Printer Friendly

Gas natural gas kotellnoy building AODT (repeat).

Contract awarded for Gas natural gas kotellnoy building AODT (repeat)

The full cycle of construction works on the construction of production and technical building. Work carried out on the basis of design and estimate documentation and other requirements and construction standards.; The full cycle of construction works on the construction of production and technical building. Work carried out on the basis of design and estimate documentation and other requirements and construction standards.

Price per unit without VAT in tenge: 3 121 000,00; 2 623 000,00

Sum: 3 121 000,00; 2 623 000,00

Expiration date: 05-08-2015

Contractor name : PRK GAZSANTEHMONTAZH

Contractor address : Kazakhstan

Implementing agency : Atyrau OTD,

Atyrau, Atyrau GA, Atyrau

Country :Kazakhstan

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

 
Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Aug 26, 2015
Words:129
Previous Article:Services related to printing.
Next Article:Alarm systems.
Topics:

Terms of use | Privacy policy | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters