Title |
Author |
Type |
Date |
Words |
Russia halts electricity supply to another EU country. |
admin |
|
May 22, 2022 |
251 |
Scrap 12% VAT on power rates, incoming Marcos admin asked. |
|
|
May 20, 2022 |
795 |
Lines to evacuate Karuma Dam power ready UETCL. |
|
|
May 20, 2022 |
515 |
Lines to evacuate Karuma Dam power ready - UETCL. |
|
|
May 20, 2022 |
514 |
The High Pressure Electric Power Transmission Line (Rasheed - Musayyib Gas) Subjected To Sabotage. |
|
|
May 19, 2022 |
247 |
Zimbabwe turns to renewable energy. |
|
|
May 18, 2022 |
715 |
Nuscale Power signs MoU with Associated Electric Cooperative over SMR deployment. |
|
|
May 18, 2022 |
170 |
TCN Energises Odukpani-Ikot Ekpene 330kV DC Transmission Line. |
|
|
May 17, 2022 |
175 |
Inside Uganda, Tanzania power lines deal. |
|
|
May 17, 2022 |
320 |
Inside Uganda, Tanzania power lines deal. |
|
|
May 17, 2022 |
314 |
Govt to allow private sector to commercially use national grid for power transmission: Nasrul Hamid. |
|
|
May 17, 2022 |
434 |
TCN Energizes Odukpani-Ikot Ekpene 330kV DC Transmission Line. |
|
|
May 16, 2022 |
404 |
America's Electric Grid Has A $2 Trillion Problem. |
admin |
|
May 16, 2022 |
865 |
TCN Reconstructs Vandalised Transmission Tower In Uyo - TCN. |
|
|
May 12, 2022 |
384 |
TCN reconstructs vandalised transmission tower in Uyo. |
|
|
May 12, 2022 |
389 |
Transelec strengthens its electrical system. |
|
|
May 12, 2022 |
1108 |
$90 million-worth electricity transmission and distribution infrastructure in three provinces inaugurated. |
|
|
May 11, 2022 |
195 |
EBRD supports Ukraine electricity transmission company, backed by EU guarantee. |
|
|
May 11, 2022 |
336 |
Dastgir Khan Directs NTDC To Accelerate Work On Ongoing Projects. |
|
|
May 10, 2022 |
312 |
NTDC asked to speed up projects. |
|
|
May 10, 2022 |
221 |
Key $92M electricity grid project launched across three provinces. |
|
|
May 10, 2022 |
495 |
Dastgir Khan directs NTDC to accelerate work on ongoing projects. |
|
|
May 10, 2022 |
312 |
US$90 Million-worth Electricity Transmission and Distriubtion Infrastructure in Three Provinces Inaugurated. |
|
|
May 10, 2022 |
202 |
Ethiopia, South Sudan to link by 357 kilometers electric line. |
|
|
May 8, 2022 |
284 |
UETCL back to drawing board after Shs1.5b loss. |
|
|
May 6, 2022 |
697 |
Addressing Challenge of National Electricity Grid Collapse. |
|
|
May 6, 2022 |
1076 |
SPP Backs NextEra's Power Line Project Near Oklahoma City. |
Massey, Kyle |
|
May 2, 2022 |
321 |
Matiari-Lahore transmission line set for full load test after Eid. |
|
|
Apr 30, 2022 |
437 |
PIPPA seeks 'sufficient power reserves' for election period. |
|
|
Apr 29, 2022 |
436 |
EU To Support Nigeria In Stabilising Electricity Transmission Network. |
|
|
Apr 29, 2022 |
347 |
NextEra Energy Transmission wins SPP Minco-Pleasant Valley-Draper transmission line project. |
|
|
Apr 28, 2022 |
165 |
$44mn Nahida power plant begins operations says Oman Electricity Transmission Company. |
Jason Saundalkar |
|
Apr 28, 2022 |
235 |
$44mn Nahida power plant begins operations says Oman Electricity Transmission Company. |
Jason Saundalkar |
|
Apr 28, 2022 |
214 |
SEA Games 31: Phu Tho ensures power supply for men's football competitions. |
|
|
Apr 27, 2022 |
297 |
Ukraine granted official status in ENTSO-E. |
|
|
Apr 27, 2022 |
199 |
Nepra All Set To Transfer Burden Of Rs42b To Electricity Consumers Of Discos, KE. |
|
|
Apr 27, 2022 |
710 |
Explainer: What To Know On Nigeria's National Power Grid. |
|
|
Apr 23, 2022 |
677 |
Malawi, Mozambique Launch Power Interconnector Project. |
|
|
Apr 22, 2022 |
508 |
NGCP earmarks P160-B capex for projects until 2025. |
|
|
Apr 21, 2022 |
514 |
Napocor to add more capacity in off-grid areas. |
|
|
Apr 19, 2022 |
400 |
Napocor plans to boost power capacity. |
|
|
Apr 19, 2022 |
458 |
NGCP upgrades Bohol transmission towers. |
|
|
Apr 19, 2022 |
379 |
NGCP concludes partial restoration of typhoon-damaged facilities. |
|
|
Apr 18, 2022 |
394 |
NGCP completes restoration of storm-hit Bohol power lines. |
|
|
Apr 18, 2022 |
193 |
Explainer: What To Know On Nigeria's National Power Grid. |
|
|
Apr 17, 2022 |
677 |
PM Petkov Visits Bitola-Elbasan Interconnector. |
|
|
Apr 16, 2022 |
186 |
Performance Analysis of PSDRCT-RFEH-DF in Cooperative Networks. |
Zhou, Yongqiang; Dai, Lei; Qian, Huan; Li, Suoping |
|
Apr 15, 2022 |
3761 |
Matiari-Lahore transmission line set for full load test after Eid. |
|
|
Apr 15, 2022 |
437 |
Grid collapse: Nigerian government approves N1.4bn for power transmission projects. |
|
|
Apr 14, 2022 |
551 |
Analysis of the Influence of the Distribution and Development of Soil Caves on the Stability of High-Voltage Transmission Tower Foundations. |
Zhou, Yingbo; Zhou, Li; Duan, Zhiqiang; Ke, Fangchao; Liu, Huan |
|
Apr 12, 2022 |
7507 |
EBRD lends EUR 20 million to upgrade electricity transmission grid in Bosnia and Herzegovina. |
|
|
Apr 12, 2022 |
365 |
Data Collecting and Energy Charging Oriented Mobile Path Design for Rechargeable Wireless Sensor Networks. |
Zhang, Meiyan; Cai, Wenyu |
|
Apr 8, 2022 |
6924 |
Synergy Grid infuses P12.2 billion into NGCP. |
|
|
Apr 7, 2022 |
476 |
Nuvve Holding and Toyota Tsusho admitted into Japanese energy markets. |
|
|
Apr 6, 2022 |
155 |
On the March; Enough sun to heat 70k homes. |
|
|
Apr 2, 2022 |
189 |
Routing Protocol for Wireless Sensor Networks Based on Virtual Force Disturbing Mobile Sink Node. |
Yao, Yindi; Xie, Dangyuan; Wang, Chen; Li, Ying; Li, Yangli |
Report |
Apr 1, 2022 |
8193 |
Chinese firm seeks Rs12.35bn dues for power project. |
|
|
Mar 31, 2022 |
499 |
Introduce smart grid concept, ZETDC urged. |
|
|
Mar 29, 2022 |
562 |
Mozambique renews power supply contract with Zimbabwe. |
|
|
Mar 28, 2022 |
153 |
500/220kV transmission line project lagging behind schedule. |
|
|
Mar 22, 2022 |
498 |
Bulgaria's Gross Electricity Consumption to Not Exceed 43,298 GWh by 2031, System Operator Forecasts. |
|
|
Mar 22, 2022 |
342 |
Telco, airlines now open to full foreign ownership. |
|
|
Mar 22, 2022 |
906 |
Power Infrastructure. |
|
|
Mar 21, 2022 |
573 |
Mainahiya-Sampatiya Transmission Line To Complete By Mid-July. |
|
|
Mar 21, 2022 |
550 |
Fault-Tolerant Relay Node Placement in Wireless Sensor Networks for Surveillance of Overhead Transmission Lines. |
Wang, Kaixuan; Yang, Jian |
Report |
Mar 20, 2022 |
7761 |
Raging storm blows off iron sheeted roofs of several houses in district Abbottabad. |
|
|
Mar 20, 2022 |
204 |
As Power Sector Falters, TCN Trudges On. |
|
|
Mar 20, 2022 |
1857 |
Nepal-India Energy Exchange: Construction of Mainahiya-Sampatiya transmission line at high-speed. |
|
|
Mar 20, 2022 |
278 |
Nepal-India Energy Exchange: Construction Of Mainahiya-Sampatiya Transmission Line At High-Speed. |
|
|
Mar 20, 2022 |
280 |
How conniving officials left UETCL Shs564 billion poorer. |
|
|
Mar 19, 2022 |
2072 |
How conniving officials left UETCL Shs564b poorer. |
|
|
Mar 19, 2022 |
2091 |
Japan firm bags contract for NGCP submarine cable. |
|
|
Mar 19, 2022 |
333 |
Emotional Feeling Evaluation Model in Underwater Environment Based on Wearable Sensor. |
Han, Xiao; Yan, Hongwei; Liu, Baojian; Liu, Wen |
Report |
Mar 16, 2022 |
7961 |
As Power Sector Falters, TCN Trudges On. |
|
|
Mar 15, 2022 |
1864 |
Elering reconstructing high-voltage power lines from Narva to Valga. |
|
|
Mar 15, 2022 |
475 |
Govt moves to mergethree electricity agencies. |
|
|
Mar 11, 2022 |
605 |
Govt moves to merge three electricity agencies. |
|
|
Mar 11, 2022 |
609 |
Lesco tells Nepra shifting transmission lines impossible. |
|
|
Mar 9, 2022 |
319 |
Chinese firm seeks Rs12.35bn dues for power project. |
|
|
Mar 9, 2022 |
537 |
Rejlers approved as a supplier of consulting services for the general planning of transmission lines by Fingrid. |
|
|
Mar 8, 2022 |
211 |
Rejlers approved as a supplier of consulting services for the general planning of transmission lines by Fingrid. |
|
|
Mar 8, 2022 |
210 |
How UETCL board got red flags flying. |
|
|
Mar 6, 2022 |
1443 |
Baltics limiting electricity imports from Russia. |
|
|
Mar 3, 2022 |
221 |
French exhibitors to introduce new technologies at MEE. |
|
|
Mar 3, 2022 |
736 |
Power transmission lines under MCC grant: Land acquisition, use of forested area could be an issue. |
|
|
Mar 1, 2022 |
752 |
Land Acquisition, Use Of Forest Area Could Be An Issue. |
|
|
Mar 1, 2022 |
752 |
Nevada's Energy Profile--2022. |
Longo, Bernadette M. |
|
Mar 1, 2022 |
2592 |
NTDC ENERGIZED 220/132 kV GRID STATION JHIMPIR-II. |
|
|
Feb 28, 2022 |
199 |
Pakistan Cables completes 3rd ACCC conductor installation. |
|
|
Feb 28, 2022 |
329 |
Politics, nepotism rear ugly head at UETCL. |
|
|
Feb 27, 2022 |
1423 |
Nepal, India Agree To Expedite Hydropower Development, Trade. |
|
|
Feb 25, 2022 |
505 |
$50bn grid-related spend seen for green energy in GCC. |
|
|
Feb 23, 2022 |
522 |
Egypt-Sudan electricity interconnection to become corridor for energy transmission to Africa, Europe. |
Egypt Today staff |
|
Feb 23, 2022 |
364 |
NTDC completed 220/132 kV grid station Jhimpir-II. |
|
|
Feb 21, 2022 |
210 |
NTDC completed 220/132 kV grid station Jhimpir-II. |
|
|
Feb 21, 2022 |
210 |
Vandals steal system installed to track theft of electricity assets. |
|
|
Feb 20, 2022 |
493 |
Matiari HVDC line repeater station in need of repairs. |
|
|
Feb 20, 2022 |
243 |
Solu Corridor Transmission Line Comes Into Operation. |
|
|
Feb 15, 2022 |
487 |
Upgrade of Bohol towers completed by April, says NGCP. |
|
|
Feb 11, 2022 |
359 |
Pakistan Cables completes third ACCC conductor installation. |
|
|
Feb 9, 2022 |
416 |
Gusts fuel power surge from turbines at weekend. |
SHAUNA CORR Environment Correspondent |
|
Feb 8, 2022 |
171 |
InfraWatch: Enactment of PSA amendments not enough to lure foreign investors. |
|
|
Feb 3, 2022 |
385 |
FESCO striving hard to provide uninterrupted power supply. |
|
|
Feb 3, 2022 |
446 |
FESCO striving hard to provide uninterrupted power supply. |
|
|
Feb 3, 2022 |
446 |
Bentley Systems completes $700mn acquisition of Power Line Systems. |
Gavin Davids |
|
Feb 2, 2022 |
153 |
Lower House ratifies bicameral report for proposed Public Service Act. |
|
|
Feb 2, 2022 |
701 |
Kenya Power faulted for not collecting wind farm refund. |
|
|
Feb 1, 2022 |
699 |
Suswa power line: Ketraco in Sh13bn dilemma. |
|
|
Feb 1, 2022 |
1074 |
Bentley Systems buys Power Line Systems for $700m. |
|
|
Feb 1, 2022 |
212 |
Full Duplex High Speed Data Transmission Based on Partially Coupled Coils in Wireless Power Transmission Systems. |
Li, Jianxiong; Yang, Wenlong |
Report |
Feb 1, 2022 |
4821 |
Bentley Systems Closed Acquisition of Power Line Systems. |
|
|
Jan 31, 2022 |
199 |
Bentley Systems Closed Acquisition of Power Line Systems. |
|
|
Jan 31, 2022 |
176 |
'We have monopoly till 2032'. |
Nasir Jamal |
|
Jan 31, 2022 |
794 |
NTDC completes 133 km 2nd Phase of 500 kV Neelum Jhelum Transmission Line. |
|
|
Jan 31, 2022 |
238 |
Power sector entities: CPPA-G, LUMS join hands to achieve capacity-building goal. |
|
|
Jan 31, 2022 |
350 |
Launch date controversy puts transmission line at stake. |
|
|
Jan 29, 2022 |
548 |
Peter Murumba: Tackle scrap metal organised crime. |
|
|
Jan 28, 2022 |
847 |
Hitachi Energy wins ADNOC power transmission contract. |
Jason Saundalkar |
|
Jan 28, 2022 |
400 |
Hitachi Energy wins ADNOC power transmission contract. |
Jason Saundalkar |
|
Jan 28, 2022 |
383 |
Hitachi Energy wins UAE sub-sea power transmission contract. |
|
|
Jan 27, 2022 |
617 |
I'm no power line guard, says KPLC engineer. |
|
|
Jan 27, 2022 |
584 |
Makkah's $27bn project signs deal for power projects. |
Arab News |
|
Jan 23, 2022 |
305 |
Thieves steal transmission pylon bars from Kariba Power Station. |
|
|
Jan 22, 2022 |
355 |
Thieves steal transmission pylon bars from Kariba Power Station. |
|
|
Jan 22, 2022 |
353 |
DoE sees 'no specific concerns' yet on power supply during dry season. |
|
|
Jan 21, 2022 |
291 |
Turkmenistan finalizes routes for power transmission lines to Kabul, and Afghan-Pak border. |
|
|
Jan 21, 2022 |
1726 |
CM directs TESCO to strengthen transfusion system. |
|
|
Jan 20, 2022 |
260 |
KP CM directs TESCO for devising plans to strengthen transmission system. |
|
|
Jan 20, 2022 |
397 |
KP CM directs plans to strengthen overall power transmission system. |
|
|
Jan 20, 2022 |
396 |
KP CM directs TESCO to strengthen power system in merged dists. |
|
|
Jan 20, 2022 |
379 |
CM orders Tesco to upgrade power transmission system in ex-Fata. |
|
|
Jan 20, 2022 |
302 |
Optimization of Heterogeneous Clustering Routing Protocol for Internet of Things in Wireless Sensor Networks. |
Yang, Shun; Long, Xian'ai; Peng, Hao; Gao, Haibo |
|
Jan 19, 2022 |
5266 |
Techno-Economic Comparisons of HVAC and Simultaneous AC-DC Transmission. |
Asmare, Lijalem Dires; Gessesse, Belachew Bantyirga; Getie, Elias Mandefro |
|
Jan 17, 2022 |
7597 |
Transco to launch national off-grid system by August. |
|
|
Jan 17, 2022 |
431 |
NTDC completes 133 km 2nd Phase of 500 kV Neelum Jhelum Transmission Line. |
|
|
Jan 15, 2022 |
224 |
NTDC completes 133 km 2nd Phase of 500 kV Neelum Jhelum Transmission Line. |
|
|
Jan 15, 2022 |
215 |
Hammad Azhar vows to increase power transmission capacity to 30,000MW. |
|
|
Jan 15, 2022 |
366 |
APICORP, Islamic Development Bank partner in $1bn infrastructure financing initiative. |
Arab News |
|
Jan 12, 2022 |
181 |
SSNN-Based Energy Management Strategy in Grid Connected System for Load Scheduling and Load Sharing. |
Teekaraman, Yuvaraja; Kumar, K. A. Ramesh; Kuppusamy, Ramya; Thelkar, Amruth Ramesh |
Report |
Jan 10, 2022 |
4532 |
NTDC seeks 132kV transmission lines' handover to Hesco. |
|
|
Jan 9, 2022 |
670 |
Power sector employees equipped with vital knowledge. |
|
|
Jan 8, 2022 |
328 |
500 kV transmission line to cost Rs8.3 billion. |
|
|
Jan 6, 2022 |
270 |
Impact of Energy Price Distortion on Green TFP Based on Spatial Econometric Model. |
Guan, Huayu; Xing, Mengyue |
|
Jan 4, 2022 |
5740 |
Govt to invest Rs111bn in power transmission system: NA told. |
Haseeb Hanif |
|
Dec 31, 2021 |
349 |
Unsung heroes of Matiari-Lahore HVDC project boosts friendship. |
|
|
Dec 31, 2021 |
577 |
A Review of Data-Driven Short-Term Voltage Stability Assessment of Power Systems: Concept, Principle, and Challenges. |
Cao, Jiting; Zhang, Meng; Li, Yang |
Report |
Dec 30, 2021 |
10034 |
Fault Frequency Identification of Rolling Bearing Using Reinforced Ensemble Local Mean Decomposition. |
Qin, Bo; Luo, Quanyi; Zhang, Juanjuan; Li, Zixian; Qin, Yan |
|
Dec 29, 2021 |
5843 |
NGCP repairs 86% of Odette-hit hubs. |
|
|
Dec 28, 2021 |
349 |
Transmission infra: The missing link in Bangladesh's power play. |
|
|
Dec 27, 2021 |
618 |
Upper Egypt's energy control system project plays important role to achieve stable, efficient electricity distribution: JICA. |
Egypt Today staff |
|
Dec 27, 2021 |
520 |
Pipeline damage: Lagos residents to celebrate Christmas in darkness. |
|
|
Dec 24, 2021 |
425 |
Azerbaijan plans to expand power transmission lines in direction of Russia Azerenergy. |
|
|
Dec 23, 2021 |
321 |
Hitachi Energy wins Abu Dhabi project work contract. |
|
|
Dec 23, 2021 |
603 |
NTDC accelerates construction work of grid stations. |
|
|
Dec 20, 2021 |
336 |
NTDC accelerates construction work of grid stations. |
|
|
Dec 20, 2021 |
336 |
NTDC accelerates construction work of grid stations. |
|
|
Dec 20, 2021 |
336 |
NTDC accelerated construction work of grid stations. |
|
|
Dec 20, 2021 |
324 |
NGCP restores some transmission lines in Visayas, Mindanao affected by 'Odette'. |
|
|
Dec 19, 2021 |
777 |
WB approves $195m to improve electricity distribution, implement energy sector reforms. |
|
|
Dec 19, 2021 |
507 |
WB approves $195m to improve electricity distribution. |
|
|
Dec 19, 2021 |
159 |
PNM Closes USD 285m Acquisition of Western Spirit Transmission Line. |
|
|
Dec 14, 2021 |
266 |
PNM Closes USD 285m Acquisition of Western Spirit Transmission Line. |
|
|
Dec 14, 2021 |
291 |
Windpower: How energy chiefs paid billions for idle power. |
|
|
Dec 13, 2021 |
789 |
Baltics to Completely Disconnect From Russian Power Grid by 2025, Lithuanian Energy Minister Says. |
|
|
Dec 8, 2021 |
561 |
LATEST COMPANY NEWS. |
|
|
Dec 8, 2021 |
24690 |
Optimal Selection of the Cluster Head in Wireless Sensor Networks by Combining the Multiobjective Genetic Algorithm and the Gravitational Search Algorithm. |
Nabavi, Seyed Reza; Ostovari Moghadam, Vahid; Yahyaei Feriz Hendi, Mohammad; Ghasemi, Amirhossein |
|
Dec 7, 2021 |
8034 |
TCN upgrades Kaduna-Jos 330KV Transmission line to 1500MW - Spokesperson. |
|
|
Dec 7, 2021 |
425 |
Nowshera project matches clean energy plans. |
|
|
Dec 7, 2021 |
395 |
TCN Upgrades Kaduna -Jos 330kV Transmission Line To 1500MW. |
|
|
Dec 6, 2021 |
396 |
GRIDCo, ECG apologise to residents for erratic power supply in Kumasi. |
|
|
Dec 2, 2021 |
439 |
A Learning-based Power Control Scheme for Edge-based eHealth IoT Systems. |
Su, Haoru; Yuan, Xiaoming; Tang, Yujie; Tian, Rui; Sun, Enchang; Yan, Hairong |
Report |
Dec 1, 2021 |
5939 |
IIJA: Efforts to Address Electric Transmission for Reliability, Resilience, and Renewables. |
Campbell, Richard J. |
|
Dec 1, 2021 |
881 |
Govt to invest Rs 111 bln in transmission system in next 3-year. |
|
|
Nov 30, 2021 |
395 |
Govt to invest Rs 111 bln in transmission system in next 3-year. |
|
|
Nov 30, 2021 |
396 |
Govt to invest Rs 111 bln in transmission system in next 3-year. |
|
|
Nov 30, 2021 |
393 |
Egypt finalizing power transmission lines in Sinai to raise capacity of linkage with Jordan: Official. |
Egypt Today staff |
|
Nov 27, 2021 |
184 |
Rs18.188 bln released for NTDC|PEPCO projects so far. |
|
|
Nov 27, 2021 |
327 |
Rs18.188 bln released for NTDC/PEPCO projects so far. |
|
|
Nov 27, 2021 |
328 |
NTDC begins work on 113km transmission line. |
|
|
Nov 26, 2021 |
155 |
NTDC begins construction of 113 km 500 KV transmission line. |
|
|
Nov 25, 2021 |
243 |
NTDC begins construction of 113 Km long 500 KV transmission line. |
|
|
Nov 25, 2021 |
307 |
Belgrove Power to spend aSS3.8B for Rizal gas plant. |
|
|
Nov 22, 2021 |
598 |
Karamoja Sub-region gropes in the dark as electricity lies idle. |
|
|
Nov 18, 2021 |
572 |
Bentley buys power transmission sengineering group for $700m. |
|
|
Nov 17, 2021 |
600 |
NextEra Energy submits offshore wind transmission proposals under New York's clean energy goals. |
|
|
Nov 15, 2021 |
231 |
Hitachi to showcase carbon-neutral energy systems at Adipec. |
|
|
Nov 14, 2021 |
353 |
Investment of Rs111b to be made in power transmission system during next three years: NA informed. |
|
|
Nov 11, 2021 |
247 |
Rs 111b to be invested in power transmission system during next three years. |
|
|
Nov 11, 2021 |
256 |
Govt to invest Rs111b in power transmission system, NA told. |
|
|
Nov 11, 2021 |
356 |
Rs111bn to be invested in power transmission system Hammad. |
|
|
Nov 11, 2021 |
248 |
Rs111bn to be invested in power transmission system Hammad. |
|
|
Nov 10, 2021 |
245 |
SC junks writ vs high-voltage power lines in Makati village. |
|
|
Nov 2, 2021 |
789 |
Evolving Electric Power Systems and Cybersecurity. |
Campbell, Richard J. |
Report |
Nov 1, 2021 |
12689 |
Accurate Fault Location for Long-Distance Electric Transmission Lines. |
Zhao, Lihui; Zhu, Jingwei; Yang, Hongzhe; Qiao, Tianhuai |
Report |
Nov 1, 2021 |
4540 |
PM Inaugurates Mega Power Line. |
|
|
Oct 31, 2021 |
548 |
Pakistan's performance in terms of green energy is outstanding: Imtiaz Sheikh. |
|
|
Oct 28, 2021 |
310 |
Eskom transmission plan to add 30GW over the next decade. |
|
|
Oct 27, 2021 |
357 |
DISCOs invested Rs 365 bln in last five years: NA body told. |
|
|
Oct 26, 2021 |
424 |
NGCP allots P440-B investments for 211 projects. |
|
|
Oct 26, 2021 |
424 |
Hammad announces Rs111bn for revamping national grid. |
|
|
Oct 23, 2021 |
157 |
Hammad Azhar announces Rs111bn for revamping national grid. |
|
|
Oct 23, 2021 |
158 |
Rs18,188.384 mln released for NTDC/PEPCO projects in 1st quarter of FY-2021-22. |
|
|
Oct 19, 2021 |
333 |
House bill seeks amendment to electricity pilferage law. |
|
|
Oct 17, 2021 |
338 |
Optimal Placement of Wind Power Plants in Transmission Power Networks by Applying an Effectively Proposed Metaheuristic Algorithm. |
Duong, Minh Quan; Nguyen, Thang Trung; Nguyen, Thuan Thanh |
Report |
Oct 12, 2021 |
11879 |
Electricity generation witnesses 9,363.44 GWh increase in FY2020-21. |
|
|
Oct 8, 2021 |
249 |
Electricity generation witnesses 9,363.44 GWh increase in FY2020-21. |
|
|
Oct 8, 2021 |
249 |
Saudi-Egyptian electric connection contracts signed. |
|
|
Oct 6, 2021 |
331 |
Hitachi ABB Power Grids consortium awarded major contract. |
|
|
Oct 6, 2021 |
956 |
Report: Egypt to reap economic, political gains from interconnection electricity projects. |
Egypt Today staff |
|
Oct 5, 2021 |
588 |
Electricity line project will benefit landscape; Tower removals planned. |
KAIYA MARJORIBANKS |
|
Oct 1, 2021 |
497 |
CPEC's Matiari-Lahore power transmission line to cut losses from 17 to 4pc: PM. |
|
|
Oct 1, 2021 |
735 |
CPEC's Matiari-Lahore power transmission line to cut losses to 4pc: PM. |
|
|
Oct 1, 2021 |
732 |
CPEC Project: +-660 kV HVDC Matiari - Lahore Transmission Line Achieves Commercial Operation. |
|
|
Sep 30, 2021 |
389 |
Hydel power projects to cope with future energy, water challenges: official. |
|
|
Sep 30, 2021 |
594 |
First CPEC power transmission project gets under way. |
|
|
Sep 30, 2021 |
520 |
Nigeria Seeks $400 Billion to Build Electricity Generation, Transmission and Distribution Infrastructure. |
|
|
Sep 26, 2021 |
262 |
Reducing Fault Current by Using FACTS Devices to Improve Electrical Power Flow. |
Mehedi, Ibrahim M.; Al Hasan Joy, Jahin; Islam, Md. Rafiqul; Hasan, Nayeema; Al-Saggaf, Ubaid M.; Mi |
Report |
Sep 18, 2021 |
4621 |
Govt spends Rs49b to upgrade transmission lines. |
|
|
Sep 13, 2021 |
190 |
Firms get nod to conduct grid impact studies. |
|
|
Sep 13, 2021 |
322 |
Govt spends Rs 49 bln to upgrade transmission lines. |
|
|
Sep 11, 2021 |
190 |
Govt spends Rs 49 bln to upgrade transmission lines. |
|
|
Sep 11, 2021 |
189 |
Govt releases Rs18,188.384 million for NTDC|PEPCO projects. |
|
|
Sep 10, 2021 |
330 |
Govt releases Rs18,188.384 million for NTDC/PEPCO projects. |
|
|
Sep 10, 2021 |
331 |
ElSewedy Electric's subsidiary signs 2 contracts worth LE 1.15B with Egyptian Electricity Transmission Company. |
Egypt Today staff |
|
Sep 7, 2021 |
215 |
NGCP seeks approval for 11 projects. |
|
|
Sep 6, 2021 |
438 |
Siemens Energy to power mega Saudi housing project. |
|
|
Sep 5, 2021 |
363 |
Waseem has a 'little wish' to see a prosperous Pakistan. |
|
|
Sep 5, 2021 |
277 |
Fruits of CPEC. |
|
|
Sep 3, 2021 |
370 |
NamPower starts 287km transmission line. |
|
|
Sep 3, 2021 |
478 |
First CPEC power transmission project gets under way. |
|
|
Sep 2, 2021 |
563 |
+-660 kV HVDC Matiari - Lahore Transmission Line achieves COD successfully. |
|
|
Sep 2, 2021 |
391 |
+-660 kV HVDC Matiari - Lahore Transmission Line achieves COD successfully. |
|
|
Sep 2, 2021 |
391 |
Karachiites brave prolonged power breakdown as mercury surges to 40AdegC. |
|
|
Sep 2, 2021 |
639 |
Techno-economic Unified OPF Modeling for VSC-HVDC Converter Installation. |
Agrawal, Sunilkumar; Kundu, Prasanta |
|
Sep 1, 2021 |
7229 |
PSSE-Based Dynamic Simulation of Western Regional Grid of India. |
Gogoi, Kamaljyoti; Chatterjee, Saibal |
|
Sep 1, 2021 |
4490 |
NAMPOWER COMMENCES CONSTRUCTION OF 400 KV AUAS-GERUS TRANSMISSION LINE. |
Matthys, Donald |
|
Aug 31, 2021 |
360 |
Resolving Electricity Grid Collapse Conundrum In Nigeria. |
|
|
Aug 31, 2021 |
1248 |
NTDC to build a secure, sustainable energy. |
|
|
Aug 31, 2021 |
642 |
Electricity export to Afghanistan, Pakistan can be risen by 400 MW. |
|
|
Aug 31, 2021 |
443 |
Matiari-Lahore Transmission Line. |
|
|
Aug 31, 2021 |
247 |
Saudi Arabia invites EoIs for Rayis-Rabigh water transmission project. |
|
|
Aug 31, 2021 |
214 |
CONSTRUCTION BEGINS OF 400-KV POWER LINE BETWEEN BITOLA AND ELBASAN. |
|
|
Aug 30, 2021 |
269 |
Hurricane Ida lashes Louisiana, knocking out power in New Orleans. |
Reuters News Service |
|
Aug 30, 2021 |
994 |
Govt devises concrete strategy to ensure affordable energy for all by 2030. |
|
|
Aug 27, 2021 |
533 |
Banking alliance arranges syndicated loan of EGP 4bn for Electricity Transmission Company. |
Hossam Mounir |
|
Aug 23, 2021 |
376 |
Construction Of First Section Of Koshi Corridor Transmission Line Completes. |
|
|
Aug 17, 2021 |
434 |
High power testing of +-660kV HVDC Matiari-Lahore transmission line completed: NTDC. |
|
|
Aug 3, 2021 |
338 |
3000 MW Bi-pole High Power test on Matiari-Lahore Transmission Line completed successfully. |
|
|
Aug 3, 2021 |
351 |
High power testing of +-660kV HVDC Matiari-Lahore transmission line completed: NTDC. |
|
|
Aug 3, 2021 |
338 |
3000 MW Bi-pole High Power test on Matiari-Lahore Transmission Line completed successfully. |
|
|
Aug 3, 2021 |
349 |
Matiari-Lahore Transmission line test completed. |
|
|
Aug 3, 2021 |
332 |
Jumla Connected To National Transmission Line. |
|
|
Aug 2, 2021 |
297 |
Key grid project under CPEC termed a milestone. |
|
|
Jul 31, 2021 |
348 |
Govt disburses 100% funds allocated for water resources, NTDC, PEPCO projects under PSDP 2020-21. |
|
|
Jul 31, 2021 |
538 |
Govt fails to take power from Payra plant, counts huge loss in capacity payment. |
|
|
Jul 30, 2021 |
792 |
Xinhua Headlines: Clean energy galore powers China's quest for green future. |
|
|
Jul 26, 2021 |
894 |
L&T Construction wins several contracts for energy infrastructure. |
Jason Saundalkar |
|
Jul 25, 2021 |
192 |
L&T Construction wins several contracts for energy infrastructure. |
Jason Saundalkar |
|
Jul 25, 2021 |
174 |
AEP announces 445th consecutive dividend of USD0.74 per share for quarter. |
|
|
Jul 21, 2021 |
189 |
Govt disburses 100% funds allocated for water resources, NTDC, PEPCO projects under PSDP 2020-21. |
|
|
Jul 15, 2021 |
539 |
Govt disburses 100% funds allocated for water resources, NTDC, PEPCO projects under PSDP 2020-21. |
|
|
Jul 15, 2021 |
539 |
VMC allowed to build transmission line for 40-MW biomass-fired plant. |
|
|
Jul 15, 2021 |
387 |
NTDC secures Rs6.4bn loan for grid station, transmission lines' construction. |
|
|
Jul 14, 2021 |
410 |
TCN, World Bank Train 708 Electrical Engineers, Linesmen. |
|
|
Jul 13, 2021 |
452 |
Power transmission structure's up-gradation top priority: Hammad. |
|
|
Jul 13, 2021 |
250 |
Gov't ends unannounced electricity load shedding across country: Hammad Azhar. |
|
|
Jul 13, 2021 |
384 |
Gov't ends unannounced electricity load shedding across country: Hammad Azhar. |
|
|
Jul 13, 2021 |
384 |
Torkham-Nowshera power line to be laid by next year: NTDC. |
|
|
Jul 10, 2021 |
387 |
Faulty grids. |
|
|
Jul 10, 2021 |
330 |
Work on 500 kV transmission line to evacuate power from Sukki Kinari HPP starts. |
|
|
Jul 8, 2021 |
165 |
NTDC starts construction work of 500 kV transmission line for 870 MW Sukki Kinari HPP. |
|
|
Jul 8, 2021 |
159 |
Work on 500 kV transmission line to evacuate power from Sukki Kinari HPP starts. |
|
|
Jul 8, 2021 |
165 |
Mat'land power infrastructure rehab gets funding. |
|
|
Jul 2, 2021 |
772 |
Mixed-Modulation Method for Adjusting Frequency and Voltage in the WPT Systems with Misalignments and Load Variations. |
Wen, Dingdou; Zou, Yao; Li, Zhongqi; Yi, Jiliang |
Report |
Jul 1, 2021 |
6542 |
Tribal Energy Resource Agreements (TERAs): Approval Process and Selected Issues for Congress. |
Fitzpatrick, Tana |
|
Jul 1, 2021 |
15027 |
Green hydrogen development associated with offshore wind power, experts say. |
|
|
Jul 1, 2021 |
823 |
World Bank approves $380m project to support Uzbekistan's clean energy transition. |
|
|
Jun 30, 2021 |
569 |
M/s Energas, Tabeer Energy: Gas cos convey availability of LNG pipeline capacity for transmission, distribution. |
|
|
Jun 30, 2021 |
768 |
Matiari-Lahore transmission line to contribute to economic development in Pakistan: China. |
|
|
Jun 29, 2021 |
361 |
M-L transmission line to contribute to economic dev. |
|
|
Jun 29, 2021 |
272 |
Govt actively pursuing CPEC projects: Hammad Azhar. |
|
|
Jun 26, 2021 |
974 |
Government actively pursuing CPEC projects, says Hammad Azhar. |
|
|
Jun 26, 2021 |
770 |
CCI approves National Electricity Policy 2021. |
|
|
Jun 22, 2021 |
511 |
ERC begins audit of NGCP facilities. |
|
|
Jun 22, 2021 |
305 |
ERC starts virtual inspection of NGCP facilities. |
|
|
Jun 22, 2021 |
382 |
Day-ahead forecasting of losses in the distribution network. |
Dalai, Nisha; Molna, Martin; Herrem, Mette; Roen, Magne; Gundersen, Odd Erik |
Report |
Jun 22, 2021 |
8358 |
Gov't takeover of NGCP could be prone to corruption, Gatchalian warns. |
|
|
Jun 11, 2021 |
318 |
International Public Partnerships eyes Beatrice project close in July. |
|
|
Jun 10, 2021 |
235 |
Unfair charges threaten our net-zero goal. |
Campbell Gunn |
|
Jun 8, 2021 |
797 |
Unfair charges threaten our net zero goal. |
Campbell Gunn |
|
Jun 8, 2021 |
799 |
Pakistan's first HVDC transmission line passes testing. |
|
|
Jun 4, 2021 |
334 |
No transmission issue of electricity: NA body told. |
|
|
Jun 1, 2021 |
565 |
How NIPP Saved Nigeria's Power Sector. |
|
|
May 27, 2021 |
1194 |
Approval of ASPAs seen boosting power reserves of Mindanao. |
|
|
May 26, 2021 |
571 |
Expert Tasks NERC On $3.5bn NIPP, NDPHC Investments Recovery. |
|
|
May 26, 2021 |
885 |
Empowered Hybrid Parent Selection for Improving Network Lifetime, PDR, and Latency in Smart Grid. |
Srisomboon, Kanabadee; Dindam, Tinnaphob; Lee, Wilaiporn |
|
May 25, 2021 |
9745 |
Power breakdown hits most city areas as high-tension line trips. |
|
|
May 23, 2021 |
585 |
City suffers major power breakdown amid severe heat. |
|
|
May 23, 2021 |
589 |
NGCP tops performance targets in system operations. |
|
|
May 21, 2021 |
440 |
NGCP on track with US$1-B IPO plan. |
|
|
May 19, 2021 |
453 |