Operation of Blast Furnace is quite complex in nature that relies on multiple technological aspect. To keep its operation in the safe zone it has to be operated non-stop on its rated capacity. Extended low production process is very detrimental for Blast Furnace refractory which unfortunately has been done perforce during last couple of years due to shortage of raw material. It has to be realised that Pakistan Steel Mills Blast Furnace No 1 was relined in 1996 and from then it is being operated continuously. As per the experts opinion, the normal refractory life of the Blast Furnace is 18 to 20 years. So Blast Furnace No 1 is already mature for its complete relining.

COPYRIGHT 2014 Asianet-Pakistan
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2014 Gale, Cengage Learning. All rights reserved.

 
Article Details
Printer friendly Cite/link Email Feedback
Publication:Pakistan & Gulf Economist
Date:Oct 26, 2014
Words:116
Previous Article:LONG-TERM STRATEGY NEEDED TO PROP UP TEXTILE EXPORTS: CE.
Next Article:PKR: STABLE TREND.

Terms of use | Privacy policy | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters