Printer Friendly

Provide 120 Ge2.5-116 90-meter Turbines For The Santa Rita Wind Farm.

Contract Awarded to Provide 120 GE2.5-116 90-meter turbines for the Santa Rita wind farm in Reagan County, Texas.

Contract awarded: May 2017

The 300MW wind farm is expected to be commissioned in 2018. A portion of the turbines installed at the Santa Rita wind farm will include blades manufactured by LM Wind Power, which was recently acquired by GE Renewable Energy. GE will also implement their Digital Wind Farm solutions, including software to support wind operations including Asset Performance Management analytic capabilities and cyber security through its SCADA secure edition.

Contractor name : GENERAL ELECTRIC RENEWABLE ENERGY

Contractor address : 3135 Easton Turnpike

Fairfield, CT 06828

Implementing agency : Invenergy

One South Wacker Drive

Suite 1800

Chicago, IL 60606

United States

Tel : (312) 224-1400

Fax: (312) 224-1444

https://invenergyllc.com

Country :United States

Url : https://www.ge.com

[c] 2017 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jun 2, 2017
Words:149
Previous Article:Construction Contract For The Northern Gas Pipeline (ngp) Project.
Next Article:Facilities Required As Part Of The Integrated Oil And Gas Expansion.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters