Printer Friendly

Flood Control Program Of The Les Hydraulic Developments Of Cons-la-grandville- Preparatory Work Creation Of Access Ramp, Pavement Cutting, Temporary Diversion Of Water, Exe Studies, Etc. - Excavated/Embanked Earthworks - Evacuation And Landfill - Demoli.

Contract notice: flood control program of the les hydraulic developments of cons-la-grandville- preparatory work creation of access ramp, pavement cutting, temporary diversion of water, exe studies, etc. - excavated / embanked earthworks - evacuation and landfill - demolition of civil engineering and light building - reconstruction of masonry stone - free rockfill - concrete rockfill - local stone facings - reclamation including private gardens

Deadline for receipt of tenders: 28/09/2018 at 12:00

Award criteria:the most economically advantageous offer based on the criteria set out in the specifications (consultation rules, letter of invitation or descriptive document).

Major organization : SIAC.

Address : 3 Avenue Charles De Gaulle 54260 Longuyon

Attn: Morgane Pitel

Country :France

Tender notice number : 18-111146

Notice type : Tender Notice

Open date : 2018-09-28

Tender documents : T436733292.html

[c] 2018 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2018 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2018 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Aug 4, 2018
Words:134
Previous Article:Automobile Fleet Insurance And Machine Breakage/Maurienne Motorway A43/Frejus Tunnel.
Next Article:Flood Control Program Of The Lese Hydraulic Facilities Longuyon Zrdc- Preparatory Work Creation Of Access Ramps, Road Cut, Temporary Diversion Of...
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters