Printer Friendly

Browse Hydraulic flow topic

Articles

1-300 out of 600 article(s) nextnext page
Title Author Type Date Words
Part 6: Water Flow Measurement Equipment For Underground Flow Artificial Wet Survey/Part 6: Water Flow Measurement Equipment For Subsurface Flow. Oct 9, 2019 203
Johor govt to ask Putrajaya for funds to improve Causeway water flow. Sep 10, 2019 366
Some possible strategies for sustainable climate smart agriculture. Sep 10, 2019 2187
Autoclam Permeability System To Measure Air And Water Permeability And Water Absorption. Range Of Permeation Properties: Air Permeability Index : 0 To 3.912 Ln(pressure)/min. Absolute Maximum Rate Of Flow : 1ml/min Resolution In Water Flow Tests : 1microl. Sep 6, 2019 137
Vale SA (BVMF: VALE3) - Vale announces investments in water supply for Belo Horizonte metropolitan area -- 14/8/2019. Aug 30, 2019 1021
Provn Of Electronic Water Flow Metre And Special Repair To Water Supply Distribution System Under Ge I Navy Jamnagar. Aug 28, 2019 156
Directional Control Valves Market Value Share, Analysis and Segments 2019-2029. Aug 28, 2019 1169
Emerging Opportunities in Directional Control Valves Market with Current Trends Analysis. Aug 27, 2019 1184
Directional Control Valves Market Forecast Research Reports Offers Key Insights. Aug 27, 2019 1169
Water flow in River Sutlej fluctuating at 18 ft: NDMA. Aug 26, 2019 292
Brazil : Vale announces investments in water supply for Belo Horizonte metropolitan area. Aug 26, 2019 957
Water flow at River Sutlej fluctuating at 18 ft: NDMA. Aug 26, 2019 292
Normal water flow. Aug 23, 2019 122
Provn Of Electronic Water Flow Metre And Special Repair To Water Supply Distribution System Under Ge I Navy Jamnagar. Aug 23, 2019 153
Vale SA (BVMF: VALE3) - Vale announces investments in water supply for Belo Horizonte metropolitan area -- 14/8/2019. Aug 23, 2019 1022
NDMA warns serious flood like situation in River Sutlej, Ganda Singh Wala. Aug 21, 2019 540
NDMA warns serious flood like situation in River Sutlej, Ganda Singh Wala. Aug 21, 2019 602
Construction Of Gravity Water Flow Scheme at Darkwang Under Jampui Hill R.d Block Area Under Dws Division Dharmanagar During The Year 2019-20/Gr-i Rurban Scheme Under North Tripura District/construction Of Innovative Water Supply Scheme At Sabual Adc. Aug 20, 2019 109
Construction Of Gravity Water Flow Scheme At Darkwang Under Jampui Hill R.d Block Area Under Dws Division Dharmanagar During The Year 2019-20/Gr-ii In Connection With Rurban Scheme Under North Tripura District/construction Of Innovative Water Supply Sc. Aug 20, 2019 107
Construction Of New Well And Grit Chamber With Supplying And Installing 3nos Of Submersible Pumpset Etc. In Thaliyal Pump House For Avoiding The Sewer Water Flow To Killiriver At Chirapalam. Aug 20, 2019 165
NEWS BRIEFING Race cancelled due to fast water flow. Aug 19, 2019 180
Race cancelled due to fast water flow; NEWS BRIEFING. Aug 19, 2019 180
Water inflow in major rivers jumps to 502,300 cusecs. Aug 17, 2019 223
Vale SA (BVMF: VALES) - Vale announces investments in water supply for Belo Horizonte metropolitan area -- 14/8/2019. Aug 16, 2019 1021
Nhp- The Supply, Installation, Testing, Training, Commissioning, Operation And Maintenance Of Acoustic Doppler Current Profilers (adcps) For Discharge Measurement On Rivers In Kerala. Aug 16, 2019 170
1. Water Flow Meter, Model No - Std 720, Make - Honeywell, 2. Argon Flow Transmitter, Model - Vm04, Vortex Flow Meter, Make - Honey Well And 3. Steam Pressure Transmitter Vd1-lc1-pt-02, Model No. Stg7. Aug 10, 2019 221
Australia : Household water flow restrictions in Goldfields region decline 72 per cent. Aug 9, 2019 440
Australia : Household water flow restrictions in Agricultural region decline 75 per cent. Aug 9, 2019 472
Australia : Household water flow restrictions in South West region decline 92 per cent. Aug 9, 2019 443
Australia : Dramatic decline in water flow restrictions as financial assistance programs deliver for those in need. Aug 9, 2019 452
Water inflow in major rivers further jumps to 600,300 cusecs. Aug 3, 2019 228
Water inflow in major rivers further surges to 600,900 cusecs. Jul 30, 2019 230
Dismantling, Changing/Repairing Of Damaged And Worn Out Ms Pipe Line Of 10 Inch, 8 Inch, 14 Inch, 16 Inch Of Hydro Cyclone Over Flow Pipe, Unit No. 68 A, 68 C, 53 A, 53 B, 55 A, 55 B And 87 A Tank Underflow Pipe Etc. Of Preparation Plant Of Scw. Jul 30, 2019 184
Water inflow in major rivers further jumps to 542,200 cusecs. Jul 29, 2019 213
CM examines water flow at Head Balloki. Jul 28, 2019 326
River Chenab in low flood with Tavi, Jammu rivers calm. Jul 28, 2019 321
Supply Erection And Commissioning Of Water Flow Meters Online Ph Analyzer And Display And Board For Air And Water Parameters Display. Jul 20, 2019 156
Nhp- The Supply, Installation, Testing, Training, Commissioning, Operation And Maintenance Of Acoustic Doppler Current Profilers (adcps) For Discharge Measurement On Rivers In Kerala. Jul 18, 2019 163
Provision Of Services For The Inspection Of The Internal Fire Pipeline With The Determination Of Water Flow Without Turning On The Pump, The Internal Fire Pipeline With The Definition Of Water Flow With The Inclusion Of The Pump, Fire Hydrants. Jul 16, 2019 109
Water inflow in major rivers jumps to 537,300 cusecs. Jul 15, 2019 229
Construction Of Shaded Structure Over The Motorsand Panels Of Clariflocculator No-4 And Over Raw Water Flow Meter With Ancillary Works In Clarifire Rail Componenet Under Wtp-ii, Grww. Jul 13, 2019 106
Water level normal in KP rivers : PDMA. Jul 12, 2019 153
Consultation Number: 2019fcs0068 Operation Of The Electromechanical Structure Of The Vias Anti-salt Dam And The Hydraulic Flow Control Devices Of Containment Systems. Jul 11, 2019 211
Breaking Hard Rock For Smooth Water Flow At Sector-10a,vashi. Jul 11, 2019 138
Australia : Ancient groundwater enters food web. Jul 10, 2019 479
Brief Description Of The Lighting Proposed In The Draft:. Dynamic Linear Lighting Located On The Upper Part Of The Aqueduct. Dynamic Lighting Must Make Changes Of Intensity And Color To Simulate, Among Other Effects, The Water Flow Through The Aqueduct. I. Jul 9, 2019 244
Water inflow in major rivers increases to 456,100 cusecs. Jul 8, 2019 218
Water inflow in major rivers jumps to 415,400 cusecs. Jul 6, 2019 231
(2-110-/2019) Execution Of Initial Permits, Working And Project Documentation (according To The Decree Of The Government Of The Russian Federation No. 87 Dated February 16, 2008) On The Object: water Pipeline From The Outflow Chamber Of The Siphon To. Jul 5, 2019 127
Water inflow in major rivers jumps to 345,700 cusecs. Jul 5, 2019 230
Supply, Installation, Testing, Commissioning And Maintenance Of Acoustic Doppler Current Profilers (adcps) For Discharge Measurement Of Rivers In Jharkhand. Jul 4, 2019 168
Breaking Hard Rock For Smooth Water Flow At Sector-10a,vashi. Jul 3, 2019 138
Karnataka: Inflow of Tunga river rises after heavy rainfall in Western Ghats. Jul 2, 2019 184
Hydraulic presses. Jul 1, 2019 127
Lynemouth Lagoon Hydraulic Modelling. Jun 29, 2019 110
United States : Dane County to Purchase Land to Increase Public Shore Access, Provide Opportunities to Better Manage Water Flow in Yahara River. Jun 26, 2019 490
Supply Of Di Water Flow Monitor S4 Etc. Jun 18, 2019 142
Major rivers witnesses sharp water inflow. Jun 14, 2019 237
1007ns-water Flow Meter For 25 Mm Brass/bronze With Threaded Ends As Per Is-779 Class-b And Suitable Cylindrical Nipples Or Tail Pieces With Connecting Nuts. Meter Should Be Calibrated And Valid Certi. Jun 14, 2019 101
Water inflow in major rivers increases to 235,800 cusecs. Jun 11, 2019 222
Water inflow in major rivers increases to 235,800 cusecs. Jun 11, 2019 236
Water inflow in major rivers increases to 235,800 cusecs. Jun 11, 2019 196
Renovation Of Fines Recovery Discharge Chute, Pipelines, Cyclones Underflow Box Of Cyclones At Bhojudih Coal Washery. Jun 8, 2019 154
Water inflow in major rivers jumps to 288,400 cusecs. Jun 5, 2019 222
Water inflow in major rivers jumps to 288,400 cusecs. Jun 4, 2019 184
Water inflow in major rivers jumps to 249,700 cusecs. Jun 3, 2019 222
Completely Assembled Frp Induced Draft (with Suitable 3 Phase Electric Motor An Starter) Counter Flow Cooling Tower In Square/rectangular Shape Having Water Flow Rate 3000 Lpm Suitable For 200 Tr (min. Jun 3, 2019 204
Water inflow in major rivers jumps to 249,700 cusecs. Jun 3, 2019 212
Procurement Of Water Flow Indicators With T-mounting For The Generator Transformer Of 8x65 Mw For Omkareshwar Power Station. Jun 3, 2019 210
Diam Continues Efforts to Ensure Fresh Water Flow in A'Sharqiya. May 22, 2019 269
Procurement Of Water Flow Indicators With T-mounting For The Generator Transformer Of 8x65 Mw For Omkareshwar Power Station. May 21, 2019 208
Diam Takes Measures to Ensure Fresh Water Flow in A'Sharqiya. May 21, 2019 256
Supply Of Water Flow Meter (mechanical Type). May 21, 2019 139
Supply Of Water Flow Meter (mechanical Type). May 21, 2019 140
1)cacw Cooler To Drg. 34023540121, Var.00, Rev.00 And Water Flow Indicator As Per Drg. 44023540019 Rev.02. Qty: 10 No. May 19, 2019 125
Water flow from Glacial Lake at Shisper Glacier normal: GBDMA. May 19, 2019 266
Power Plant Aue - Revision Machine Group 1 - Los Turbine. May 17, 2019 226
Water inflow in major rivers jumps to 170,000 cusecs. May 15, 2019 216
Pakistan asks World Bank to empanel Arbitration Court as India threatens to halt water flow. May 10, 2019 419
Pak approaches WB as India warns to stop water flow Afghan-owned solution best for peace. May 10, 2019 429
Water Flow Indicating Switch As Per Attached Specifications. May 6, 2019 139
'Blockade on Yamuna may hamper flow of drinking water to Delhi'. May 4, 2019 302
Canada : Update on closure of Chaudiere Crossing due to high water flow. May 2, 2019 136
Development Of A Design Study For 7 Hydraulic Water Flow Control Structures, Distributed In The Communes Of Croix-mare, Saint-martin-de-if Dce On Https://Www. Marches-securises.fr: Smbv-caux-seine_76. May 2, 2019 108
Canada : Closure of Union Bridge on Chaudire Crossing due to high water flow. Apr 30, 2019 142
Replacement Of Water Flow Meter At Mil Stn Gandhidham Under Ge Army Bhuj. Apr 26, 2019 153
Consultation Number: 2019fcs0048 Exploitation Of The Electromechanical Structure Of The Vias Anti-salt Dam And The Hydraulic Flow Control Devices Of Containment Systems. Apr 25, 2019 133
Water Flow Improvement Dredging Construction In Anyangcheon Country River Section. Apr 23, 2019 117
1204ns01-high Pressure Trigger Gun Model Vega Inlet 3/8" Bsp, F & Outlet 1/4" Bsp F , Rated Pressure- 310 Bar, Water Flow 40 Lpm (max) Insulated Stainless Steel Lance Dia -1/4" & 700mm Long With Nozzl. Apr 23, 2019 104
Purchase Of Non-contact Type River Current/flow Measurement Instrument For Jnw, Parbati He Project (stage-ii) (package No. Proc-1775). Apr 22, 2019 209
Rmo Filter Water Supply Pump Set At Rashtrapati Bhavan New Delhi. Sh: Sitc Of Water Flow Meter Of Various Sizes At Sch B Pump House. Apr 21, 2019 103
Purchase Of A New Tractor And Takeover Of A Second-hand Tractor. Apr 20, 2019 118
Administrator warns farmers against tapping river water. Apr 19, 2019 436
Mechanical Vane Type Water Flow Meter. Apr 13, 2019 133
Replacement Of Water Flow Meter At Mil Stn Gandhidham Under Ge Army Bhuj. Apr 9, 2019 152
Water inflow in major rivers jumps to 110,600 cusecs. Apr 4, 2019 226
Supply Of Water Flow Switch. Apr 4, 2019 125
Pipe Turbulent Flow and Convection from First Principles and Disc Drag. Noonan, Michael Technical report Apr 1, 2019 6525
Does a Water Flow Timer Improve Food Handler Hand Washing Practices in Food Service Establishments? The Effects of Passive and Indirect Interventions. Her, EunSol; Behnke, Carl; Almanza, Barbara Cover story Mar 29, 2019 4295
Procurement Of Water Flow Indicators With T-mounting For The Generator Transformer Of 8x65 Mw For Omkareshwar Power Station. Mar 27, 2019 201
Call for urban forestry, mini dams to mitigate climate change impact. Mar 25, 2019 578
Faisal Vawda visits Irsa, briefed on river water situation. Mar 21, 2019 336
Construction Of A Gravity Collector In Lischert That Will Carry The Wastewater To The Future Wastewater Treatment Plant. Construction Of Storm Outlets At Existing Outlets To Limit Clear Water Flow To. Mar 16, 2019 106
Water aggression. Mar 12, 2019 493
Jangjeong Reservoir Inflow Outflow Pipe Replacement Work. Mar 8, 2019 121
Assessment of Water Quality Parameters and their Impact on Distribution of Fish Fauna in River Neelum, Azad Jammu & Kashmir, Pakistan. Sakhi-uz-Zaman; Shafi, Nuzhat; Ali, Usman; Ayub, Huma Mar 1, 2019 5683
Water war could be dangerous: Pakistan. Feb 23, 2019 852
Supply, Erection & Commissioning Of Dm Water Flow Meter For Koradi Tps 3x660mw. Feb 21, 2019 128
Canada : Province Announces Another Increase Of Outflows From The Shellmouth Reservoir. Feb 20, 2019 135
Drina River Basin Water Resources And Basin Study And Hydraulic And Hydrological Modelling. Feb 1, 2019 353
PS2.6m plan to tackle flood risk; project will use natural means to slow water flow. Jan 29, 2019 474
Sb Set-aside For Brazos And Co River Scour Hole Repairs Located Off Of The Gulf Iww In Texas. Dec 9, 2018 129
Supply Of Equipments For Mechanical Department 1. Models Of Assembly Universal Coupling, 2. Knuckle Joint, 3. Oldhamscoupling 4. Cotter Joint: 5. Drilling Jig 8. Gland And Stuffing Box Assembly 6.valve-not More Than Eight Parts 7. Foot Step Bearing. Nov 30, 2018 122
Water Flow Measurement Project Of Digboi Refinery. Nov 22, 2018 134
1)cacw Cooler Assy. To Drg. 14023540054 Var.00, Rev.00 With Tube Bundle Drg. No. 34023540139 It.01, Rev.00 And Water Flow Indicator Drg. 44023540019 Rev.01 Qty: 1 No. Nov 18, 2018 134
Jc18hst324 Measurement Of Water Flow In Pipelines Across Various Locations At Gujarat Refinery. Nov 10, 2018 136
Implementation Of Intelligent Water And Sewage Network Management System Including Rainwater Drainage Including: Water Flow Monitoring System. Nov 10, 2018 184
Construction Of The Zlobek Reservoir And Construction Of The Bukowina Outflow Tank. Nov 4, 2018 258
Water Flow Rate Measurement Job For Water Consumption Study At Haldia Refinery. Nov 2, 2018 141
Procurement Of 6 Inch Dia Water Flow Meter Confirming To Latest Is- 2373 For Mcl Talcher Area. Nov 2, 2018 159
1003037962/Water Flow Meter. Oct 29, 2018 160
Islamic Rep. admits it's blocking water flow into Iraq. Oct 26, 2018 351
2702 M And R To Providing, Fixing And Laying Pvc Pipe Line To Pass The Water Flow Of Nandwan Datarti Fhad System Bandhara Tal Sakri Dist Dhule. Oct 25, 2018 175
Flow Measurement Of Water Streams/condensate/bfw For Water Study At Iocl Barauni Refinery. Oct 24, 2018 134
Rfp - Professional Consulting Engineering Services Water System Hydraulic Model. Oct 21, 2018 139
Development Of Conceptual Approaches To Modeling Of Hydraulic And Transport Processes In The Environment Of The Crystalline Massif In Melechov And Pvp Bukov/Krav Hora. Oct 18, 2018 185
Supply And Installation Of Water Flow Meters. Oct 17, 2018 126
1)flame Proof Water Flow Indicator As Per Drg. 44023540024, Rev.00. Qty: 2 No 2)flame Proof Water Leakage Detector (ex "d" Type) As Per Drg. 24023540013 Rev.02. Qty: 2 No. Oct 16, 2018 135
Digital Water Flow Measurement Device. Oct 16, 2018 183
Supply Of Water Flow Switch. Oct 15, 2018 164
Providing Of Water Flow Meter In Connection With Armo Of Various E And Ms Services For Non-residential Bldg. And Residential Qtrs. At Nasc Complex, Pusa, New Delhi. Oct 13, 2018 110
Digital Water Flow Measurement Device. Oct 12, 2018 180
Supply Of Water Flow Meterssize: 25mm. Oct 11, 2018 143
Shahtoot dam. Oct 8, 2018 135
Providing Of Water Flow Meter In Connection With Annual Repair & Maintenance Operation Of Various E And Ms Services For Non-residential Bldg. And Residential Qtrs. At Nasc Complex, Pusa, New Delhi. Oct 6, 2018 113
1)cacw Cooler To Drg. 34023540123 Var.00, Rev.01 Along With Water Flow Indicator As Per Drg. 44023540019 Rev.01. note:-inspection Shall Be Done By Bhel/tpia As Per Qap No. Qa/mt/boi/025 Rev-01. Qty:. Oct 5, 2018 165
Dismantling/Rotation Of Pipe Upside Down/Repairing And Erection Of Thickener O/f Excess Water Flow Line To Pump House Area At Moonidih Coal Washery. Sep 28, 2018 132
Fv. 405 Gs-way Water Flow. Sep 23, 2018 222
United States : Reclamation releases final environmental documents for the Sacramento Deep Water Ship Channel Nutrient Enrichment Project. Sep 22, 2018 158
Study Of The Value Of Low-water Flow Rates (doe) Of 2 Measurement Stations In The Adour-garonne Basin Reference Number: 2018-068. Sep 16, 2018 146
Supply Of Hydraulic Flow Meter. Sep 15, 2018 117
Calibration Of Flow Meters From Nabl Accreditation Certificate Laboratory Of Intake Water Flow Meter, Raw Water Flow Mater (ahp) & Hcsd Lp Line Meter Installed Of 2x500 Mw. Mttps. Marwa. Sep 14, 2018 102
Bentley: Water Utilities Capitalize on Hydraulic Modeling to Minimize Totex, Reduce Risk, and Mitigate Water Loss. Sep 11, 2018 1154
Neelum-Jhelum power project needs redesigning. Sep 8, 2018 213
Neelum-Jhelum project , PM AJK concerns over change in direction of water flow. Sep 7, 2018 667
Neelum-Jhelum project , PM AJK concerns over change in direction of water flow. Sep 7, 2018 667
Neelum-Jhelum project, PM AJK concerns over change in direction of water flow. Sep 7, 2018 448
Increase in River Indus flow poses serious threats: study. Sep 5, 2018 488
Abrasive effects of sediments on impellers of pumps used for catching raw water/Efeitos abrasivos dos sedimentos em rotores de bombas utilizadas na captacao de agua bruta. Serrano, Rodrigo O.P.; de Castro, Ana L.P.; Rico, Edwin A.M.; Pinto, Maria A.; Viana, Edna M. de F.; Sep 1, 2018 3487
A war big enough to stop county water flow. Aug 30, 2018 994
Discharge Measurement Work At 57/a Rawshanpur Station Of 26 Dahuk River, 139-bardeshwari, 140-panchagarh Stations Of 57-karota River, 209/a Tetulia Of 80-mohanonda, 282-bhitorgarh Station Of 104-talma. Aug 30, 2018 179
Road Works And Water Drainage To Be Carried Out In The Framework Of Land Consolidation Water Flow Network - Part 2 Specifications No. 3042/Iv/E. E. 2 Of 2018. Aug 30, 2018 110
Sindh Irrigation authorities directed for ensuring water flow to tale areas. Aug 27, 2018 206
Sindh Irrigation authorities directed for ensuring water flow to tale areas. Aug 27, 2018 206
Czech Republic : Minister of Agriculture Toman: There are only 5 percent of the water in some rivers, since spring we have put into the rivers more than 360 million cubic meters of water. Aug 18, 2018 673
Improvement Of Heavy Rain Water Flow Drainage At Baikhungaon, W/no 1, Kajalgaon Town Under Btc. Aug 18, 2018 149
River Chenab flowing normal. Aug 16, 2018 121
Medium flood in River Chenab. Aug 15, 2018 140
Water flow in rivers normal. Aug 9, 2018 142
Rainwater Drainage Regulation In The Milanwek Commune Reconstruction Of The R-4 Ditch Basin For Rainwater Drainage With Water Retention Before The Outflow To The Rokitnica Stara River In Milanwek In. Aug 7, 2018 306
Hydraulic Flow Control Servo Valves. Aug 4, 2018 149
Water Flow Meter. Jul 30, 2018 134
Detail Survey And Preparation Of Designs And Hydraulic Modeling For Augmentation To Karanja Water Suply Tq Karanja Dist Washim. Jul 30, 2018 161
Repairing Of Live Frame Replacement Of Treverse Pipe, Perforated Panel Drive Assy Carden Shaft And Underflow Chutes Of Usk Screen Under Main Washing Plant Of Rajrappa Washery. Jul 29, 2018 182
Supply And Work For Design, Engineering, Installation, Erection And Commissioning Of Full-bore In Line Electromagnetic Water Flow Meter Of Various Locations At Dgbps. Jul 29, 2018 198
Construction of bridge in Shangla area sought. Jul 29, 2018 322
Sw For Analysis Of Water Flow And Transport Of Dissolved Substances Ii. Jul 28, 2018 105
Shed For Run Tank And Fluid Circuit Of Water Flow Test Facility At Iprc, Mahendragiri. Jul 28, 2018 176
Water inflow in major rivers further jumps to 510,300 cusecs. Jul 26, 2018 217
Water inflow in major rivers surges. Jul 25, 2018 575
Water inflow in major rivers surges to 501,700 cusecs. Jul 25, 2018 295
Water inflow in major rivers jumps to 427,000 cusecs. Jul 24, 2018 198
Water inflow in major rivers jumps to 427,000 cusecs. Jul 23, 2018 232
Consultation Number 18modelhydro Hydraulic Modeling Of The Drinking Water Network Operates As A Rule Before A Sectorization Study. Jul 20, 2018 118
Supply,installation & Commissioning Of Ultrasonic Water Flow Meters For Measurement Of Quantities Of Discharges At Wwr Kotamgaon And Raw Water Pump House(chp Line),ntps, Eklahare. Jul 20, 2018 136
Water inflow in rivers jumps to 416,900 cusecs. Jul 19, 2018 225
The Development Of A Conceptual Water Supply Solution With The Elaboration Of A Detailed Hydraulic Mathematical Model Of Present And Future State Of Development And Predictability Of Feasibility. Jul 16, 2018 127
Water inflow in rivers surges to 403,900 cusecs. Jul 15, 2018 207
Water inflow in rivers increases considerably. Jul 14, 2018 491
Water inflow in rivers jumps to 337,800 cusecs. Jul 14, 2018 249
Quantification of wetting front movement under the influence of surface topography. Chu, Xuefeng; Jia, Xinhua; Liu, Yang Report Jul 1, 2018 7722
Upgrading Water Hydraulic Modelling. Jun 28, 2018 226
Irsa alerts provinces to reduction in river inflows. Jun 24, 2018 764
Water inflow in rivers increases to 378,400 cusecs. Jun 12, 2018 233
Water inflow in rivers increases to 378,400 cusecs. Jun 12, 2018 193
Estimate For River Sutlej 3 Left Bandh Near Rd 196400 And 199000 For Improving Water Flow And Safety Of Bandh By Diverting River Water Flow From Left Side To Centre Of River By Dispose Off Surplus Riv. Jun 12, 2018 186
Water inflow in major rivers surges to 319,600 cusecs. Jun 7, 2018 284
Water inflow in major rivers jumps to 240,500 cusecs. Jun 6, 2018 214
Water inflow in major rivers jumps to 240,500 cusecs. Jun 5, 2018 254
Water inflow in major rivers jumps to 240,500 cusecs. Jun 5, 2018 254
IRSA increases shares of provincial river inflows as glaciers melt rapidly. Jun 4, 2018 392
Supply And Installation Of Bulk Type Water Flow Meters In Thirteen Elevated Stations With Necessary Accessories In Domestic Line And Providing Pipelines For Utilization Of Well Water In Ashok Nagar St. Jun 4, 2018 216
Around 7,000 people left without water after damaged pipe affects four postcodes; Engineers are currently attempting to restore water flow to homes and businesses. Jun 1, 2018 489
Deere-Hitachi Debuts 345G LC Reduced Tail Swing Excavator At Media Event. Jun 1, 2018 439
Model for Dilution Process of Landslide Triggered Debris Flows--A Case in the Guanba River, Southeastern Tibetan Plateau/Modelo para el proceso de dilucion del flujo de escombros originados por deslizamientos de tierra - Caso del rio Guanba, en el sureste del altiplano tibetano. Li, Jun; Chen, Ningsheng; Iqbal, Javed; Han, Dawei Report Jun 1, 2018 6981
Purchase Of Automatic Pou 25 000 L/H (hydraulic Flow 30 000 L/H) For Milk, 1 Set. May 30, 2018 125
Four Sectional Heat Exchanger For Operation In The Poc At 25 000 L/H (hydraulic Flow 30 000 L/H), Milk Product. May 30, 2018 133
The Milk Normalizer In A Flow Of 25 000 L/H (hydraulic Flow 30 000 L/H), 1 Set. May 30, 2018 127
Supply, Installation, Testing, Commissioning, Training And Maintenance Of Acoustic Doppler Current Profilers (adcps) For Discharge Measurement On Rivers In Odisha. May 30, 2018 168
Construction Of Shakra Pukur Surface Water Flow M.i Scheme At Mouza-chakmusliya, Jl No-87,plot No-23, Block-saltora, District-bankura. May 26, 2018 164
Reparing Of Ceiling Fan Exhaust Fan And Provision Of Water Flow Meter In Existing Pump Outlets In Connection With Repair Maintenance Operation Various E And M Services At Msib Complex 35 Sp Marg New Delhi. May 25, 2018 132
Proposal For The Work Of Renovation Of Fines Recovery Discharge Chute, Pipelines, Cyclone Underflow Box Of Cyclones At Bhojudih Coal Washery. May 24, 2018 164
Construction Of Shakra Pukur Surface Water Flow M.i Scheme At Mouza-chakmusliya, Jl No-87,plot No-23, Block-saltora, District-bankura. May 22, 2018 160
Construction Of Nabapukur Bundh Surface Water Flow M.i Scheme At Mouza-pabra , Jl No-86, Plot No-1291, Block-saltora, District-bankura. May 22, 2018 160
Only 11 Indus dolphins survive in India. May 10, 2018 486
1)cacw Cooler Assy. To Drg. 34023540057 Var.00, Rev.00 And Specification Of Water Flow Indicator Shall Be As Per Drawing 44023540019 & Water Leakage Detector Shall Be As Per Drawing 24023540004#01. Qt. May 10, 2018 140
5207ns18-set Consisting 02 Items. 1 2 Inch Cast Iron Foot Valve For Load Box Water Pump Suction Pipe Line = 02 Nos. Make: Kirloskar Or Sheetal. 2 Water Flow Meter Size 65mm. Specification : Is 2373. Apr 30, 2018 105
Supply And Installation Of Analog Water Flow Meters, Y-strainers And Automatic Water Level Controllers In Cmrl Depot Shed Premises. Apr 27, 2018 195
Supply And Delivery Following Following Water Flow Meters. Apr 26, 2018 151
BJP govt blocking Mahanadi water flow to Odisha: CM. Apr 23, 2018 211
Desilting Of Master Storm Water Drainage (open Drain) From Point H (in Sector-37) To Point-i (pataudi Road), Gurugram. "diversion Of Water Flow And Desilting Of Existing Open Drain With Poklain & Disposal Of Silt From Point-h (in Sector-37) To I (pataudi. Apr 23, 2018 126
Supply Of Open Channel Flow Equipments For Velocity, Discharge And Hydraulic Jump Measurement In Hydraulic Lab Of Civil Engg. Deptt. Apr 20, 2018 162
Desilting Of Storm Water Drainage Leg No. I (part) In Open & Covered Drain From Sikanderpur To Old Delhi Road, Gurugram. "diversion Of Water Flow And Desilting Of Existing Open Drain With Poklain And. Apr 20, 2018 187
Two Years Amc Of Electronic Water Flow Meters And Services Of Attendant For Observing The Flow Meter At Khadka, I&c-nptps, Parli-v. Apr 20, 2018 132
Supply And Delivery Following Following Water Flow Meters. Apr 16, 2018 150
Supply Of Differential Pressure Transmitter For Primary Water Flow Measurement Of 2x500 Mw, Mttps, Marwa, Janjgir-champa. Apr 14, 2018 104
3d Hydraulic Modeling And Digital Calibration Of Sanitation And Drinking Water Works. Apr 12, 2018 215
Grupo Rotoplas Buys Argentine Water Flow Solutions Provider. Apr 9, 2018 126
Grupo Rotoplas Buys Argentine Water Flow Solutions Provider. Apr 9, 2018 135
Deal snapshot: GRUPO ROTOPLAS BUYS ARGENTINE WATER FLOW SOLUTIONS PROVIDER. Apr 9, 2018 111
Calibration Of 7 Nos. Of Ultrasonic Water Flow Meters On The Pipe Lines Of Erai Dam. Apr 9, 2018 126
Repair To Ultrasonic Bulk Gsm Type Water Flow Meter Size 200mm Dia At Ge (army) Bhuj. Apr 9, 2018 134
Excavation Work For Diverting The Water Flow Towards East Side Of Ramnath Mahadev Temple In Aji River. Apr 8, 2018 174
When does a road become a river? Why hydrologists and water planners need to move beyond averages. Daniell, Katherine A.; Daniell, Trevor M. Editorial Apr 1, 2018 2228
Monte Carlo simulation for design flood estimation: a review of Australian practice. Loveridge, Melanie; Rahman, Ataur Report Apr 1, 2018 16085
Special Repair/Replacement Of Water Flow Meter And Clorination Plant Of Age Em Deolali Under Ge Deolali. Mar 29, 2018 143
India will build three dams in Uttarakhand to divert water flowing to Pakistan: minister. Mar 27, 2018 183
Reclamation Of Natural Water Flow Channel With Provision Of Extension Of Hume Pipe Upto Boundary Wall Outlet In Operation Area At Lilabari Airport. Mar 24, 2018 114
Nava Nadi Water Flow Diversion Structure, Kalandri. Mar 18, 2018 108
Dog's lucky escape from water flow pipe. Mar 17, 2018 372
Cooling Water Flow Transmitter. Mar 14, 2018 127
Construction And Calibration Of A Rainfall-runoff Model Of The Donnelly River Basin. Mar 13, 2018 105
Supply Of Water Flow Meter Heavy Duty Of Different Sizes. Mar 12, 2018 130
Carrying Out Total Station Survey Hydraulic Modelling Gis Mapping Prearing Dbr For Ganpatipule Torisum Water Supply Scheme (24 X 7) Tal. Dist.ratnagiri. Mar 12, 2018 137
Upgradation Of Cooling Water Flow Measurement System Of 20 Ton Electric Arc Furnace M/c No. 7254 At Smr Section By Replacement Of Existing Office Type Flowmeter With Trubine Type. Mar 12, 2018 150
Water flow in rivers improves. Mar 6, 2018 579
UC groundwater research: A survey. Downing, Jim Report Mar 1, 2018 6479
An Assessment Method for Debris Flow Dam Formation in Taiwan. Chen, Kun-Ting; Lin, Chia-Hsing; Chen, Xiao-Qing; Hu, Gui-Sheng; Guo, Xiao-Jun; Shieh, Chjeng-Lun Report Mar 1, 2018 5228
Purchase Of Filtering And Lubricating Elements For Maintenance Of Energy-saturated And Forage Harvesting Equipment;air Filter Mpe 93381; Filter M5305mk; Fuel Filter 33358, 2113831 Deuts; Hydraulic Flow Sheet - 8432 Mpg; Oil Filter P553771 Donaldson; Oil T. Feb 22, 2018 114
Storm Debris Clearing - Water Flow Obstruction. Feb 18, 2018 161
Supply & Installation Of 1 Nos. Water Cooler-cum-purifier . Water Flow Capacity 90 Lph With 120 Litre Storage Capacity. Purification System Is In-built With Same Machine. Option For Cold Purified Water & Normal Purified Water From Same Machine. Ultra-viol. Feb 15, 2018 121
Bachelor~~s 5th Drainage Pumping Station Inflow Pipe Improvement Business. Feb 13, 2018 121
Tender For B0104 Baildon Bridge scour Countermeasures, Concrete Repairs And Maintenance Works. Feb 9, 2018 180
Construction Connecting Waters Neuenfelde. Feb 8, 2018 248
Supply And Fitting 6 Dia Water Flow Meter (two Piece) At Moonidih Filter Plant. Feb 8, 2018 122
Development Of M.s Strainer By Fabrication At The Jetty At Rwps-ii To Arrest The Forighn Materials,entering Through The Main Suction During The Low Tide Water Flow At Hooghly River. Feb 2, 2018 157
Repairs/replacement Of Water Flow Channel ,valve Chamber And Connected Items At Mil Stn Jamnagar. Jan 29, 2018 133
Supply, Installation, Commissioning And Performance Prove Out Of One Number Digital Portable Water Flow Meter For Design And Development Department, Engine Division, Beml Mysore Complex. Jan 27, 2018 158
Khatib inspects waste outflow through Nahr El Kalb River: Sami Gemayel's accusations and misleading arguments about source of garbage incorrect. Jan 23, 2018 231
Jangsu Gun Regional Waterworks Modernization Project Distribution Water Flow Monitoring Equipment Manufacturing Purchase Purchase And Installation. Jan 23, 2018 107
08 Package1 Set Of Photochemical Reaction Apparatus, 1 Set Of Visual Modflow (underground Water Flow Field And Pollutant Migration Simulation Software), 1 Set Of Explosion Limit Tester, 1 Micro Contin. Jan 17, 2018 123
Job Work For Repair/maint Of Water Flow Meter Installed At Water Supply Pump House Pinto Park At Af Stn Palam. Jan 15, 2018 129
Fabrication And Erection Of Underflow Pipe With Reducer Of Unit No. 247 From 9mtr. Of Sec-ii In Hms At Ktw. Jan 4, 2018 103
Augmentation To Kalamb Water Supply Shceme (reform Works 14th Finance Commission) Tah.kalamb Dist. Yavatmal Carrying Out Consumer Survey, Water Audit, Energy Audit, Installing Flow Meter, Gis Mapping And Hydraulic Modelling. Jan 4, 2018 153
Transient Air-Water Flow and Air Demand following an Opening Outlet Gate. Yang, James; Liu, Ting; Dai, Wenhong; Teng, Penghua Report Jan 1, 2018 7086
Investigation of the Aquifer Protective Capacity and Groundwater Quality around Some Open Dumpsites in Sapele Delta State, Nigeria. Oseji, Julius Otutu; Egbai, James Chucks; Okolie, Emmanuel Chukwuemeka; Ese, Etebefia Chris Report Jan 1, 2018 7431
Variation of Velocity Distribution in Rough Meandering Channels. Pradhan, Arpan; Khatua, Kishanjit Kumar; Sankalp, Sovan Report Jan 1, 2018 5541
Computational and Experimental Investigations of Fluid Flow in Rock Materials. Ma, Dan; Chen, Zhongwei; Peng, Yan; Masoudian, Mohsen S. Jan 1, 2018 2206
The Mass Loss Behavior of Fractured Rock in Seepage Process: The Development and Application of a New Seepage Experimental System. Kong, Hailing; Wang, Luzhen Jan 1, 2018 5584
Numerical Investigation on Hydraulic Properties of Artificial-Splitting Granite Fractures during Normal and Shear Deformations. Xiong, Feng; Jiang, Qinghui; Chen, Mingxi Jan 1, 2018 7262
Geohazard Caused by Groundwater in Urban Underground Excavation. Hsiung, Bin-Chen Benson Jan 1, 2018 5565
High-Resolution Wellbore Temperature Logging Combined with a Borehole-Scale Heat Budget: Conceptual and Analytical Approaches to Characterize Hydraulically Active Fractures and Groundwater Origin. Meyzonnat, Guillaume; Barbecot, Florent; Corcho-Alvarado, Jose A.; Tognelli, Antoine; Zeyen, Hermann Jan 1, 2018 13801
The Parabolic Variational Inequalities for Variably Saturated Water Flow in Heterogeneous Fracture Networks. Ye, Zuyang; Jiang, Qinghui; Yao, Chi; Liu, Yanzhang; Cheng, Aiping; Huang, Shibing; Liu, Yaning Jan 1, 2018 8531
Predicting Erosion-Induced Water Inrush of Karst Collapse Pillars Using Inverse Velocity Theory. Yao, Banghua; Chen, Zhongwei; Wei, Jianping; Bai, Tianhang; Liu, Shumin Jan 1, 2018 7835
Migration of Gas in Water Saturated Clays by Coupled Hydraulic-Mechanical Model. Pazdniakou, Aliaksei; Dymitrowska, Magdalena Jan 1, 2018 16881
Water flow to reservoirs second-worst in a decade. Dec 28, 2017 316
Pakistan doesn't blame India for water theft. Dec 28, 2017 1120
Supply Of Hydraulic Flow Indicator (analogue/digital Type). Dec 28, 2017 105
Procurement Of Water Flow Switch Hfs-25 For Qty 10 Nos. Dec 27, 2017 105
Job Work For Repair/maint Of Water Flow Meter Installed At Water Supply Pump House Pinto Park At Af Stn Palam. Dec 27, 2017 124
Supply And Installation Of 12 Nos Automatic Chior Nation Plants, 19 Nos. Digital Water Flow Meter-cum-totaizer & Digical Water Profile Meter For Vanous Pumps At Pnbe, Rjp8 & Kwx And Operation Maintenance Of These Plants And Treatment Of Water For Five Yea. Dec 26, 2017 102
Supply Of Electrical : 2" Ms Ballvalve Thread Type (shenko Make),1" S.s Ball Valve Thread Type (leader Make) ,3" Ms Ball Valve Thread Type (shenko Make),2" Flange End Type Water Flow Meter (kranthi Make),1" Screwed End Type Water Flow Meter (kranthi Make). Dec 22, 2017 134
New study proposes redesigned dam water flow to benefit native fish. Dec 20, 2017 458
Dismantling Overhauling Repairing Erection And Alignment Of Pipes From Haul Road To Fresh Water Reservoir Thickner Under Flow And 602 Pump Delivery Underflow Pump Section Of Rajrappa Washery. Dec 18, 2017 164
Carrying Out Consumer Survey, Water Audit , Energy Audit, Providing And Installing Flow Meter, Gis Mapping, Hydraulic Modeling For Kalamb Water Supply Scheme At Municipal Council Kallam. Dec 14, 2017 161
Repair To Boundary Wall, Construction Of Drain Adjoining Boundary Wall For Easy Water Flow In The Premises Of Jda Division No.1. Dec 12, 2017 151
Water System Hydraulic Model And Master Plan. Dec 10, 2017 111
Flowing Water Flow And Biodiversity Of Running Waters: The Impact Of Natural Conditions And Anthropogenic Interference. Dec 8, 2017 400
Sarneraa Alpnach, Laying Of The Etschistrasse/Approach To The Weir And Outflow Structure. Dec 7, 2017 183
Contract For The Work Of Removal & Diversion Of Dry/wet Ash In The Velhala Ash Bund No 3 To Prepare Space For Water Flow In The Bund At Ahp,btps Deepnagar. Dec 3, 2017 139
SMALL GLACIERS' BIG CONTRIBUTIONS TO THE WATER CYCLE. Dec 1, 2017 364
Han River Inflow And Ash Water Dredging Construction. Nov 28, 2017 118
Hiring Of Portable Ultrasonic Electromagnetic Flow Meter For Measuring Water Flow In Ee(e And M)w And S-sw Division. Nov 19, 2017 141
To Divert The Water Flow In Damodar River From East Ward To West Ward To Solve The Water For Jaridih Bazar Underbokaro Colliery. Oct 25, 2017 102
Supply Of Cacw Cooler With Water Flow Indicator And Watar Leakage Detector. Oct 17, 2017 106
Water Flow Meter. Oct 13, 2017 140
Estimating the van Genuchten retention curve parameters of undisturbed soil from a single upward infiltration measurement. Moret-Fernandez, D.; Pena-Sancho, C.; Latorre, B.; Pueyo, Y.; Lopez, M.V. Report Oct 1, 2017 6503
Development and Validation of the SAE J3052 High Pressure Differential Flow Rate Recommended Practice. Antanaitis, David B.; Lloyd, E Case study Oct 1, 2017 7290
CFD-Guided Heavy Duty Mixing-Controlled Combustion System Optimization with a Gasoline-Like Fuel. Pei, Yuanjiang; Zhang, Yu; Kumar, Praveen; Traver, Michael; Cleary, David; Ameen, Muhsin; Som, Siben Oct 1, 2017 8435
100% Small Business Set-aside For Gulf Intracoastal Waterway Texas Brazos River Floodgates And Colorado River Locks In Brazoria And Matagorda Counties Texas Repair Of Scour Holes. Sep 27, 2017 121
Removal Of Aagayathamarai , Floating Plants Arround In Take Wells Obstraction For Water Flow Near Pickup Weir At Vaigai Dam. Sep 19, 2017 115
Carrying Out Consumer Survey, Water Audit , Energy Audit, Providing And Installing Flow Meter, Gis Mapping, Hydraulic Modeling For Kalamb Water Supply Scheme At Municipal Council Kallam. Sep 18, 2017 168
Electro Magnatic Water Flow Meter (electronic) Size 150 Mm Make:siemens,levcon, Umag,emersham,itoa. Sep 18, 2017 141
India : CGWB enters into MoA with IIS Bangalore for development of ground water flow models and preparation of aquifer management plans for parts of Karnataka. Sep 9, 2017 263
Set Of Water Flow Meters Of Diffrent Sizes As Given Below A Water Flow Meter, Size: 1 1/2 , B Type Isr 04nos B Water Flow Meter, Size: 2 , B Type Isr 04nos Make : Kranthi/ztech Note: One Year Warranty/Gaurantee Certificate Should Accompany The Supply. Sep 4, 2017 145
On the Pore-Scale Modeling and Simulation of Reactive Transport in 3D Geometries. Iliev, Oleg; Lakdawala, Zahra; Nessler, Katherine H.L.; Prill, Torben; Vutov, Yavor; Yang, Yongfei; Report Sep 1, 2017 9088
1water Flow Indicator Confirming To Annexure -a To Pi-241171345 & Check List To Pi. 241171345 As Enclosed. Qty: 32 No. Aug 30, 2017 122
Water Supply Management - Construction Of A Telemetry System Based On A Hydraulic Model In The Right-bank And Left-bank Part Of Szczecin. (poland-szczecin: Site Preparation And Clearance Work). Aug 27, 2017 140
Anglers to monitor fish for dam water flow trial. Aug 19, 2017 553
Anglers join dam project fish survey; impact of changes to water flow measured. Aug 19, 2017 545

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters