 VANCOUVER, British Columbia, March 10 /PRNewswire/ -- Robert G. Hunter, chairman of Taseko Mines Ltd. (NASDAQ: TKOCF, Vancouver: TKO) is very pleased to report exceptional results of reserve studies undertaken by Mineral Resources Development Inc. and metallurgical programs directed by Melis Engineering Ltd. at Lakefield Research for the Fish Lake copper-gold deposit. Results from work completed by these independent consultants prove the Fish Lake deposit to rank among North America's most economically significant mineral discoveries.
 Mineral Resources Development Inc. has calculated a mineral inventory (block model) for the Fish Lake deposit. The deposit's mineral inventory is:
 Fish Lake Deposit -- Mineral Inventory(a)
 Cut-Off Inventory Grade Contained Metal
 Cu Percent Million Cu Au Copper Gold
 Plus Au g/t Tons Percent oz/ton Billion Million
 Pounds Ounces
 0.30 1,410 0.22 0.012 6.2 17.3
 0.40 1,076 0.25 0.014 5.4 15.2
 0.50 765 0.27 0.016 4.1 12.5
 Note: (a) Calculation parameters: 121 drill holes, 100 meter radii polygons, specific gravity 2.70 gr/cm3, 15 meter bench composites.
 Mineral Resources Development Inc. has also calculated preliminary mineable reserves for the Fish Lake deposit. Preliminary mineable reserves are reported below for several progressively deeper pit designs:
 Fish Lake Deposit -- Preliminary Mineable Reserve(a)
 Copper Production
 Cost
 Strip Ratio Reserve Grade Net of Au Credits(b)
 Cu Au
 Waste: Ore Million Tons Percent oz/ton US $/lb
 0.80:1 164 0.24 0.015 0.19
 1.16:1 446 0.24 0.014 0.35
 1.49:1 557 0.24 0.014 0.39
 1.84:1 706 0.24 0.013 0.44
 2.11:1 895 0.24 0.013 0.52
 Note: (a) Insitu reserve within preliminary 42 degree slope pit designs, no dilution, if any, included; block gold grades cut to 0.0292 oz Au/ton; (b) Au U.S. $350/oz; Cu U.S. $1.00/lb.,$C/$U.S. 0.78.
 The Fish Lake deposit's mineable reserves, grades, stripping ratios and projected costs compare very favorably with North America's largest open-pit mines. Results indicate that the Fish Lake deposit, upon commercial production, would be one of the largest and lowest cost producers of copper in North America. Average copper production costs per pound from North American open pit, copper sulfide deposits are in the 65 cents-75 cents per ton range.
 In addition, comprehensive metallurgical testwork directed by Melis Engineering Ltd. at Lakefield Research under steady-state lock- cycle conditions on three separate composites, representing different depths of the Fish Lake deposit, have shown that excellent metal recoveries and concentrate grades are achieved by standard flotation methods. Recoveries for a head grade of 0.23 percent Cu and 0.0143 oz Au/ton average 87.5 percent for copper and 74.2 percent for gold. Concentrate grades average 26.4 percent Cu and 1.42 oz


Au/ton. These metal recoveries and concentrate grades were further confirmed by testwork conducted on each of 24 different composites made up with fresh HQ drill core from the recent drill campaign. These composites in total represent the entire volume of the Fish Lake deposit. Results from this comprehensive metallurgical program are significantly better than results announced previously by Taseko. Previously announced metallurgical results were based on preliminary testwork on a 1 ton, drill core sample which had been collected and stored for over a year. That sample had become weathered and oxidized during the storage period and was not a representative sample.
 Optimum mill through-put rates are now being determined for the Fish Lake Project. Mineable reserve studies and metallurgical programs completed indicate that, upon commercial production at, for example, an initial start-up rate of 66,000 tons per day, the Fish Lake deposit would produce on average, 95 million pounds copper and 254,000 ounces gold per year. If increased metal production is desired, additions to mill capacity could be made at a later date. The current reserve is capable of sustaining a world class mine for 30 to 40 years.
 Taseko Mines will now contract with an internationally recognized engineering group to complete a detailed and comprehensive Prefeasibility Study for the Fish Lake Project. In addition, the company will formally commence the British Columbia mine production permitting process.
 -0- 3/10/93
 /CONTACT: Robert G. Hunter, chairman of Taseko Mines, 604-684-6365/
 (TKOCF)


CO: Taseko Mines Ltd. ST: British Columbia IN: MNG SU:

KJ -- LA029 -- 4883 03/10/93 18:50 EST
COPYRIGHT 1993 PR Newswire Association LLC
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 1993 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:PR Newswire
Date:Mar 10, 1993
Words:748
Previous Article:MOREHOUSE INDUSTRIES REPORTS RESULTS
Next Article:FLEET FINANCIAL GROUP CHAIRMAN TERRENCE MURRAY ENDORSES PRESIDENT CLINTON'S BANKING REGULATORY PROGRAM
Topics:


Related Articles
KEMESS SOUTH GOLD-COPPER DEPOSIT ENTERS MINE DEVELOPMENT ASSESSMENT AND PERMITTING PROCESS
TASEKO MINES ANNOUNCES MINERAL RESERVE ESTIMATE FOR FISH LAKE DEPOSIT
Duluth Metals New Drill Results Confirm Increased Mineralization to Nokomis Deposit.
Capstone Reports Significant Increase in Copper-Gold Mineral Resources at Minto Mine, Yukon.

Terms of use | Copyright © 2016 Farlex, Inc. | Feedback | For webmasters