Printer Friendly

Browse Drilling topic

Investigations subtopic

Articles

1-137 out of 137 article(s)
Title Author Type Date Words
Ariana probes deeper at Kiziltepe, returning attractive gold grades in latest round of resource definition drilling. Dec 18, 2019 259
Going for gold; FIRM STEPPING UP SEARCH WITH FIRST DIAMOND DRILLING PROBES IN CLOGAU MINE / Alba is about to commence what's thought to be the first-ever exploration diamond drilling campaign at the Clogau-St David's Mine in search of Welsh gold (inset)PICS: ALBA/GOLD MINES OF WALES. OWEN HUGHES Business Correspondent owen.hughes@dailypost.co.uk Nov 15, 2019 386
Going for gold; FIRM STEPPING UP SEARCH WITH FIRST DIAMOND DRILLING PROBES IN CLOGAU MINE. OWEN HUGHES Business Correspondent owen.hughes@dailypost.co.uk Nov 15, 2019 160
Implementation Of A Measurement Probe Device For Drilling To Better Understand The Vertical And Lateral Flow Processes In The Framework Of The Demeaux-thau Project. Oct 26, 2019 140
Drilling Of 2 Nos Vertical Boreholes At 26 Dip District In Cl Jambad Colliery On Dip Side Of R Viii Jambad Seam Workings To Probe Water Presence With Head To Provide Water For Stowing As Well As Domestic Use Kenda Area C L Jambab Colliery Under Kend. Oct 10, 2019 178
Investigation on the Influence of Water-Shale Interaction on Stress Sensitivity of Organic-Rich Shale. Liu, Xiangjun; Zhuang, Yan; Liang, Lixi; Xiong, Jian Oct 1, 2019 7547
Test Drilling And Boring Work - Drv Wahrenberg 1st Ba - Subsoil Investigations. Sep 20, 2019 190
Diamond Core Drilling For Geo-technical Investigation At Dam Axis Of Chaura Reservoir Scheme In Bokaro District Of Jharkhand Under Neid-i, Cwc, Silchar. Sep 10, 2019 226
Creation Of A Vertical Test Probe, Implementation Of A Trt And Geomodelling (france-wambrechies: Test Drilling And Boring Work). Aug 29, 2019 111
Diamond Core Drilling For Geo-technical Investigation At Dam Axis Of Bhuswa Reservoir Scheme In Hazaribag District Of Jharkhand Under Neid-i, Cwc, Silchar. Aug 29, 2019 217
Diamond Core Drilling For Geo-technical Investigation At Dam Axis Of Barkattha Reservoir Scheme In Hazaribag District Of Jharkhand Under Neid-i, Cwc, Silchar. Aug 29, 2019 217
Diamond Core Drilling For Geo-technical Investigation At Dam Axis Of Chaura Reservoir Scheme In Bokaro District Of Jharkhand Under Neid-i, Cwc, Silchar. Aug 28, 2019 222
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Kovilambakkam To Sholinganallur Of Corridor-5. Jul 28, 2019 195
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Ramchandra Hospital To Poonamallee Of Corridor-4. Jul 28, 2019 196
Engagement Of Geotechnical Contractors For detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Ramachandra Hospital To Poonamallee Of Corridor-4 (total Length = 7. Jul 25, 2019 142
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Kovilambakkam To Sholinganallur Of Corridor-s (total Length = 8.41 Km (ch:37861.000 M To Ch:46272.000 M) For Elev. Jul 25, 2019 139
Geo Technical Investigation Including Laboratory Investigations In The German Eez In The North Sea And Baltic Sea For The Years 2019 To 2022. Jun 20, 2019 518
Abs 38 Tling Freilassing Pa03: Subsoil Investigations (exploration Fine Concept, Awarding Of Drilling And Exploration Services, Drilling Support, Geotechnical Reports). May 30, 2019 123
2019 Groundwater Resource Management Observer Drilling Investigation And Protection Facility Installation Service. May 20, 2019 130
Nit For Diamond Core Drilling For Geo Technical Investigation At Dam Axis Of Sonadubi Reservoir Scheme In Ranchi District Of Jharkhand Under Neid-i, Cwc, Silchar. Apr 12, 2019 191
Nit For Diamond Core Drilling For Geo Technical Investigation At Dam Axis Of Bhur Reservoir Scheme In Ranchi District Of Jharkhand Under Neid-i, Cwc, Silchar. Apr 12, 2019 191
United States : Frost & Sullivans Webinar Investigates Technology Development Trends in Measurement While Drilling. Mar 4, 2019 309
Providing Of Site Investigations. Feb 28, 2019 131
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Sholinganallur To Sipcot Of Corridor-3 Incl. Feb 17, 2019 142
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Ramchandra Hospital To Poonamallee Of Corridor-4 Including. Feb 17, 2019 144
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Cmbt To Butt Road Of Corridor-5. Feb 17, 2019 136
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Power House Ramp To Ramachandra Hospital Of. Feb 17, 2019 139
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Power House Ramp To Ramachandra Hospital Of Corridor-4. Feb 15, 2019 200
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Butt Road To Kovilambakkam Of Corridor-5. Feb 15, 2019 198
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Cmbt To Butt Road Of Corridor-5. Feb 15, 2019 198
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Sholinganallur To Sipcot Of Corridor-3 Including Depot At. Feb 15, 2019 203
Detailed Geotechnical Investigations By Drilling Boreholes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Kovilambakkam To Sholinganallur Of Corridor-5. Feb 15, 2019 197
Metal Detector Delivery, Drilling Probe, Internal Combustion Engine, Hydraulic Hammer, 5-stroke Heavy Duty Vehicle. Positions. Feb 13, 2019 106
Phase-ii-corridor-5-package No-p2c5/geo-5 - "engagement Of Geotechnical Contractors For "detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Kovilambakkam To Sholing. Feb 2, 2019 144
Phase-ii-corridor-3-package No-p2c3/geo-5 - "engagement Of Geotechnical Contractors For "detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Shounganallur To Sipcot. Feb 2, 2019 149
Geotechnical Contractors For "detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Sholinganallur To Sipcot Of Corridor - 3 Including Depot At Sipot. (total Length =. Feb 2, 2019 125
Investigation Drilling In The Exploration Field. Dec 8, 2018 103
Outsourcing Of Drilling 2400mrts For Investigation Of Coal In Sambayagudem Block Kothagudem District Telangana. Nov 12, 2018 206
Geotechnical Investigation Of Bridges/robs From Katghora To Dongargarh Under Jurisdiction Of Chhattisgarh Railway Corporation Limited In The State Of Chhattisgarh. Sep 8, 2018 255
Geotechnical Investigation Of Bridges/robs From Katghora To Dongargarh Under Jurisdiction Of Chhattisgarh Railway Corporation Limited In The State Of Chhattisgarh. Sep 6, 2018 242
Core Drilling Works In Nx Size For Additional Geotechnical Investigation At Various Locations Of The Proposed Lower Kopili Hydro Electric Project At Dima Hasao District And Karbi Anglong District Of Assam. Aug 31, 2018 107
Core Drilling Works In Nx Size For Additional Geotechnical Investigation For Lkhep. Aug 30, 2018 142
Geo-technical Investigation (diamond Core Drilling Works) Of Bh-15 To Bh-21 At Dam Area And Spillway Location Of Tlawng Hydro-electric Project Near Lungleng Village Distt. Aizawl Under North Eastern Investigation Division-ii, Cwc, Aizawl(mizoram). Aug 23, 2018 101
Investigation Drilling In The Area Of Slano. Jul 21, 2018 107
Outsourcing Of Drilling For Investigation Of Ni-pge And Gold In Holakere Doddaghata And Rampura Gollarahati Areas Of Tumkur District Karnataka. Jul 21, 2018 215
Outsourcing Of Drilling For Investigation Of Ni-pge And Gold In Holakere Doddaghata And Rampura Gollarahati Areas Of Tumkur District Karnataka. Jul 13, 2018 212
Investigations On 6 Drilling Mud Pits In The District Of Nienburg/Weser, Phase I And Ii, Lot 1 - Lot 6; Delivery Of Reports For Phase 1 And Phase 2 (per Lot: In Duplicate And Once On Data Carrier). Jul 13, 2018 108
Work To Carry Out A Reconnaissance Drilling At A Depth Of 152 M With The Implementation Of A Vertical Geothermal Probe Test Of 150m Depth For The Operation Of Construction Of A Gendarmerie In Saint-pierre D~oleron. Jun 29, 2018 126
Earth Probe Field: Deep - Hole Drilling And Sanitary Works. Jun 15, 2018 266
Outsourcing Of Drilling For 500mtrs Depth Range 50m To 200m For Investigation Of Iron Ore In Dumalkunta And Ragumpet Block Of Karim Nagar District Telangana State. Jun 1, 2018 219
Outsourcing Of Drilling For 1000mtrs Depth Range 100m To 250m For Investigation Of Copper And Associated Mineralization Around Garimanipenta Vinjamuru Udayagiri And Duttaluru Areas Of Nellore District. May 4, 2018 235
Proposed Solar Agriculture Feeder Projects At Various Location In Marathwada Region. - Work Of Drilling Bore Well & Soil Investigation/exploration For 12 Nos.laocations Of Proposed Solar Project In Ma. Apr 23, 2018 138
As-needed Domestic Well Investigation, Mitigation And Drilling. Apr 1, 2018 129
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting. Feb 27, 2018 137
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports For Elevated Section From Tharamaniroad Junction To Shollingana. Feb 27, 2018 126
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Madhavaram Milk Colony To Shastri Nagar Including Madhavar. Feb 27, 2018 137
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports For Under Ground Section From Shastri Nagar To Cmbt(total Lengt. Feb 27, 2018 116
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting Andtesting The Samples And Submission Of Geotechnical Reports. Feb 10, 2018 128
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting Andtesting The Samples And Submission Of Geotechnical Reports. Feb 10, 2018 133
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Madhavaram Milk Colony To Pattalam Of Corridor-3 (total Length = 8.04 Km (ch: (-95.00) To Ch:7947.00) ) For Under. Feb 7, 2018 122
%detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Tharamani Road Junction To Shollinganallur Of Corridor-3 (total Length= 9.601 Km (chainage 25813.00 - 35414.00)). Jan 27, 2018 141
Detailed Geotechnical Investigation By Drilling Bore Holes And Collecting And Testing The Samples And Submission Of Geotechnical Reports From Thousand Lights To Tharamani Road Junction Of Corridor-3 (total Length= 10.07 Km (chainage 15742.00 25813.00)). Jan 27, 2018 143
Investigation on the Wear Rate of Sintering Diamond Core Bit during the Hole Drilling Process of [Al.sub.2][O.sub.3] Bulletproof Ceramics. Zheng, Lei; Zhang, Chen; Dong, Xianglong; Zhao, Shitian; Wu, Weidong; Cui, Zhi; Ren, Yaoqing Jan 1, 2018 6326
An Investigation of the Effect of Parameters and Chip Slenderness Ratio on Drilling Process Quality of AISI 1050 Steel. Demir, Zulkuf; Yakut, Rifat Jan 1, 2018 5007
Numerical Investigation of Influences of Drilling Arrangements on the Mechanical Behavior and Energy Evolution of Coal Models. Zhao, Tong-bin; Guo, Wei-yao; Yu, Feng-hai; Tan, Yun-liang; Huang, Bin; Hu, Shan-chao Report Jan 1, 2018 6235
0730-174011sz0020/33 Double-deck Thermal Fusion Machine 4 Sets0730-174011sz0020/34 High Speed Flying Probe Testing Machine 4 Sets 0730-174011sz0020/35 Checking Station 12 Sets0730-174011sz0020/36 Single-axis Driller 3 Sets0730-174011sz0020/37 S. Nov 12, 2017 135
Pre-construction Investigation Exploratory Core Drilling Works At Dibang Multipurpose Project, Arunachal Pradesh. Nov 7, 2017 135
Geotechnical Investigation Including Drilling Of Boreholes, Collecting Samples, Testing Of Samples In Laboratory/field In Stretch From Marwasgram To Singrauli Station(102km) Both Inclusive, In Connection With Proposed Doubling Of Existing Railway Line Bet. Oct 18, 2017 276
Pre-construction Investigation Exploratory Core Drilling Works At Dibang Multipurpose Project, Arunachal Pradesh. Oct 15, 2017 133
2017 Investigation Of Drilling Rig Using Geothermal Heat. Oct 12, 2017 118
Observation Drilling Investigation And Protection Facility Installation Construction. Sep 16, 2017 124
Geo-technical Investigation Including Carrying Out Exploratory Drilling, Lab Testing (rock & Soil), In-situ Testing (hydro Fracture, Borehole Tele-viewer/aquatic Image & Pressuremeter/dilatometer). Aug 9, 2017 115
United States : Scoggins Dam geologic investigations continue. Jul 17, 2017 151
Soil Investigation With Rock Drilling. Jun 27, 2017 121
Soil Investigation With Rock Drilling. Jun 27, 2017 118
Schnbhl 8-track, Probing Boring. May 31, 2017 125
Geophysical Investigations, Exploratory Drilling, Chemical Analysis Of Water Sample. Nov 19, 2016 121
Provision Of Complementary Investigations Acc. 13 Asag Old Deposits District Vcklabruck - Drilling Services. Nov 3, 2016 106
Geophysical Investigations, Exploratory Drilling, Chemical Analysis Of Water Sample, Micro Level Hydrological Data Acqisition Including Ground Water Quality And Soil Infiltration Studies In 11 Districts Of Bundelkhand (except Lalitpur And Jhansi Di. Nov 3, 2016 141
Drilling Works For Geological Investigation Of Killing Dam Project In Karbi Anglong District Assam. Sep 27, 2016 135
Services Relate To The Execution Of Ground Investigations By Means Of Direct And Indirect Digestion Process, Tamping And Sampling. Aug 24, 2016 258
Core Drilling Of Ex Holes (270m) For Geo-technical Investigation In Cross Cut Of Drift (1.80m X 2.10m) At The Power House Location Of Nmhep. Aug 23, 2016 130
Bid Document for geotechnical Investigation (core Drilling. Aug 19, 2016 132
INVESTIGATION OF TEMPERATURE IN ORTHOPAEDIC DRILLING USING RESPONSE SURFACE METHODOLOGY. Report Jun 30, 2016 3264
Drilling Boreholes, Collection of Undisturbed/Disturbed Samples and Geotechnical Investigations. May 28, 2016 114
carrying out geotechnical soil investigation work including drilling bore holes. May 4, 2016 139
Carrying out geotechnical soil investigation work including drilling bore holes for alimco at kanpur and construction of auxiliary production unit at ujjain. May 4, 2016 160
Outsourcing Of Core Drilling Work Under Project Titled Preliminary Exploration For Potash Investigation In Satipura Sub Basin Of Nagaurganganagar Evaporite Basin, Hanumangarh District, Rajasthan, Fo. May 3, 2016 176
Ground Investigation Works. Apr 28, 2016 196
Ground Investigation Works. Apr 27, 2016 194
Design - Provisional Preparatory Work (Access Road and Didnt Sonda) Drilling and Production to Probe the Probe 14 Caragele Est. Mar 1, 2016 529
Investigation of vibration assisted drilling prospects for improving machining characteristics of hard to machine materials at high and low frequency ranges. Ostasevicius, V.; Balevicius, G.; Zakrasas, R.; Baskutiene, J.; Jurenas, V. Report Mar 1, 2016 5199
Diamond Core drilling (270 mtrs. 10% )and sampling over the area of investigation in lease hold of Roida C Iron & Mn. Mines of M/s. IDCOL Kalinga Iron Works Ltd. Feb 15, 2016 151
Consultancy service for carrying out geo technical and hydro geological investigation of hill slope and designing the soil nailing and self drilling rock bolting system for restoring the fmn at skiba. Feb 1, 2016 174
Diamond Core drilling (270 mtrs. 10% )and sampling over the area of investigation in lease hold of Roida C Iron & Mn. Mines of M/s. IDCOL Kalinga Iron Works Ltd. Feb 1, 2016 149
Contouring of area,developing long section of track,Fixing boundary pillars and control posts for layout of plant, soil investigation by drilling bore holes,collecting samples etc.,submitting reports. Jan 29, 2016 134
Contouring of area ,developing long section of track, fixing boundary pillars and control posts for layout of plant , soil investigation by drilling bore holes, collecting samples etc., submitting rep. Jan 15, 2016 182
Explanatory drilling works for foundation geological investigation to be carried out through shell and auger / rotary drilling / hydraulic drilling depending upon site condition as per is:1892:1979 wi. Jan 9, 2016 232
Drilling work for site investigation for check dams on river of various talukas of district : bhavnagar and botad. Dec 23, 2015 197
Provisional Preparatory Work, Drilling and Production Samples to Probe One New South Sasesc. Dec 16, 2015 304
Provisional Preparatory Work, Drilling and Production Samples to Probe Three Tapu. Dec 16, 2015 308
Offshore(marine) drilling work in water depth of 5 mtrs. to 10 mtrs. for foundation geological investigation to be carried out through rotary / hydraulic drilling rig for drilling of 3 bore holes of 4. Dec 4, 2015 225
Dike renovation michelau in oberfranken / site investigations / drilling, exploratory drilling, prospecting, laboratory tests. Nov 28, 2015 198
Drilling of nx to bx holes for geological investigation of lhep stage-i. Nov 20, 2015 132
Provisional Preparatory Work, Drilling and Production Samples to Probe 953 Bis Ash. Nov 4, 2015 308
Provisional Preparatory Work, Drilling and Production Samples to Probe Six Herepei. Nov 4, 2015 293
Provisional Preparatory Work, Drilling and Production Samples to Probe One Radeni. Nov 3, 2015 307
Provisional Preparatory Work, Drilling and Production Samples to Probe 402 Deleni. Nov 3, 2015 303
Offshore(marine) drilling work in water depth of 5 mtrs. to 10 mtrs. for foundation geological investigation to be carried out through rotary / hydraulic drilling rig for drilling of 3 bore holes of 4. Oct 20, 2015 261
Conducting Geo-Technical Investigation work such as Exploration / Drilling, Testing, For determination of different soil parameters and calculation of Safe bearing capacity (S.B.C) for the purpose of. Oct 18, 2015 150
Outsourcing of core Drilling Investigation for copper and associated mineralization in the gap area between Bokri and Malwali prospects of the Eastern Khetri Metallotect,Jhunjhunun district, Rajastha. Aug 26, 2015 152
Outsourcing of core Drilling Investigation for base metal insouthern extension of Nanagwas block, Neem Ka Thana, district Sikar, Rajasthan for 1000 Mtr, 150 M depth ( A 20% ) ( Item No. 48 FS 2015-. Aug 26, 2015 177
Parts of Drilling Wells - Radiators Probe. Jun 29, 2015 415
Provisional Preparatory Work, Drilling and Production Samples to Probe Three Tapu. May 27, 2015 261
Parts of Drilling Wells - Radiators Probe. May 20, 2015 400
Interim Preparatory Work, Drilling and Production Samples to Probe 4 Cris North. Apr 11, 2015 536
Interim Preparatory Work, Drilling and Production Samples to Probe Caragele 26 East. Apr 11, 2015 533
Interim Preparatory Work, Drilling and Production Samples to Probe 1 New South Saxon. Apr 9, 2015 536
Interim Preparatory Works (Road Access and Probe Box) Drilling and Production Samples to Probe 3 Vaida - Design. Apr 7, 2015 466
1. Design Services for Provisional Preparatory Work (Access Road and Didnt Probe), Drilling, Production and Installation Probe Technology: 1 - Probe 623 Sarmasel; 2. - Probe 624 Sarmasel; 3. - Probe 7. Mar 31, 2015 340
Geotechnical investigation including drilling of boreholes. Mar 20, 2015 160
Interim preparatory work, drilling and production samples to probe 16 bis Beia. Jan 9, 2015 479
Drilling of nx to bx holes for geological investigations at various components of doimukh hep in arunachal pradesh. Jan 5, 2015 111
Supply of Bread Board, CRO Probe Holder, Soldering iron, Desoldering pump, Soldering iron stand, Nose Pliers, Combination Pliers, Component Organizer, High speed PCB drilling machine, Embedded AVR Tra. Dec 1, 2014 101
Interim Preparatory Works, Drilling and Production Samples to Probe Three Roman Bogatu. Oct 26, 2014 507
Preparatory Work Provisional Drilling Tests for Exploration Probe. Oct 4, 2014 497
Geotechnical investigation including conducting confirmatory drilling required for collecting all required input data for design of tunnels. Sep 25, 2014 102
Gt investigation including drilling and lab testing of tunnel no.-10 (approx. 3.30 km) of jiribum-tupal section of n. f. railway. Aug 30, 2014 114
Explanatory drilling works for foundation geological investigation. Aug 9, 2014 207
Preparatory Work Provisional Drilling Tests for Exploration Probe 1 Gurba. Aug 9, 2014 417
Provisional Design Preparatory Work (Access Road and Close Probe) Tests for Drilling Wells. Jul 11, 2014 111
Interim Preparatory Work, Drilling and Production Samples to Probe One Bocsig Gara. Jul 9, 2014 488
Interim Preparatory Work, Drilling and Production Samples to Probe Three Armenians. Jul 8, 2014 510
Audio: Project Aims to Investigate Effects of Drilling on Groundwater. Jun 17, 2014 124
Drilling Fluids Probe 3 Boian. Mar 20, 2014 490
Investigations on drilling works. Jan 19, 2013 116
Canada : Cabo Drilling (Panama) Corp. and Fugro Panama S.A Form Alliance for On-site Investigation at the Panama Canal. Nov 6, 2012 378

Terms of use | Privacy policy | Copyright © 2020 Farlex, Inc. | Feedback | For webmasters