Printer Friendly

Museum Of Contemporary Art - Project Management Mission - Smoke Extraction Study.

Contract notice: museum of contemporary art - project management mission - smoke extraction study

Main features: works of modification of the smoke-extraction installations of the museum of contemporary art. the works will concern all the levels of the building, from the basement to the 3rd level, including the terrace they will concern: - the existing installations of smoke evacuation: sheaths, shutters , extractors- existing air treatment systems: ducts, valves- existing installations of the fire safety system: detectors, remote units, servocontrols, alarm system, general programming of the installation.- existing electrical installations: electrical safety supplies, electrical cabinets for floors, lighting, security lighting - existing false ceilings: false ceilings removable technical cells levels or offices (3rd), false ceilings rooms 1e and 2e stage- on certain levels, the exterior joinery (glazed frames) and interior (emergency exit doors) - the existing inverter room at the s ous-sol- the storage volumes of the basement reserves- the roof terrace of the establishment, punctually, east and west side- the 2 existing extractors

In lyon

Deadline for receipt of tenders: 19/03/2019 at 12:00

Minimum period of bid validity: 5 months

Award criteria: 5 months

Major organization : VILLE DE LYON

Address : Direction De La Construction - Service Marchs, Place De La Comdie 69205 Lyon

Attn : Collomb Grard, Maire

Country :France

Email : dc.marches@mairie-lyon.fr

Tender notice number : 19-24191

Notice type : Tender Notice

Open date : 2019-03-19

Tender documents : T442022896.html

[c] 2019 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2019 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2019 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Feb 16, 2019
Words:239
Previous Article:Project Management Mission For The Partial Renovation Of Jean Mac Elementary School In Maison Des Associations And Creation Of An Elevator.
Next Article:Printing Of The Magazine Of The City Of L~ha-les-roses.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters