Printer Friendly

Construction Work, 2nd Construction Section.

Contract notice: Construction work, 2nd construction section.

The service list basically comprises the following services: Approx. 4 500 m 2 Remove the topsoil and reseal it, approx. 19 500 m 2 Remove the upper floor, put in rents, press again, approx. 750 pcs. Trees fall with rootstock mossing (dam OW IIIa), approx. 1 000 pcs. Of rootstocks, approx. 4 700 m Stream drainage Soil trays, discard, approx. 24 000 m 2 Watercourse attachment Side plates, discard, approx. 11 000 m 3 Load the bedding material below the stream attachment, charge, approx. 1 700 m 3 Remove the floor of the E1 / E1 * installation class *, store, reinstall, approx. 42 300 m 3 Floor of the E2 / E2 * installation class * remove, store, re-install, approx. 21 000 m 3 Removing, storing, re-installing, flooring of the installation class E3 / E3 *, approx. 1 000 m 3 Remove the floor of the E4 installation class, store, re-install, approx. 45 500 m 3 Intermediate ground level, approx. 3 300 t Hydraulic lime supply, Approx. 11 500 m 3 Supply of the floor class E1, installation in the groundwater / water bed, approx. 2 000 m 3 Improve soil, embankment area (dike gap closure), approx. 3 700 St. Installation of vertical drain pipes, length approx. 7 m (delta gap closure), approx. 3 850 m 3 Install the floor as a drainage material (dike gap closure), approx. 5 000 m 2 Laying of a geogrid reinforcement, approx. 25 500 m 3 Provide and install the floor as a sealing layer (dowel gap closure), approx. 6 500 m 3 Loosen the floor of the built-in class E 4, load (defacement), approx. 6 500 m 3 Provide and install the floor as a sealing layer (dewatering), approx. 3 000 m 3 Loosen the ground of the built-in class E 2, load (RRB 6.23), approx. 3 100 m 3 Unload, load (RRB 6.23) the floor of installation class E 5, approx. 6 100 m 3 Make the slope foot guard from HKS 0/45 (RRB 6.23), approx. 10 500 m 3 Use of soil / mixed mixes E2 / E2 * (excess soil), approx. 11 000 m 3 Soil mixtures E2 / E2 * to E 4 (bedding material), Approx. 14 000 m 3 Soil mixtures E 4, highly organic, approx. 12 500 m 3 Soil mixtures E 5, highly organic, approx. 15 000 tons of soil / mixed mixtures DK I and DK II to the tipper of the AG, tipping, approx. 10 500 to ground / mixed mixtures DK III (hazardous waste) to the tipper of the operator, tipping over.

This contract is divided into lots: no

Time-limit for receipt of tenders or requests to participate: Date 11/05/2017

Local time 1100

IV.2.3) Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4) Languages in which tenders or requests may be submitted

English dictionary

Section VI Complementary information

VI.5) Date of dispatch of this notice

06/04/2017

Major organization : EMSCHERGENOSSENSCHAFT

Address : Kronprinzenstrae 24

Essen

45128

Contact person: Herr Rller

Country :Germany

Email : rueller.franz-josef@eglv.de

Tender notice number : 133988-2017

Notice type : Tender Notice

Open date : 2017-05-11

Tender documents : T38886949.html

[c] 2017 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Apr 13, 2017
Words:541
Previous Article:Demolition And Pollutant Refurbishment.
Next Article:Sewage Treatment Plant - Energy Management Expansion 2030 - New Construction Energy Center.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters