Printer Friendly

Consultation Number 2018-004 Preliminary Work On The Reception Of A Modular Building For The Montperrin Nursery.

Contract notice: consultation number 2018-004 preliminary work on the reception of a modular building for the montperrin nursery

Deadline for receipt of tenders: 08/03/2018 at 12:00

Award criteria:the most economically advantageous offer appreciated according to the criteria set out below

Lot lot n 1 benefit price 60% -

Batch lot 1 method and means allocated to the operation 30% -

Lot lot no. 1 turnaround time 10% -

Lot lot no 2 benefit prices 60% -

Batch lot 2 method and means allocated to the operation 30% -

Lot lot 2 execution time 10% -

Lot lot n 3 price of services 60% -

Batch lot 3 method and means allocated to the operation 30% -

Lot lot n 3 turnaround time 10% -

Lot lot no.4 benefit prices 60% -

Batch lot 4 method and means allocated to the operation 30% -

Lot no 4 execution time 10% -

Lot lot no 5 benefit prices 60% -

Batch lot 5 method and means allocated to the operation 30% -

Lot lot no. 5 turnaround time 10% -

Batch lot n 6 benefit price 60% -

Batch lot 6 method and means allocated to the operation 30% -

Lot lot # 6 turnaround time 10% -

Major organization : AP-HM POUR LE COMPTE DU CH MONTPERRIN.

Address : 109, Avenue De Petit Barthlmy Cedex 1 13617 Aix En Provence

Attn: Kachetel

Country :France

Email : marches-publics@ch-montperrin.fr

Url : http://www.ch-montperrin.fr

Tender notice number : 18-24869

Notice type : Tender Notice

Open date : 2018-03-08

Tender documents : T432415829.html

[c] 2018 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2018 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2018 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Feb 22, 2018
Words:254
Previous Article:Number Of The Consultation A18batctdemolbenie Deconstruction And Asbestos Removal Of A Prefabricated Building Within The School Complex Charles Bnier...
Next Article:Construction Works Of 14 Collective Housing - Rue Lon Blum In Bordeaux - Claveau Island 16.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters