Printer Friendly

IPP power plant inaugurated in Oman.

Musandam Independent Power Project (IPP), a 120 MW power plant, supplied and built by Finland-based technology group WAaAaAeAnrtsilAaAaAeAn was inaugur in northern Oman.

According to Trade Arabia , the ceremony was attended by executives from the plant owners, Musandam Power Company (MPC), and WAaAaAeAnrtsilAa

The plant was delivered by WAaAaAeAnrtsilAaAaAeAn on a turnkey contract. Powe generated by 15 WAaAaAeAnrtsilAaAaAeAn 34DF dual-fuel engines running primaril gas but capable of switching to light fuel oil if necessary.

The efficient 34DF engines can reliably operate in high humidity and ambient temperatures that can reach 50 degrees C in the region.

[[banner]]

The Smart Power Generation plant also requires almost no water for cooling, which was an important consideration in the selection of the WAaAaAeAnrtsilAaAaAeAn solut

Salim Al Hashmi, project director, Musandam Power Company, stated: "This plant is a central part of the major integrated development of the Musandam Governorate.

"The project will play a significant role in meeting the power needs of the region's current and upcoming industries, while at the same time benefiting the local community."

Sushil Purohit, vice president, Middle East, Asia and Australia, Energy Solutions, added: "We are proud to showcase the capabilities of WAaAaAeAnrtsilAaAa Smart Power Generation in meeting the region's strict grid code requirements.

"We are proud that we can also contribute to a cleaner environment by lowering CO2 emissions through our advanced technology. We congratulate MPC and the Omani authorities for their vision and foresight in developing and supporting this project."

[c] 2017 ITP Business Publishing Ltd. All Rights Reserved. Provided by SyndiGate Media Inc. ( Syndigate

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Construction Week
Date:Nov 19, 2017
Words:258
Previous Article:Aldar sells out Phase 2 of $653m waterfront project in Abu Dhabi.
Next Article:ASHRAE seeks comments on standard for moisture-affected areas.
Topics:

Terms of use | Privacy policy | Copyright © 2020 Farlex, Inc. | Feedback | For webmasters