Printer Friendly

Design documentation and technical specification of the workmanship and the acceptance of construction works.

Tenders are Invited for Design documentation and technical specification of the workmanship and the acceptance of construction works.

The execution of the project documentation and technical specifications for the implementation and Acceptance of construction works (STWiORB), together with cost estimation for investors to revitalize the House of John Paul II, 6, along with Nadine Gordimer and yard management (plot no 846/41).

Scope of work:

Execution of technical expertise along with the inventory needed for the implementation of the project documentation and STWIORB

-Project documentation: construction and implementing along with all sectors (architecture, construction, road, electrical wiring, fire alarm and detection system in this confinement, staircases, low power installations including TV and SAT, Internet access, central heating installations, plumbing, installation of mechanical ventilation and ventilation p. fire, heat supply node, solar) revitalize the House of John Paul II, along with Nadine Gordimer and yard management.

-Energy audit consistent with the requirements of the institutions of the dofinansowujacej project. The regional operational program of Silesia on the 2014-2020 (priority axis IV, action 4.3; website: rpo.slaskie.pl).

-The technical specifications of the implementation and acceptance of construction works

Investment Estimate and Przedmiar works.

The building at ul. John Paul II 6 in mikolEw is located in the in the register of historic monuments, when designing you must make arrangements with the Regional Office for the preservation of historical monuments in Katowice.

Project documentation to be drawn up on the basis of the attached concept developed by the arch. Wojciech Class (attached).

The contracting authority requires to design documentation and technical specifications of the implementation and acceptance of the works was carried out in 6 copies. in a paper version

and 1 copies. in the electronic version in PDF and DWG format.

The scope and form of studies included in the design documentation and technical specifications the implementation and acceptance of the works has been clarified in the regulation of the Minister of infrastructure of 2.9.2004 on detailed scope and forms of design documents, technical specifications and the reception of the works and the functionality is usable (i.e. OJ from 2013, poz. 1129).

The contractor in all studies may not indicate trademarks, patents or of origin, specifying the subject of the contract, unless this is justified by the specificity of the subject of the contract and cannot use a sufficiently accurate descriptions, and you point to is accompanied by words or equivalent and are shown the parameters functionality-utilities, which are used for the verification of the equivalence.

Time limit for receipt of tenders or requests to participate: 20.11.2015 - 1200

Conditions for opening tenders Date: 20.11.2015 - 13:00 City:

Language(s) in which te

Major organization : GMINA MIKOLEoW

Address : Rynek 16

43-190 MikolEw

For the attention of: Jerzy Adamik

Country :Poland

Email : zam@mikolow.eu

Url : www.mikolow.eu

Address : As in above point (s) (s) contact point (s)

Tender notice number : 357597-2015

Notice type : Tender Notice

Open date : 2015-11-20

Tender documents : T29807762.html

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).
COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Oct 10, 2015
Words:512
Previous Article:Execution Of The Project Documentation And Technical Specifications For The Implementation And Acceptance Of Construction Works.
Next Article:Long-term bank loan of eur 3 738 827.51 pln to finance the planned budget deficit in 2015 and to repay earlier loans.
Topics:

Terms of use | Copyright © 2017 Farlex, Inc. | Feedback | For webmasters