Construction of the hydraulic circuit Mathias~s enterprise multiple purposes Alqueva.

Contract award: construction of the hydraulic circuit Mathias~s enterprise multiple purposes Alqueva.

Construction of the hydraulic circuit of San Matias, the lift system consisting of St. Matthias Stork reservoir, gravity dam and pipeline system of Almeidas with the following key features:

Mathias lift system, consisting of a scaled lift station to raise 4.5 m3/sa a lift height of 65 me for a pumping conduit tubing in concrete with steel core, DN 1800 mm, with a total development 1968 m and a maximum flow rate of about 7.2 sizing m3 / s.

Stork reservoir, built in excavation and embankment, with a height of 5 m, a perimeter of 582 Me A total storage capacity of 69,355 m3 and its impermeability guaranteed by the application of a geomembrane throughout its inner face.

Adductor gravitational system in tubing reinforced concrete with steel core DN 1800 mm (3540 m), DN 1600 mm (1652 m) and DN 1400 mm (1209 m).

Dam of Almeidas landfill with a maximum height of 8.40 m, a development of 474m and a capacity of 538 300 m3.

Date of contract award decision: 13.5.2014

Total final value of contract(s)Value: 13 105 619 EUR Excluding VAT

Contractor name : FERROVIAL AGROMAN,

Contractor address : SPAIN

Financier : European Union (EU)

Agency : EDIA Empresa de Desenvolvimento e Infraestruturas do Alqueva, SA

503450189

Rua Zeca Afonso 2

For the attention of: Pedro Aires

7800-522 Beja

PORTUGAL

E-mail: paires@edia.pt

Internet address(es):

General address of the contracting authority: http://www.edia.pt

country :Portugal

2014 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).
COPYRIGHT 2014 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2014 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:May 23, 2014
Words:270
Previous Article:Cyklotrasa RacibErz - Krzyzanowice - Cottbus along the Oder River and Alder.
Next Article:Modernization Sibyllenbad therapy center.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters