Printer Friendly

Browse Bridges topic

Investigations subtopic

Articles

1-257 out of 257 article(s)
Title Author Type Date Words
Snapped cables at center of investigation into bridge collapse in Yilan, Taiwan. Oct 1, 2019 537
Investigations And Geotechnical Studies For The Construction Of The Downstream Bridge On The Lguer. Sep 29, 2019 138
Preparation Of A Preliminary Investigation For The Construction Of A Replacement For The Road Bridge Stadtbrcke Schwedt. Sep 13, 2019 189
Consultancy Services For Preparation Of Report On Geo Technical Investigation And Sub Soil Exploration Work For The Construction Of Proposed Bridge Existing Bridges In The State Of Jharkhand. Aug 11, 2019 152
Sub-soil Investigation For The Construction Of Proposed Bridges At Ch.217.40 Of Dy. No. 18 R Of Tsmc(s) , At Ch.578.70, Ch.1452.60 & Ch.1468.90 Of Tsmc(n) And Proposed Bridge Near Tail Regulator Of Rbmc Under Different Subdivision Of Kangsabati Canals Div. Aug 8, 2019 148
A BRIDGE TOO CHAR; Police probe after car wedged on pedestrian crossing...then torched. Aug 5, 2019 310
Investigation Work For Construction Of Thiruvazhiyod Bridge Innemmara Lac Palakkad Dist. Jul 22, 2019 108
Additional Investigation Estimate For Malampuzha Ring Road Bridge Across Mayiladi River At Malampuzha Constituency. Jul 20, 2019 145
Additional Investigation Estimate For Malampuzha Ring Road Bridge Across Mayiladi River At Malampuzha Constituency. Jul 11, 2019 144
Nh 744-investigation Estimate-re Construction Of Koikkal Bridge Near Ch.3/600. Jul 9, 2019 119
Carrying Out Sub Soil Investigation Design And Construction Of 35 Mtr Span Psc Box Girder Permanent Kalapassi Bridge At Km 144.970 Over Kalapassi Nallah On Road Ramban Old Alignment Under 52 Rcc 35 Br. Jul 3, 2019 243
To Carry Out The Soil Investigation For Constructing Bridge Rd 9500 Km Rangoi Diversion. Jun 8, 2019 149
To Carry Out The Soil Investigation For Constructing Bridge On Road From Rattathe To Diwana Dhani Tibba. Jun 8, 2019 151
Bridge Cable Sockets Market Investigation & Development Trends Analyzed till 2028. Apr 23, 2019 698
Bridge Cable Sockets Market Investigation & Development Trends Analyzed till 2028. Apr 23, 2019 800
Bridge Cable Sockets Market Investigation & Development Trends Analyzed till 2028. Apr 23, 2019 785
Soil Investigation For Provn Of Gabion Structure On Hill Feature Near Ajay Bridge At Leimakhong Mil Stn. Jan 20, 2019 160
BRIDGE SAFETY PROBE; Iconic structures under microscope following tragic death of teen crossing aqueduct. Dec 11, 2018 373
Investigation, Design And Construction Of Roads, Bridges, Drains, Water Supply, Sewerage, Ips, Stp, Utility Ducts For Power & Ict, Reuse Waterline & Avenue Plantation, Compatible With Trunk Infrastruc. Nov 29, 2018 279
Investigation, Design And Construction Of Roads, Bridges, Drains, Water Supply, Sewerage, Ips, Utility Ducts For Power & Ict, Reuse Waterline & Avenue Plantation, Compatible With Trunk Infrastructure. Nov 28, 2018 277
Investigation, Design And Construction Of Roads,bridges, Drains, Water Supply, Sewerage,ips, Utility Ducts For Power & Ict, Reuse Waterline & Avenue Plantation, Compatible With Trunk Infrastructure. Nov 25, 2018 288
Construction Of Parayanthodu Bridge And Connecting Road Upto Chalakudy Ksrtc Bus Stand Thottaveethi Standard Furniture Road Plywood Factory Road Independent Road And Muncipality Road Investigation Works. Nov 18, 2018 144
Soil Investigation For Construction Of Additional Foot Bridge. Nov 13, 2018 251
Consultancy Services For Soil Investigation For The Work Of "restoration Of Existing Deck Bridge Nr.lime Kiln Area At Porbandar Port.phase-1 Soil Investigation & Structural Design Etc. Bridge (length 70.71 Meter In Length). Nov 2, 2018 106
Geotechnical Investigation For Construction Of 3 Nosr.c.c. Bridge At In Amrit Beria Over Bhol Sora Khal ,atnatsal(near Geonkhali High School) & Natsal ( Nearbalaramchak) Over Madhya Dunia Khal In Sitalpur (i)section And Geonkhali (i) Section Of Tamluk (i). Nov 1, 2018 115
Investigation, Design Construction Of Roads, Bridges, Storm Water Drains,culverts, Water Supply, Sewerage, Stp, Utility Ducts Of Power & Ict, Reuse Water Line & Avenue Plantation, Compatible With Trun. Oct 29, 2018 286
Investigation, Design Construction Of Roads, Bridges, Storm Water Drains,culverts, Water Supply, Sewerage, Stp, Utility Ducts Of Power & Ict, Reuse Water Line & Avenue Plantation, Compatible With Trun. Oct 29, 2018 281
To Carry Out The Soil Investigation Of Bridge Near Village Talwari And Near Village Nadel Of River Ghaggar. Oct 24, 2018 152
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains, Culverts, Water Supply, Sewerage Network, Utility Ducts For Power & Ict, Reuse Network, Pedestrian Tracks, Cycle Tracks, A. Oct 19, 2018 267
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains, Culvers, Water Supply, Sewerage Network, Utility Ducts For Power & Ict, Reuse Network, Pedestrian Tracks, Cycle Tracts, Av. Oct 17, 2018 256
Investigation, Design Construction Of Roads, Bridges, Storm Water Drains,culverts, Water Supply, Sewerage, Stp, Utility Ducts Of Power & Ict, Reuse Water Line & Avenue Plantation, Compatible With Trun. Oct 10, 2018 277
Investigation, Design Construction Of Roads, Bridges, Storm Water Drains,culverts, Water Supply, Sewerage, Network, Utility Ducts For Power & Ict, Reuse Network, Pedestrian Tracks, Cycle Tracks, Avenue Plantation & Street Furniture Etc......... Oct 9, 2018 105
Construction Of Roads With Utility Infrastructure On Design, Build And Item Rate (lumpsum) Basis In Ap New Capital City, Amaravati For Package Xvii, As Mentioned Below:- investigation, Design And Construction Of Roads, Bridges, Storm Water Drains, Culver. Oct 6, 2018 140
Investigation, Design Construction Of Roads, Bridges, Storm Water Drains,culverts, Water Supply, Sewerage, Stp, Utility Ducts Of Power & Ict, Reuse Water Line & Avenue Plantation, Compatible With Trun. Oct 6, 2018 278
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains, Water Supply, Sewerage, Utility Ducts For Power & Ict, Reuse Waterline, Avenue Plantation & Artificial Water Body, Compati. Oct 3, 2018 267
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains. Culverts, Water Supply, Sewerage, Utility Ducts For Power & Ict. Reuse Waterline & Avenue Plantation & Artificial Water Body Compatible With Trunk & Lps Infrastructure In Amarav. Sep 24, 2018 134
Geotechnical Investigation For Construction Of 2 Nos R.c.c. Bridge At Swarabera Jalpai,thekuachak Over Pratapkhali Khal In Sitalpur(i) Section Of Tamluk (i) Sub - Division Under East Midnapur Division,i & W Dte. Sep 20, 2018 107
Geotechnical Investigation For Construction Of 2 Nos R.c.c. Bridge At Chakkasmali Over Sankarara Khal And Near Ganapatinagar School Over Pratapkhali Khal Under Tamluk(i) Section Of Tamluk (i) Sub - Division Under East Midnapur Division,i & W Dte. Sep 20, 2018 112
Geotechnical Investigation For Construction Of 2 Nos R.c.c. Bridge At Kishorchak Over Murial Khal And Bardabar Over Dehaty Khal Under Panskura (i) Sub - Division No-i Of East Midnapur Division I & W Dte.(2nd Call). Sep 20, 2018 105
Geotechnical Investigation For Construction Of 1 No R.c.c. Bridge At Dakshin Narkelda Over Kamarda Khal In Sitalpur (i) Section Of Tamluk (i) Sub - Division Under East Midnapur Division,i & W Dt. Sep 20, 2018 106
Sub Soil Investigation For Proposed Construction Of A New Single Lane R.c.c. Road Bridge Over Sealdahgong Mam Channel At Kultala, Ch: 10.36 Km Connecting Malatipur On Right Bank And Benki(taki Roasd) On Left Bank G.p. Srinagar-matia, Block-basirhatl .n Th. Sep 20, 2018 114
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains. Culverts. Water Supply, Sewerage, Utility Ducts For Power S Ict, Reuse Water Line&avenue Plantatlon. Sep 18, 2018 101
Geotechnical Investigation Of Bridges/robs From Katghora To Dongargarh Under Jurisdiction Of Chhattisgarh Railway Corporation Limited In The State Of Chhattisgarh. Sep 8, 2018 255
Geotechnical Investigation Of Bridges/robs From Katghora To Dongargarh Under Jurisdiction Of Chhattisgarh Railway Corporation Limited In The State Of Chhattisgarh. Sep 6, 2018 242
Geotechnical Investigation For Construction Of 3 Nos. R.c.c. Bridge Over Benedihi Khal & Deuli River In Block Kharagpur-ii & Sabang, Ps-kharagpur Local & Sabang, Dist.-paschim Medinipur Of K.k.b. Projectsub-division No.-i Under K.k.b. Project Division, I. Aug 29, 2018 123
Death toll hits 39 in Italy bridge collapse; blame begins. Aug 16, 2018 963
Geotechnical Investigation Including Soil Testing For Construction Of (12) Twelve Nos. R.c.c. Bridge Lla. Aug 16, 2018 143
Geotechnical Investigation Including Soil Testing For Construction Of (8) Eight Nos. R.c.c. Bridge. Aug 16, 2018 142
Geotechnical Investigation Including Soil Testing For Construction Of (13) Thirteen Nos. R.c.c. Bridge. Aug 16, 2018 139
Investigation Estimate - Construction Of A Pedestrian Bridge At Pampa Next To The Exsisting Pedestrian Bridge Connecting The Parking Lot To The Trekking Path. Aug 16, 2018 160
Design And Construction Including Subsoil Investigation Of 130 Mtr Long (outer To Outer) Major Pmt Bridge On Open Foundation With Psc Balanced Cantilever Type Superstructure With Abutment Over Lachung. Aug 13, 2018 244
Design/Soil Investigation And Construction Of (200 Mtrs) Span (maximum) Single Lane Steel Motorable Suspension Bridge Over River Chenab At Marsoo (as Per Scope Of Work) Including Construction Of Approach Roads On Left Hand And Right Sides Of Bridge. Aug 12, 2018 110
Investigation Work For Construction Of Moozhikkakadavu Bridge Across Chalakudy River Connecting Meloor And Pariyaram Panchayath In Thrissur District. Aug 5, 2018 124
Investigation Work For The Construction Of Manimakkathodu Bridge In Kodungallur Lac. Aug 5, 2018 117
Investigation Work For Construction Of Puthur Parallel Bridge Across Manali River In Thrissur Mannanmangalam Road In Thrissur District. Aug 5, 2018 124
Kiifb 2017-18 Investigation Work For The Construction Of Bridge At Pulikkal At Km 7/500 Of Padannakkad Overbridge Vellarikundu Road. Aug 5, 2018 167
Soil Investigation Work For The Proposed Construction Of Rcc Bridge Over Dmc At Ch 1050 1316 Lbmc At Ch 1784 2660 2175 2012 1849.50 1352 2480 1964 Dbc At Ch 98.80 477 14bc At Ch 240 And Ketna Over Ban. Jul 31, 2018 179
Inquest opens into death of 81-year-old found in River Dee; Retired milkman John Birch was discovered near Saltney Ferry Bridge. Jul 25, 2018 180
Sub-soil Investigation And Submission Of Report Over Different 13 Thirteen Loction Of Kotulpur Branch Canal In Connection With Construction Of Bridge Conventionl/Pre-febricated At Joypur And Kotulpur. Jul 20, 2018 180
Design And Construction Including Subsoil Investigation Of 130 Mtr Long (outer To Outer) Major Pmt Bridge On Open Foundation With Psc Balanced Cantilever Type Superstructure With Abutment Over Lachung. Jul 4, 2018 236
Mumbai bridge crash: Railway Minister orders probe. Jul 3, 2018 212
Soil Investigation For Construction Of Bridge For Fire Tenders In Connection With Strengthening And Repair Of Podium And Basement Area At Nasc Complex, Pusa, New Delhi. Jun 12, 2018 112
Design And Construction Including Subsoil Investigation Of 130 Mtr Long (outer To Outer) Major Pmt Bridge On Open Foundation With Psc Balanced Cantilever Type Superstructure With Abutment Over Lachung. Jun 10, 2018 233
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains, Water Supply, Sewerage, Utility Ducts For Power & Ict, Reuse Waterline, Avenue Plantation & Artificial Water Body/channel,. May 23, 2018 270
Investigation, Design And Construction Of Roads, Bridges, Storm Water Drains, Water Supply, Sewerage, Utility Ducts For Power. May 18, 2018 133
Investigation launched after rail replacement bus carrying passengers hits Staines bridge; South Western Railway says it takes "the safety of passengers very seriously". May 15, 2018 222
Police probe railway bridge drone footage; MAN FACES PS2,500 FINE. Apr 14, 2018 260
Pedestrian knocked down on Tyne Bridge in early hours fighting for life; The Tyne Bridge was closed southbound for around four hours as police investigated the serious collision involving a pedestrian. Apr 14, 2018 137
Investigation Work For Construction Of Check Dam Cum Bridge And Canal At Chembakakundu Across Kalloorpuzhain Noolpzha Panchayat. Apr 12, 2018 169
Testing Of Soil (soil Investigation) By Hydraulic Feed Diamond Drill Machine For Bridge On Kaushalaya River Approaching Circular Road Of Sector 3,4 And 5 Near Amaravati Enclave In Pinjore Kalka Urban. Apr 11, 2018 181
Testing Of Soil (soil Investigation) By Hydraulic Feed Diamond Drill Machine For Bridge On River Ghaggar Connecting Road 24-26 And 20-21, Panchkula Complete In All Respect. Mar 30, 2018 179
Investigation Work For Construction Of Check Dam Cum Bridge And Canal At Chembakakundu Across Kalloorpuzhain Noolpzha Panchayat. Mar 26, 2018 166
Investigation Work For Construction Of Minor Bridge At Pulimukku In Kumbanadu - Cherukolpuzha Road In Aranmula Constituency. Feb 10, 2018 123
Action Plan Bridges - Investigation Work For Construction Of Minor Bridge At Kareelamukku In Kumbanadu - Arattupuzha Road In Aranmula Constituency. Feb 10, 2018 126
Investigation Estimate For Construction Of Mannanam Bridge Across Pennarthodu At Ch : 0/500 Of Mannanm Kaippuzha Road Connecting Athirampuzha And Neendoor Panchayths. Feb 10, 2018 129
Action Plan -bridges-investigation Work For Preparing Detailed Project Report For Construction Of New Bridge. Feb 4, 2018 147
Investigation Work For Preparing Detailed Project Report For The Construction Of New Bridge Parallell To Existing Angelvally Bridge Under Roads Section Laha In Ranny Constituency. Feb 4, 2018 140
Investigation Work For Preparing Detailed Project Report For Construction Of New Bridge Parallell To Existing Perunadu Bridge Under Roads Section Laha In Ranny Constituency. Feb 4, 2018 166
Investigation Estimate - Kds - Construction Of A Tractor Bridge Across Ayiravely Thodu Between Pullattu Padam And Thekke Vavakad Padam In Ward No.8 Of Kainakary Panchayath. Jan 29, 2018 159
Investigation Estimate -kds - Construction Of A Tractor Bridge Across Society Thodu Between Kizhakkumpuram Padam And Pullad Padam In Ward No.7 Of Kainakary Panchayath. Jan 29, 2018 158
Sub Soil Investigation Design Drawing And Construction Of 160 Mtr Multi Span Psc Box Girder Type Super Structure Alongwith Sub Structure And Load Testing For Major Permanent Gacham Bridge Through Execution Contract At Km 158 38 On Orang Kalktang Sh. Jan 24, 2018 182
Kiifb Investigation Work For The Construction Of Swe Regulator On Upstream Of Old Chithari Swe Regulator Cum Bridge Across Chithari River In Kasaragod District. Jan 11, 2018 137
Construction Of Regulator Cum Bridge Across Shiriya River At Bambrana In Kumbala Panchayat In Kasaragod District- Investigation Work. Jan 10, 2018 137
Nonlinear Analysis Method for Serviceability Investigation of Bridge Deck Ends with a Concrete Slab Track. Sung, Deokyong Jan 1, 2018 5191
Soil Investigation Work For The Proposed Construction Of Single Lane Bridge At Or Near Ch.57.30 Km Over Banka River( Near Bidhanpally Area) With In Burdwan Municipality Area Word No. 08 Under Edilpur(i) Subdivision Of Damodar Canal Division, Court Compoun. Dec 20, 2017 113
Soil Investigation Work For The Proposed Construction Of Single Lane Bridge At Or Near Ch.55.00 Km Over Banka River( Near Bidhyarthi Bhavan Girls High School) With In Burdwan Municipality Area Word No. 35 Under Edilpur(i) Sub-division Of Damodar Canal Div. Dec 20, 2017 116
Investigation Work For Construction Of Bridge Across Pennar Thodu Connecting Mannanam-kaippuzha Road. Dec 17, 2017 119
Kiifb Investigation Work For The Construction Of Swe Regulator On Upstream Of Old Chithari Regulator Cum Bridge Across Chithari River In Kasaragod District. Dec 16, 2017 137
Construction Of Regulator Cum Bridge Across Shiriya River At Bambrana In Kumbala Panchayath In Kasaragod District-investigation Work. Dec 16, 2017 137
Action Plan -bridges-investigation Work For Construction Of A New Bridge At Erathodu In Kadapra-veeyapuram Road In Thiruvalla Constituency (re-tender). Dec 3, 2017 126
Action Plan -bridges-investigation Work For Construction Of A New Bridge Mannamkarachira Bridge) In Kavumbhagom-muthoor Road In Thiruvalla (re-tender). Dec 3, 2017 125
Investigation Work For The Construction Of Uzhinjalpadam Bridge Across Kurumali River In Pudukad Mupliyam Road In Thrissur District. Dec 3, 2017 135
Investigation Work Kifb Construction Of Chotta Bridge Across. Nov 26, 2017 162
Investigation , Sub Soil Expolration And Soil Testing For Construction Of Bridge In Km.9/8-10 Of Kurnool-sunkesula Road In Kurnool District.(2nd Call). Nov 26, 2017 172
Kiifb Investigation Work For The Construction Of Swe Regulator On Upstream Of Old Chithari Regulator Cum Bridge Across Chithari River In Kasaragod District. Nov 24, 2017 137
Construction Of Regulator Cum Bridge Across Shiriya River At Bambrana In Kumbala Pt In Kasaragod District Investigation Work. Nov 24, 2017 139
Action Plan-bridges - Investigation Work For Construction Of A New Bridge (mannamkarachira Bridge) In Kavumbhagom-muthoor Road In Thiruvalla. Nov 15, 2017 124
Action Plan -bridges-investigation Work For Preparing Detailed Project Report For Construction Of New Bridge Parallell To Existing Seethathodu Bridge Under Roads Section Laha In Konni Constituency. Nov 15, 2017 141
Investigation For The Urgent Reconstruction Of Damaged Bridges-construction Of Kurudithodu Bridge In Malappuram Dist. Nov 14, 2017 120
Investigation Work For The Construction Of Uzhinjalpadam Bridge Across Kurumali River In Pudukad Mupliyam Road In Thrissur District. Nov 12, 2017 135
Consultancy Services For Inspection, Investigation ,verification And Safety Measures To Be Taken For The Existing Railway Over Bridge Approaches Including Vehicular Under Pass (vup) At Shigikeri And Preparation Of Estimates And Dtp For The Remedial Measur. Nov 8, 2017 138
Kiifb 2016-17-investigation For The Construction Of Karma Bridge Near Chamravattom Regulator In Malappuram Dist. For Conducting Additional Holes. Nov 7, 2017 124
Survey.geotechnical Investigation,design,approval Of Detailed Engineering Gfc(good For Construction) Drawings And Construction Of Roads(bt&pqc), Bridges,strom Water Drains, Culvers, Water Supply,sewerage&stp, Utility Ducts For Power&ict, Reuse Waterline&a. Nov 5, 2017 338
Rail row; Bridge damage probe as volunteers' work branded 'haphazard'... but they hit out 'health & safety obsessed' Network Rail. Oct 26, 2017 508
Investigation For The Urgent Reconstruction Of Damaged Bridges-construction Of Parallel Kakkathodu Bridge On Pandikkad-wandoor Road In Malappuram Dist. Oct 26, 2017 132
Investigation Estimate For Additional Details - Construction Of Moolekkadavu Bridge In Neerpara- Moolekkadavu Road In Kottayam District. Oct 26, 2017 123
Budget Work 2017-18...investigation For Construction Of Kundayar Bridge Across Kundayar Thodu On Edappal-thavanur Road In Malappuram Dist. Oct 5, 2017 124
Investigation Work For The Construction Of Panampilavu Bridge On Thottumukkom Vettilappara Road Connecting Malappuram And Kozhikode District. Sep 18, 2017 145
Investigation, Design And Construction Of High Level Cable Stayed Bridge Across Manair River At Sadhashivapally Connecting Hyderabad - Karimnagar- Ramagundamroad And Rayapatnam-kodada Road(nh-563)in Karimnagar District. Sep 18, 2017 128
Investigation For Soil Exploration For The Construction Of Retaining Wall And Approach Road For Thekkearayathuruthu Bridge Across T .s Canal At Ch 35.97 Km In Chirayinkeezhu Panchayath. Sep 15, 2017 140
Investigation Design And Construction Rcc Intake Well Cum Pump House Foot Bridge 1.0 Mld Capacity W.t.p. Elevated Service Reservoir Providing Laying And Jointing Of Raw Water Pumping Main And Clear Water Pumping Main Supplying And Installation Of Vertical. Sep 4, 2017 262
Investigation Works For Construction Of A Bridge Across Ashtamudi Lake Connecting Kuthiramunambu Mandrothuruth In Kundara Lac. Aug 31, 2017 152
Investigation For Soil Exploration For The Construction Of Retaining Wall And Approach Road For Kadakom Bridge Across T S Canal At Ch. 35.230 Km In Chirayinkeezhu. Aug 31, 2017 137
Investigation For Soil Exploration For The Construction Of Rataining Wall And Approach Road For Vadakearathuruthu Bridge Across T S Canal At Ch 36.560 Km In Chirayinkeezhu Panchaythu. Aug 30, 2017 134
Investigation For Soil Exploration For The Construction Of Retaining Wall And Approach Road For Thekkearayathuruthu Bridge Across T S Canal At Ch 35.97 Km In Chirayinkeezhu Panchayath. Aug 26, 2017 133
Sub Soil Investigation And Preparation/Submission Of Sub Soil Investigation Report For Construction Of 75 Mtr Long Major Permanent Bridge With Steel Super Structure Over Zeemachu River At Km 4.100 On Road Lachen-kalep Under 86 Rcc. Re-tender. Aug 17, 2017 154
Sub Soil Investigation And Preparation/Submission Of Sub Soil Investigation Report For Construction Of 75 Mtr Long Major Permanent Bridge With Steel Super Structure (through Type) Over Zeemachu River At Km 4.100 On Road Lachen-kalep Under 86 Rcc. Aug 16, 2017 171
Construction Of Panamootil Kadavu Bridge At Thalavady Panchayath In Alappuzha District_soil Investigation Estimate. Aug 9, 2017 158
Soil Investigation Work For The Construction Of Madura Company- Kannengattu Bridge Across Pazhnithodu In Ernakulam District. Jul 30, 2017 134
Preliminary Investigation Report-conducting Core Boring For Construction Of Regulater Cum Bridge With Lock Across Meenachil River At Thazhathangadi Bhagam In Arpookara Gp And Kottayam Muncipality. Jul 28, 2017 161
Investigation Work For The Construction Of Panampilavu Bridge On Thottumukkom Vettilappara Road Connecting Malappuram And Kozhikode District. Jul 24, 2017 139
Kiifb_construction Of Punnamada_nehru Trophy Bridge In Alappuzha District And Additional Investigation And Approach Road Design. Jul 3, 2017 149
Kiifb_construction Of Kavalam Thattassery Bridge In Alappuzha District _investigation And Approach Design. Jul 3, 2017 145
Kiifb - Investigation Estimate For The Construction Of Moolakkeelkadavu Bridge In Kannur District. Jul 3, 2017 141
Kiifb_construction Of Padaharam Bridge Across Pamba River In Alappuzha District_additional Investigation And Approach Design. Jul 3, 2017 148
Kiifb_construction Of Tottappally-naluchira Bridge In Alappuzha District_investigation And Approach Design. Jul 3, 2017 144
Geotechnical Investigation At Proposed Site For Design Of A New Rcc Bridge Over River Dwarakeshwar At Sutaboi Ps And Block_kashipur In Purulia District. May 19, 2017 151
Geotechnical Investigation At Proposed Site For Design Of A New R.c.c. Bridge Over River Dwarakeshwar At Sutaboi, P.s & Block- Kashipur In Purulia District. May 16, 2017 102
Investigation For The Construction Of Regulator Cum Bridge Across Cherupuzha In Mannilidamkadavu In Chathamangalam Panchayath. Apr 23, 2017 141
Investigation Work For The Construction Of Eravipuram Bridge Across Ts Canal In Kollam. Apr 19, 2017 142
Investigation Work Of Re-construction Of Mundakkal Bridge Across Ts Canal In Kollam. Apr 19, 2017 137
Kiifb - Investigation Work For The Construction Of Kavinmunambu Bridge At Km 7/900 Taliparamba - Pattuvam - Cherukunnu Road In Kannur District. Apr 19, 2017 144
Carrying Out Feasibility Study, Soil Investigation, Preparation Of Gad And Dpr For Construction Of Bridge Over Ghaggar River From Kariwala To Elleanbad Link Road I C Constn. Of Approaches In Sirsa Distt. Apr 16, 2017 121
Geotechnical Investigation At Proposed Site For Design Of A New Rcc Bridge Over River Dwarakeshwar At Sutaboi Ps And Block_ Kashipur In Purulia District. Apr 16, 2017 152
Geotechnical Investigation At Proposed Site For design Of A New R.c.c. Bridge Over River dwarakeshwar At Sutaboi, P.s & Block- Kashipur in Purulia District. Apr 14, 2017 104
Carrying Out Feasibility Study, Soil Investigation, Preparation Of Gad & Dpr For Construction Of Bridge Over Ghaggar River From Kariwala To Elleanbad Link Road I/c Constn. Of Approaches In Sirsa Distt. Apr 14, 2017 110
Carrying Out Feasibility Study, Soil Investigation, Preparation Of Gad & Dpr For Construction Of Bridge Over Ghaggar River From Kariwala To Ellenabad Link Road I/c constn. Of Approaches In Sirsa Distt. Apr 11, 2017 101
Geotechnical Investigation In Connection With The Construction Of A New Bridge At Boropole (26.125 Kmp Of Kholapota-baduria-maslandapur-habra Road) During The Year 2017-18. Apr 3, 2017 153
Damage Detection in Railway Truss Bridges Employing Data Sensitivity under Bayesian Framework: A Numerical Investigation. Prajapat, Kanta; Ray-Chaudhuri, Samit Report Jan 1, 2017 5092
An Investigation on the Dynamic Response of Cable Stayed Bridge with Consideration of Three-Axle Vehicle Braking Effects. Nguyen, Xuan-Toan; Tran, Van-Duc; Hoang, Nhat-Duc Report Jan 1, 2017 5028
Investigation Work For The Construction Of New Bridge At Kalady Bridge Across Periyar River. Nov 16, 2016 131
Investigation For Improvements To Palappuram - Kuthiravazhi Road And Construction Of Bridge Across Mulanjurthode In Palakkad District. Nov 15, 2016 131
Consultancy Service For Sub Soil Investigation And Collection Of Other Relevant Data For Construction Of 70.00 Mtr Single Span Major Pmt Bridge With Steel Truss Type Super Structure. Nov 12, 2016 102
Preparation Of Documents And Procurement Of Hydrological Data For Conducting Investigation On Damaged Bridge Across Koel River On Untari Majhiaon Road Under Untari Road Block, Palamanu District. Nov 10, 2016 143
Investigation For Construction Of Bridge Across Pottithode At Karimbankunnu - Thanikkalatty In Mannarkkad - Thathengalam Road In Palakkad District. Nov 3, 2016 135
Design And Construction Including Sub Soil Investigation (ssi Of 80 Mtr Span Major Permanent Bridge With Steel Superstructure Deck Type. Oct 6, 2016 136
Providing Geo Technical Investigation For Major Bridge On Telhara Wadi, Adampur Babhulgaon, Adsul Road Odr 64 On Vidruupa River (geotechnical Investigrtion Of Rob Proper). Oct 5, 2016 155
Procurement Of Hydrological Data For Conducting Investigation On Damaged Bridge Across Koel River. Oct 4, 2016 136
Procurement Of Hydro-logical Data For Conducting Investigation On Damaged Bridge Across Koel River. Sep 26, 2016 196
Emergent Repair Of Slip At Haridaspur Over River Chandia L/b Near Wooden Bridge Paramanandapur G.p In P.s. Moyna Of Dist-purba Medinipur Under Paramanandapur (i) Section Of Investigation Sub-division, East Midnapur Division. Sep 24, 2016 118
Carrying Out Feasibility Study, Soil Investigation, Preparation Of Gad And Dpr For Construction Of Railway Under Bridge At Railway Crossing (c-32) At Nohar Road, Ellenabad Distt. Sirsa. Sep 13, 2016 129
1. Investigation In Connection With Design Of Retaining Wall And Soil Stabilization Techniques For Approaches To Construction Of Bridge And Vaisyambhagam Across Pookaitha River In Alappuzha District. Sep 12, 2016 145
Geotechnical Investigation For The Different Borehole Location In Connection With The Construction Of Proposed Rcc Bridge Over River Chaltadunia At Kalibangler Kheya In The District Of South 24 Parganas. Sep 11, 2016 161
Geotechnical Investigation For The Different Borehole Location In Connection With The Construction Of Proposed Rcc Bridge Over River Gobadia At Mandirghat In The District Of South 24 Parganas. Sep 10, 2016 160
Geotechnical Investigation For The Different Borehole Location In Connection With The Construction Of Proposed Rcc Bridge Over River Hana At Pathankhali In The District Of South 24 Parganas. Sep 10, 2016 160
Geotechnical Investigation At Construction Site Of Major Bridge Over Shakkar River At Ch.6/544, Psc Girder. Sep 2, 2016 106
Investigation Work In Connection With The Construction Of Kumbichalkadavu Bridge Across Karippayar River In Amboori Panchayat In Parassala Constituency. Aug 24, 2016 119
Investigations Upstream And External Controls For The Construction And Rehabilitation Of Bridges. Reference Number: 16soa08. Aug 23, 2016 118
Upstream Investigations And External Controls For The Construction And Rehabilitation Of Bridges. Aug 23, 2016 237
To Carry Out Preliminary Activities Between Ballia-gazipur City Station At Site Including Fixing Of Centre Pegs Pillars, Post Etc. And Soil Investigation For Design Of Foundation Etc. For Existing Minor/major Bridges To Be Rebuild By Psc/composite Girder. Aug 23, 2016 152
Geotechnical Investigation For The Different Borehole Location In Connection With The Construction Of Proposed Rcc Bridge Over River Hana At Pathankhali In The District Of South 24 Parganas. Aug 23, 2016 158
Geotechnical Investigation For The Different Borehole Location In Connection With The Construction Of Proposed Rcc Bridge Over River Gobadia At Mandirghat In The District Of South 24 Parganas. Aug 23, 2016 158
Geo - Technical Investigation In Connection With Construction Of Proposed Bridge Over River Jalangi At Maheshganj- Mayapur, Connecting Maheshpur - Ferryghat And Taranipur Ghat Under Under Nadia Hwy. Divn-i In The District Of Nadia (2nd Call). Aug 6, 2016 163
Consultancy Work Of Geotechnical Investigations At Bridges, Tunnels And Other Specified Locations On The Railway Alignment In Srinagar-karanprayag (sivai) Section (73.235-125.200 Km) Of 125 Km New Broad Gauge Rail Link Between Rishikesh And Karanprayag. Aug 3, 2016 102
Consultancy Work Of Geotechnical Investigations At Bridges, Tunnels And Other Specified Locations On The Railway Alignment. Aug 2, 2016 108
'We are convinced that John was the victim of carefully executed murder' Nearly four years ago, businessman John Merrick was found dead at the foot of a railway bridge. Police say it was an accident, but his parents refuse to accept that conclusion and have issued a PS100,000 reward in a bid to catch his killers. NICK MCCARTHY reports. Jul 31, 2016 1262
Construction Of Bridge On Saiwan Ambode Road Tansa River V.r.26 Taluka Vasai, District Palghar. Carried Geo-technical Investigation Taking Trial Bores. Jul 25, 2016 151
Geo - Technical Investigation In Connection With Construction Of Proposed Bridge Over River Jalangi At Maheshganj- Mayapur, Connecting Maheshpur - Ferryghat And Taranipur Ghat Under Under Nadia Hwy. Divn-i In The District Of Nadia. Jul 20, 2016 161
Investigation works for the construction of chembeythodu bridge in kadalundy grama panchayath of kozhikode district. Jul 17, 2016 134
Cigarette the likely cause of bridge blaze; PROBE AFTER HISTORIC STRUCTURE ON TYNE SET ON FIRE. Jun 4, 2016 285
Design, fabrication, launching, painting, soil, investigation of 15.00mtr span steel Motorable bridge at Chinar Mohalla including. May 29, 2016 156
prelimanary soil investigation work for the construction of bridge. May 12, 2016 184
India : Police probed contractors win Rs. 200 crore bridge construction contracts. May 5, 2016 159
Geotechnical investigation in connection with the proposed construction of bridge. Apr 29, 2016 160
Gov.Technical investigation for construction of major Bridge in km 47/0. Apr 20, 2016 173
Consultancy Services for Structural Design of Bridge on stilt (1700M Long x 17M wide) in Mangroves portion along with carrying out Geotechnical Investigation. Apr 12, 2016 140
Consultancy Services for Structural Design of Bridge on stilt (1700M Long x 17M wide) in Mangroves portion along with carrying out Geotechnical Investigation, preparation of estimate, bid document & o. Mar 14, 2016 201
Specialised Consultancy Services for design based on detailed investigations, costing and preparation of Technical Schedules of EPC documents of (i) Construction of Additional Bridge adjacent to the e. Mar 11, 2016 121
Consultancy Services for Structural Design of Bridge on stilt (1700M Long x 17M wide) in Mangroves portion along with carrying out Geotechnical Investigation, preparation of estimate, bid document & o. Mar 10, 2016 111
Preliminary soil investigation work for the construction of bridges. Mar 8, 2016 130
Sub Soil Investigation And Preparation Submission Of Ssi Report For Constr Of 50 Mtr Long Major Pmt Bridge With Steel Super Structure On Pile Foundation Over Ignp Canal At Km 5.030 On Road Ramgarh Lon. Mar 7, 2016 165
Investigation work for the construction of varambinathu malikadavu bridge across manimala river in alappuzha district. Mar 5, 2016 136
Investigation work for the construction of bridge across neduvot river connecting kuttaparamb and neduvot in alakkode panchayath in kannur district. Feb 19, 2016 136
Preliminary soil investigation work for the construction of bridges (proposed for 3v of 9m). Feb 13, 2016 136
Underwater diving inspection services are required for investigating bridge substructure unitsand other structures in the water. work orders under the blanket agreement will be negotiatedand authorize. Feb 7, 2016 147
Investigation works for the construction of railway over bridge at purayar in kalady-aluva road. Feb 6, 2016 135
Consultancy work of Geotechnical investigations at bridges, tunnels and other specified locations on the Railway alignment in Shivpuri-Srinagar section (20.000-73.235 km) of 125 km new Broad Gauge R. Feb 1, 2016 106
Soil Investigation for the work Re-Construction of Skew Culvert/ R.C.C. Bridge At 1700.00m of Churial Extension Khal (i.e., at Prasanta Roy Road Crossing) In P.S. Behala, Dist. South 24 Parganas under. Jan 30, 2016 103
Kabani river basin - investigation works for the construction of regulator cum bridge across venniyode river at malankara-parakadavu in panamaram panchayath. Jan 13, 2016 137
Nabard - ridf-xx- investigation work for the construction of regulator cum bridge across mananthavady river at puthiyedam payyampally in mananthavady pt. Jan 13, 2016 137
Investigation works for contruction of single lane bridge at varambinakath malikadavu across pamba river. Jan 5, 2016 142
Investigation works to the construction of a bridge at upadesikadavu across pamba river. Jan 5, 2016 140
Professional civil engineering design services for bridge replacement. includes provide geotechnical investigation reports and any additional geotechnical documentation; provide preliminary engineerin. Jan 4, 2016 121
Investigation of bridge work 2015-16 - investigation works for the construction of bridge at ponmana across ts canal near kattilmekkathil temple in chavara constituency. Dec 28, 2015 138
Investigation work for the construction of manjerikkuzhi bridge across kadamprayar connecting aluva - edachira in ernakulam district. Dec 23, 2015 122
Investigation work for the construction of manjerikkuzhi bridge across kadamprayar connecting aluva - edachira in ernakulam district. Dec 23, 2015 118
Investigation work for the construction of manjerikkuzhi bridge across kadamprayar connecting aluva - edachira in ernakulam district. Dec 23, 2015 122
Investigation work for the construction of bridge at chenayikadavu across kuttiadi river in kozhikode district. Dec 5, 2015 134
Soil investigation on approach road alignment -construction of convent beach bridge connecting convent junction and beach road at pallippuram in ernakulam district. Nov 30, 2015 150
Investigation works for contruction of single lane bridge at varambinakath malikadavu across pamba river. Nov 28, 2015 141
Construction of Convent beach bridge connecting Convent Junction and Beach road at Pallippuram in Ernakulam District-Soil Investigation on approach road Alignment. Nov 28, 2015 150
Nai - infrastructure facilities to ezhimala naval academy - improvements to madai - tb muttam - palacode road km 0/000 to 3/525 - investigation work for the construction of railway over bridge at km 2. Nov 21, 2015 153
Investigation works for construction of anjuruly bridge. Nov 14, 2015 108
Investigation work for the construction of bridge parellel to chovva bridge. Nov 14, 2015 125
Construction of bridges on dindi - devarkonda road to kambalapally from km.13/0 to 20/0 (6 nos) in nalgonda district sub work:- conducting sub-soil investigation works for bridges at km.12/8-10 (4v 8. Oct 29, 2015 184
Investigation of a regulator cum bridge across chaliyar river at boothanam in pothukallu panchayath. Sep 24, 2015 126
Investigation of a regulator cum bridge across chaliyar river at munderi in pothukallu panchayath. Sep 24, 2015 126
Peravoor block panchayath construction investigation and designing of bridge at nidupoil kadu in kolayad gp proj no 4316. Sep 21, 2015 143
Conducting preminiary sub soil investigation in connectiion with Construction of 2v of 10.37 m high level bridge at km 156/0-2 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 146
Conducting preminiary sub soil investigation in connection with Construction of 2v of 10.37 m high level bridge at km 141/2-4 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 146
conducting preminiary sub soil investigation in connection with Construction of 2v of 18.00 m high level bridge at km 146/2-4 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 146
Conducting preminiary sub soil investigation in connection with Construction of 3v of 16.75 m high level bridge at km 151/4-6 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 147
Conducting preminiary sub soil investigation in connection with construction of 2v of 8.00 m high level bridge at km 157/8-10 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 146
conducting preminiary sub soil investigation in connection with Construction of 2v of 8.00 m high level bridge at km 158/0-2 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 147
conducting preminiary sub soil investigation in connection with Construction of 2v of 10.37 m high level bridge at km 174/2-4 on hyderabad - medak - bodhan road in nizamabad district. Sep 19, 2015 146
Conducting preminiary sub soil investigation in connection with Construction of 2v of 12.50 m high level bridge at km 11/0 on chandur - jalalpur road in nizamabad district. Sep 19, 2015 145
Conducting preminiary sub soil investigation in connection with Construction of 3v of 14.50 m high level bridge at km 4/4-6 on ghanpur pwd road to old varni (via) humnapur in nizamabad district. Sep 19, 2015 151
Conducting preminiary sub soil investigation in connection with Construction of 4v of 10.37 m high level bridge at km 4/0-2 on jukkal - madnoor road in nizamabad district. Sep 19, 2015 144
Conducting preminiary sub soil investigation in connection with Construction of 2v of 12.50 m high level bridge at km 21/4-6 on jakora - mondisadak road in nizamabad district. Sep 19, 2015 145
Cops investigate bridge fall death at rail station. Sep 12, 2015 167
Construction of bridge (proposed for 7 vents of 10m) at km 1/4-6 on dharoor - macharla road in mahabubnagar district sub work: preliminary soil investigation work for construction of bridge. Aug 17, 2015 149
Construction of bridge (proposed for 7 vents of 10m) at km 2/4-6 on dharoor-macharla road in mahabubnagar district sub work: preliminary soil investigation work for construction of bridge. Aug 17, 2015 148
Construction of high level bridge on pwd road to kotilingala road at km 1/4-6 in karimnagar district. sub-work: preliminary sub-soil investigation work for the proposed hlb (prop. for 3 vents of 8 m). Jul 8, 2015 151
Construction of high level bridge at km. 25/4-6 across pankena vagu on mahadevpur - muknoor - kanakanoor - kataram road in karimnagar district. sub-work: preliminary sub-soil investigation work for th. Jul 8, 2015 156
Construction of high level bridge at km 20/6-8 (near lenkalagadda) on mahadevpur- muknoor-kankanoor-kataram road in karimnagar district. sub-work: preliminary sub-soil investigation work for the propo. Jul 8, 2015 152
Construction of high level bridge on pwd road to prathapagiri via bopparam road (douthupalli) at km. 2/6-8 in karimnagar district. sub-work: preliminary sub-soil investigation work for the proposed hi. Jul 8, 2015 157
Construction of high level bridge in place of causeway at km 23/2-4 on bellampally-venkatapur road in adilabad district. (sub-work: sub-soil investigation work)(part-a). May 15, 2015 142
Construction of high level bridge in place of causeway at km. 23/8-10 ontandur-bheemini road in adilabad district.(sub-work: sub-soil investigation work)(part-a). May 15, 2015 141
Construction of high level bridge in place of causeway at km.17/8-10 ontandur-bheemini road in adilabad district.(sub-work: sub-soil investigation work)(part-a). May 15, 2015 148
Consultancy Services of Geotechnical investigations at bridges, tunnels and other specified locations on the railway alignment in New Rishikesh-Shivpuri section (6.0-20.0km) of 125 km new Broad Gauge. Apr 29, 2015 102
Geo technical investigation and submission of report for proposed construction of r.C.C. bridge over river balason at dudhia dist. darjeeling. 3rd call. Mar 31, 2015 137
Investigation work for the construction of alex nagar kanhileri bridge. Mar 21, 2015 127
Geo technical investigation and submission of report for proposed construction of r.C.C. bridge over river balason at dudhia, dist. darjeeling. 2nd call. Mar 19, 2015 137
Conducting sub-soil investigation work for the proposed construction of high level bridges. Mar 9, 2015 138
Watch: 'Extremely dangerous' gorilla stunt on Wylam Bridge is investigated by police; Andrew and Stephen McElvogue are being investigated by police after filming on top of Wylam Railway Bridge using a drone camera. Feb 23, 2015 363
Investigation for the construction of kallikkandy bridge. Feb 7, 2015 102
Construction of bridge in km.2/2 on tadihatnoor-gudimamda road in adilabad district. sub-work:- presurvey and preliminary sub soil investigation work. Jan 27, 2015 104
Design And Construction Including Sub Soil Investigation Of 180 Mtr Long Major Permanent Bridge With Psc Continuous Cantilever. Dec 12, 2014 122
Investigation into ubc238 clodiagh river bridge near clonulty, co tipperary. Nov 13, 2014 158
Design soil investigation and construction of 88mtr Span Foot Suspension Bridge. Oct 28, 2014 105
Providing consultancy services for geotechnical investigation detailed designing preparing gads and structural drawings for bridges buildings etc. Sep 25, 2014 121
Design,soil investigation and construction of TWO no abutments,ONE no pier and superstructure(Steel Decking) to 2 x 45 feet foot bridge. Aug 27, 2014 122
Design And Construction Including Sub Soil Investigation Of 180 Mtr Span Major Permanent Bridge. Aug 23, 2014 125
Geo technical investigation in connection with construction of proposed bridge. Aug 8, 2014 129
Design, soil investigation and construction of 88mtr Span Foot Suspension Bridge o. Jun 30, 2014 119
Sub soil investigation and recommendations for construction of minor bridge. Mar 6, 2014 112
Investigation for the construction of a bridge. Jan 15, 2014 105
Investigation for the construction of a railway over bridge. Jan 15, 2014 104
Investigation for the construction for the parappanangadi-new cut bridge. Jan 15, 2014 101
Investigation design and construction of 178 m long steel bridge. Dec 27, 2013 111
Structural investigation of masonry arch bridges. Jul 18, 2013 147
Design, Soil Investigation and Construction of 34 M Span Bridge in Km 2nd RD 800-825 Khawas to Gunda road, Package No. JK12-107, Phase VIII, Block Budhal, District Rajouri. Jun 17, 2013 184
Design, Soil Investigation and Construction of 34 M Span Bridge in Km 2nd RD 800-825 Khawas to Gunda road, Package No. JK12-107, Phase VIII, Block Budhal, District Rajouri. Jun 17, 2013 107
Geotech Investigation for major bridges, minor bridges, high bank, deep cutting/other structures like wild life under passes/over passes/ ROB s/RUB s. Feb 12, 2013 125
Honley bridge tests; Council safety scrutiny as lorry load increases. Jan 2, 2013 340
Police divers probe River Tyne mystery; Search after pile of clothes found near Swing Bridge. Dec 18, 2012 218
Investigation of steel fibre pullout and modeling of bridging behaviour in SFRC. Skadins, Ulvis; Brauns, Janis Report Sep 1, 2012 5704

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters