provide Road bridge construction work.

Prior Information Notice: Dillenburg: Road bridge construction work

A45 replacement construction of the viaduct lE-tzelbach

Replacement construction Viaduct a, length 270 m, built in 1967, old design: prestressed concrete box girders, deck area: 8140 mA, demolished concrete substructures and superstructures: 10 500 mA, demolition scaffolding, excavation: approximately 52 000 mA, Installation: 4 000 mA, filling: approximately 52 000 mA, piles d = 1.20 m: 580 m, d = 1.50 m: 155 m, reinforced concrete for substructures: 15 800 mA, rebar for substructures: about 3 500 tons, new superstructure as composite steel girders, producing the incremental launching method, 2 300 tons structural steel, 30 000 mA corrosion superstructures

Tender documents : T14544328.html

2012 Al Bawaba (Albawaba.com)

Provided by Syndigate.info an Albawaba.com company
COPYRIGHT 2013 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2013 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jan 29, 2013
Words:124
Previous Article:Design services tga electric (asset group 4, 5 and 6) pursuant to A* 53 hoai lph 2-8. for the construction of a center for drug discovery and...
Next Article:Vmware enterprise license agreement and support agreement including subsription.
Topics:

Terms of use | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters