LUSIP II Extension Programme (PDA).

Scope of work:

The LUSIP II Extension Project is a continuation of the Lower Usuthu Small Holder Irrigation. Project (LUSIP) goal is to improve the standard of living of the population in the Project Area through an environmentally and culturally sustainable process.

The LUSIP II Extension will command an irrigable area of 11, 500 hectares (ha). Of this area 9, 300 ha is new development. The balance of the area has already been developed but will in the future receive water via the canal system to enable them to cut down on pumping costs as the area is currently being irrigated from the Usuthu River. Once completed, the total area to be irrigated under the whole LUSIP is 17,500.

The LUSIP II Extension Project is composed of the following Project components-

Component 1: is for the development of the main canal conveyance system to deliver the water to the Matata Area. Estimated at E623 Million.

Component 2: is for the construction of the tertiary distribution system which will cost approximately E386 Million.

Component 3: is for the construction of the Nsoko conveyance system and associated irrigation development.

Component 4: is the one all the farmers are looking forward to as it directly impacts on the irrigation.

Component 5, 6 & 7: respectively is for the farmer training, environmental mitigation and project management aspects. This is budgeted at E214 Million.

Baseline Survey Purpose:

The survey is designed to establish initial conditions against which the effects of the LUSIP II Extension Project can be compared. The baseline survey will ensure that the PDA Design document, logical Framework and Baseline Survey Report is populated with appropriate and context specific baseline values on which the implementation of projects will be based on.

Baseline Survey Start and End Date: 4th May 18th August 2015

Anticipated Baseline Survey Report Release Date: Final report 18th August 2015.

Financing Sources:

AfDB, EIB, ICDF, BADEA, Kuwait Fund and the Government of Swaziland)

Project completion date : 2015-12-31 12:00:00


Address : P.O. Box 5836


Cnr. Mdada and Lalufadlwana Str.

Country :Swaziland

Email :

Url :

Financier : African Development Bank (AfDB),Arab Bank for Economic Development in Africa (BADEA),European Investment Bank (EIB),International Cooperation and Development Fund (ICDF),Kuwait Fund for Arab Economic Development (KFAED),

2015 Al Bawaba ( Provided by SyndiGate Media Inc. ( ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:May 8, 2015
Previous Article:Clyde country estates roadway reconstruction and drainage improvements.
Next Article:AU_HYDROGEL: New luminescent hydrogels and chemosensors derived from alkynyl gold(I) complexes.

Terms of use | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters