Contract notice: central sewer & pipeline treated wastewater municipality of tinos (n0300a)[beaucoup plus grand que]

Basic design of the project is the construction of the main sewer (dsa) to the position of wwtp total length of approximately 1900m, with nominal diameters of 280, 315 and 355 mm, the construction of four new pumping stations and pipeline transport treated wastewater (amel) , approximately 2.270m and a nominal diameter of 280 mm, and the storage charge of submarine pipeline. the project includes work earthworks, concrete structures, carpentry, metal, pipe structures and networks and electromechanical works.

the total project budget without revision and vat 1 330 000eur and the work is composed of ts following job categories: hydraulic with budget 820 036.77 and 509 963.23 electrical with (without revision and vat).

This contract is divided into lots: no

Estimated value excluding VAT: 1 370 000 EUR

Deposits and Guarantees required: - A guarantee of participation in the auction amount 26 600 EUR and valid for at least 6 months and 30 days from the date of tender.

-For the signing of the contract, performance guarantees amounting to 66 500 EUR

If the average discount rate (Em) offered in the tender the Contractor exceeds the legal limit of A* 4 of Article 35 of N.3669 / 0, must submit to the signing of the contract further additional performance guarantee in accordance with the provisions of paragraph 2 of Article 35 of Law 3669/2008 (RPS), the amount of which can reach 22% of the budget.

- Securing the work "all-risk".

Time limit for receipt of requests for documents or for accessing documents: 23.4.2014 - 16:00

Time limit for receipt of tenders or requests to participate: 29.4.2014 - 1000

Conditions for opening tenders Date: 29/04/2014 - 10:00

Language(s) in which tenders or requests to participate may be drawn up: Greek.

Tender documents : T21406348.html

2014 Al Bawaba (Albawaba.com) Provided by Syndigate.info , an Albawaba.com company
COPYRIGHT 2014 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2014 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Mar 14, 2014
Words:328
Previous Article:Development of definitive studies of suburban street.
Next Article:Setting processing plant and subsea pipeline distribution wastewater.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters