Printer Friendly

New signs made for the State-owned Historic Sites.

Tenders are invited for state historic sites new sign rfp

The Vermont Division for Historic Preservation is having new signs made for the State-owned Historic Sites. We have designed a new format for exterior signage for these sites, with modifications based on size and location (of sign and property). Please refer to sign specs below and to the attached PDF files (Illustrator or EP files can be provided upon request.) The signs will be done over three years. The first year (FY 2015) signs will be made for the Chimney Point Historic Site, Bennington Battlefield Monument, and the Hubbardton Battlefield Historic Site. In FY 2016, signs will be made for the President Calvin Coolidge Historic Site and Justin Morrill Historic Site. In FY 2017, signs will be made for Old Constitution House Historic Site, President Chester Arthur Historic Site, and the Mount Independence Historic Site. **Electronic response is acceptable; no need to provide a hard copy but identify in the subject line sign proposal.

Tender documents : T23069624.html

2014 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2014 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2014 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jul 18, 2014
Words:180
Previous Article:Passenger Van- Detention.
Next Article:Provision of logistics service provider for arranging PPP Study tour to Turkey.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters