Printer Friendly

Construction / ventilation and air conditioning.

Contract notice: Construction / ventilation and air conditioning.

KKE 42 RaumlufttechnikDas trade Raumlufttechnik consists of: 2 units air handling ventilation system (supply and exhaust air unit 13 500 per mA / h) with highly efficient heat recovery in the circulation system including hydraulic module with piping, 2 piece central air handling unit (supply and exhaust air unit 26 500 per mA / h) highly efficient heat recovery in the circulation system including hydraulic module with piping, 1 piece central air handling unit (supply and exhaust air unit 9600 mA / h) with heat recovery in the circulation system including hydraulic module with piping, 1 piece central air-handling unit (supply and exhaust air unit 10 000 mA / h) with heat recovery (air-side plate heat exchanger), 5 pieces MSR system for the regulation of KVS recovery, 1 piece MSR system for regulating the temperature in 4 laboratories (highly accurate temperature control + / - 0.1 K), 59 pieces CRAC units (3500 per mA / h) 12 pcs filter fan units (1 200 x 1 200 mm), 1 piece radial fan (180 mA / h), 1 piece radial fan (1000 mA / h), 1 piece radial fan (1 500 mA / h) , 1 piece radial fan (2 500 mA / h), set of 4 radial fan (2 500 mA / h), PPs, 1 piece of centrifugal fan (90 mA / h), explosion-proof, 3 piece flat centrifugal fan (35 mA / h, 8 single room ventilators, moisture controlled, 1 piece smoke extract roof fan 20 000 mA / h, 1 piece smoke extract roof fan 7400 mA / h, 12 500 mA duct galv. steel plate, including fitting proportion, 625 mA ventilation duct, PPs, including . fitting proportion, 320 mA ventilation duct, stainless steel, incl fitting portion 320 mA ventilation duct, stainless steel grease-proof, including fitting proportion, 2500 m vent line round, galvanized steel, DN80 -. DN 355450 m vent line around, PPs, DN63 - DN 450 575 mA smoke extraction duct, silicate boards including fitting proportion, 760 mA smoke extraction duct, galv. steel plate, including fitting proportion, 510 pieces fire dampers (round and square), 15 pieces Dampers, 40 piece air duct heater, 440 pcs constant volume flow controller, galv. Sheet steel, 40 pcs constant volume flow controller, PPs, 85 pieces Variable volume flow controller, electric galv. Sheet steel, 110 pieces shut, blind and butterfly valves, 410 piece silencer, round, 115 pieces duct silencers, 425 Plate valves, 190 pieces DrallluftauslEnsse, 320 piece grille 1 050 m of textile outlets DN 2502 000 mA insulation in air lines including fitting proportion, 250 mA Fire protective clothing, ventilation duct.

Time limit for receipt of requests for documents or for accessing documents: 27.9.2013 - 10:00

Language(s) in which tenders or requests to participate may be drawn up:

German.

Tender documents : T17937577.html

2013 Al Bawaba (Albawaba.com)

Provided by Syndigate.info an Albawaba.com company
COPYRIGHT 2013 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2013 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Aug 31, 2013
Words:462
Previous Article:Construction / heating / refrigeration.
Next Article:Light in erlangen, new construction insulation fire protection.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters