Printer Friendly

High - Water Retention Basins Merching, Engineering Services From Performance Level 3.

Contract notice: High - water retention basins merching, engineering services from performance level 3.

In the framework of the flood protection at the Oberen Paar, the planned construction of the floodwater retention basin in Merching will lead to an outflow of 11.7 m 3 / s (control output) compared to the actual state at HQ100 of about 30 m 3 / Can be throttled. The installation volume is approx. 1 100 000 m 3 with a single-surface area of approx. 105 ha. A double-flow through-flow system in in-situ concrete construction with corresponding regulating guards is provided as a decisive operating device for the control of the flood retention basin. The control is carried out automatically by means of PLC using the discharge level below the structure. The dam structures, which are arranged on both sides of the passageway structure, are constructed as homogeneous earth dams with a slope slope of 1: 3 on both sides. Within the scope of the open procedure, planning services (object planning, structural planning and technical equipment according to HOAI with special services starting at level 3) are awarded for the implementation of the flood retention basin.

This contract is divided into lots: no

Time limit for receipt of tenders or requests to participate: Date: 20/06/2017

Local time: 11:00

Major organization : WASSERWIRTSCHAFTSAMT DONAUWRTH

Address : Frgstrae 23

Donauwrth

86609

Germany

Country :Germany

Email : poststelle@wwa-don.bayern.de

Tender notice number : 191614-2017

Notice type : Tender Notice

Open date : 2017-06-20

Tender documents : T39765718.html

[c] 2017 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:May 22, 2017
Words:259
Previous Article:Shipyard Installation 2017 Tl "nordergrnde".
Next Article:Fvs, Wiesbaden - Joinery - Sports Floor And Baffle Walls.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters