Printer Friendly

Browse American soldiers topic

Economic aspects subtopic

Articles

1-29 out of 29 article(s)
Title Author Type Date Words
US plan for military deployment costs worries Turkey. Mar 11, 2019 623
Providing/laying Water Supply G.i. And Pvc In Various Area Mc Patiala Est Cost Rs. 6.11 Lacs Dt 21/22.02.2019. Feb 8, 2019 160
MARTIAL LAW'S IMPACT ON EDUCATION IN THE TERRITORY OF HAWAI'I DURING WW II: Instilling Patriotism to the U.S. and Service to the Plantation Economy of Hawai'i. Beyer, Carl Kalani Jan 1, 2019 7264
Negotiations On Sharing Costs Of US Troops In Korea Next Week. Nov 9, 2018 619
Supply And Delivery Of 08 Meters Long G.i. Octagonal Pole With Double Arm Of 1500 Mm. At Economy Hotel Sector, Mini Holiday Home Sector And B-1 Sector Under Dsda. Oct 30, 2018 168
Supply, Installation, Testing And Connection Of 48 Watt Street Light Set, Havells-endura Ct Liner Or Equivalent Philips At 8 Mtr. Long G.i. Octagonal/g.r.p Pole At Economy Hotel Sector, Mini Holiday H. Oct 30, 2018 180
Construction Of Toe Wall With G.i. Interlocking Wire Mesh Jali Fencing Around The Park Near H. No. 1045, Sector-18, Rewari (including Three Years Mtc. And Defect Liability Period Free Of Cost) (re-cal. Aug 16, 2018 170
Construction Of Toe Wall With G.i. Interlocking Wire Mesh Jali Fencing Around The Park In Sector-1, Narnaul (including Three Years Mtc. And Defect Liability Period Free Of Cost) (re-call). Aug 16, 2018 167
South Korea is shouldering 73 percent of the cost for stationing U.S. troops here, a civic group claimed Tuesday, citing data from the governments of both nations. May 22, 2018 822
Providing And Fixing Of Rcc Pillar With G.i. Barbed Wire Fencing On 60m Wide Master Road Between Sector-101 And 104, Gurugram (including Three Years Mtc. And Defect Liability Period Free Of Cost) (re-called). Sep 2, 2017 118
Providing And Fixing Of Rcc Pillar With G.i. Barbed Wire Fencing On 60m Wide Master Road Between Sector-101 And 104, Gurugram (including Three Years Mtc. And Defect Liability Period Free Of Cost) (re-called). Aug 18, 2017 162
Providing Corrugated G.i. Sheet Roofing Fixed With G.i.j, Or L Hooks Bolts And Nuts 8 Mm Diameter With Bitumen And G.i. Limpet Washers Or With G.i. Limpet Washers Filled With White Lead And Including A Cost Of Approved Steel Primer And Two Cost Of Approve. Jul 13, 2017 209
Pathkhori H.p. Bilonda Biwan Sakras Gehbar Sadain Rojka Meoli Rough Cost Estimate For Commissioning Of 138 No. Existing Uncommissioning Tubewells( Estt. Cost Rs. 387.00 Lacs) Providing Fixing Of G.i. Pipe Submersible Cable Etc. And All Other Works Conting. Jul 12, 2017 143
Providing And Fixing Of Submersible Pump Set, Control Panel Board G.i. Pipe Submersible Cable And All Other Works Contingent Thereto( At Village Kherki) In Connection With Pathkhori Hp Bilonda Biwan Sakras Gehbar Sadain Rojka Meoli Rough Cost Estimate For. Jul 11, 2017 143
Providing And Fixing Of Rcc Pillar With G.i. Barbed Wire Fencing On 60m Wide Master Road Between Sector-101 And 104, Gurugram (including 3 Years Mtc. And Defect Liability Period Free Of Cost). Jun 20, 2017 102
Providing Laying And Jointing Of G.i. Pipe With Specials Such As Tee Bend Elbow Etc. Class Medium Including Testing Of Joints Cost Of Pipes All Complets Confirming To I.s.i 1239/2004 With Amendment Up To Date 1. 50 Mm-500 M 2. 80 Mm -150 M At Site Gaushal. Apr 4, 2017 180
Providing 4 Inch Dia D.i. And 2 Inch Dia G.i. Pipeline In Village Maroli, Banihari, Rambass And Lujota Shifted From Ddp Tehsil Narnaul, District Mohindergarh Estimated Cost Rs. 4.25 Lacs. Providing Laying, Jointing And Testing Of 2 Inch Dia 50 Mm Dia Gi C. Nov 7, 2016 165
Pathkhori, H.p. Bilonda, Biwan, Sakras, Gehbar, Sadain, Rojka, Meoli Rough Cost Estimate For Commissioning Of 138 No. Existing Uncommissioned Tubewell At Village Khor Kalan (providing Fixing Nrv Sluice Wall G.i. Pipe Etc. And All Other Works Contingent Th. Oct 29, 2016 134
Pathkhori, H.p. Bilonda, Biwan, Sakras, Gehbar, Sadain, Rojka, Meoli Rough Cost Estimate For Commissioning Of 138 No. Existing Uncommissioned Tubewell At Village Cheela (providing & Fixing Nrv Sluice Wall & G.i. Pipe Etc. And All Other Works Contingent Th. Oct 29, 2016 134
Pathkhori, H.p. Bilonda, Biwan, Sakras, Gehbar, Sadain, Rojka, Meoli Rough Cost Estimate For Commissioning Of 138 No. Existing Uncommissioned Tubewell At Village Cheela (providing Fixing Nrv Sluice Wall G.i. Pipe Etc. And All Other Works Contingent Theret. Oct 29, 2016 134
U.S. and Australia to share cost of Marines deployed in Darwin. Oct 7, 2016 458
Fish Seed farm Hariana, Block Bhunga, District Hoshiarpur. Construction of R.C.C Over Head Service Reservoir Hatcheries unit design fixating at site including cost of vertical pipes and G.I. pipe fitt. Jan 5, 2016 134
Japan agrees to new cost-sharing measures to host US troops. Dec 16, 2015 170
Olongapo folk hope US troops boost economy. Sep 20, 2015 457
Afghanistan,United States : AFGHANISTAN'S economic boom to go bust when US troops pull out in 2016. Jun 17, 2014 336
United Kingdom : Legal & General Investments expands index range into global inflation linked bonds. Aug 29, 2013 422
US troops boost local economy, says mayor. Sep 18, 2012 393
Our returning troops deserve financial literacy training. Lee, Steven J. Sep 1, 2012 1886
Taiwan's economic growth to decline to 4.5% in 2011: GI. Li, Judy Statistical data Oct 22, 2010 322

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters