Printer Friendly

Offshore Subsea Structural inspections on Windfarms in the Germany and Denmark.

Contract notice: Offshore Subsea Structural inspections on Windfarms in the Germany and Denmark.

DONG Energy has 3 windfarms consisting of, Borkum and Gode Wind in the German northsea. Anholt Windfarm in the Kattegat sea off the Danish Coast. As part of DONG Energys OMA obligation, a requirement of a specialist 3rd party or parties contractor to undertake sub-sea structural inspections at the locations specified. The work shall be carried out between April -September 2016 The tasks expected to be undertaken are but not limited to.

General Visual Inspection:

Transition Piece (TP)/Jacket steel surface; including welds. All Mono Pile (MP)/Jacket steel surfaces; including welds. Boat landing; including ladder structure, fender structure, stubs and support structures. Grout pipe; including welds, supports and attachments. Anode structures; including supports and attachments. Grout Seal; including supporting bolts. J-Tube and cable exit interface; Including support structure, welds, hinges and J-tube bearings. Cable route to seabed and erosion of seabed around foundation.

Marine Growth Inspection:

Thickness readings; soft and hard marine growth measurements taken from pre-determined cardinal points both vertically and circumferentially.

Inspection of Cathodic Protection System:

Cleaning of selected anodes to determine anode depletion estimate. Potential readings taken externally on the Jacket/TP and MP at pre-determined cardinal points both vertically and circumferentially.

Close Visual Inspection of Grout Seal:

Cleaning of grout seal followed by close visual inspection.

Close Visual Inspection of Cable Protection and Route System.

Performed on each cable route identifying; Cable Positioning in Cable Protection System, Cable exposure, Cable free span. Other windfarms owned or operated by Dong Energy in Denmark for lot 1 and Germany for lot 2 will be able to use the agreements. It is voluntary for the tenderers to provide such rates and they will not be evaluated.

Total quantity or scope: 12 month contract with an option for DONG Energy to extend the term with 2*12 months.

This contract is divided into lots: yes

Deposits and Guarantees required: Conditions relating to the Contract (s) will be stated in the tender documents, however, please note that the Contracting Entity reserves the right to demand a performance security (for proper performance of all obligations under the Contract) comprising

(except for a DPS) Payable documents: yesPrice: 0 EURTerms and method of payment: Not applicable.

Time limit for receipt of tenders or requests to participate: 17.12.2015 - 00:00

Language(s) in which tenders or requests to participate may be drawn up: English.

Major organization : DONG ENERGY WIND POWER A/S

Address : Kraftvaerksvej 53

7000 Fredericia

Contact point(s): Opex Procurement

For the attention of: Justin Graham (Contract Manager)

Country :Denmark

Email : jusgr@dongenergy.co.uk

Tender notice number : 429446-2015

Notice type : Tender Notice

Open date : 2015-12-17

Tender documents : T30872014.html

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Geographic Code:4EUGE
Date:Dec 5, 2015
Words:466
Previous Article:Purchase of the raster scanning magnets.
Next Article:Eu tender on the supply of coffee, tea, machinery and services for komudbud.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters