Printer Friendly

Painting work.

Contract award: conversion and extension of the operating theater ukmp.

The 3-storey building with a flat roof profile is done right after the existing Party wall of the existing building function and extends to a length of about 19 m and a width of 20 meters, the building height is about 9.5 m above the ground , The existing building closes at the same height as the new building and has a length of about 19 m and the same width as the new building. When Zwischenbau the connecting corridor is widened in the EC and this gets on the northeastern side a new flat roof insulation strips including gradient and plastic roofing. Upstairs the breaker, a new glass walkway is placed on the widened EC hallway ceiling, which consists of a structural steel supporting structure and a trapezoidal roof surface. Painting on walls, ceilings and coatings on metal, floor coatings (2-component epoxy or 1-K up dust) and wall protection made of plastic. Painting walls about 5 000 m2.

Painting the ceiling about 2 000 m2.

Coating on metal approximately 100 m2.

Floor coatings approximately 800 m2.

Wall Protection Plastic approximately 500 m.

Number of offers received: 10

Contractor name : FA. KLAPF GMBH

Contractor address : Gewerbepark 23

85250 AltomE-nster

GERMANY

Financier : -

Implementing agency : MTC GmbH

Germeringer Str. 32

For the attention of: Herrn Etzdorf

82152 Planegg

GERMANY

E-mail: vergabe@ukmp.de

Country :Germany

2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Mar 21, 2015
Words:245
Previous Article:Vocational college construction work.
Next Article:Workshops construction work.

Terms of use | Copyright © 2017 Farlex, Inc. | Feedback | For webmasters