Printer Friendly

Building an ambulance: ambulance manufacturing is as much about design, engineering and technology as it is durability and functionality.

Braun Industries in Van Wert, OH, (www.braunambulanees.com) manufactures up to 350 ambulances each year for some of the largest municipal fleets in the country, including Chicago, Boston and Miami-Dade. Since the needs of each fire department and non-municipal customer differ, the company's applications engineering department must pay careful attention identifying the equipment and layout needed to fulfill customer requirements--down to the location of oxygen outlets, auxiliary control panels and cabinetry--a process that requires working with more than 600 medical and safety equipment suppliers. Once the details have been nailed down, the design engineering group uses SolidWorks (www.solidworks.com) software to develop 3D CAD files outlining the exact number of pieces needed--anywhere from 300 to more than 900-to build the box that is fitted on the back of the cab. Concurrently, electrical engineers verify the equipment selected by the customer will work within Braun's peer-to-peer multiplex electrical architecture.

[ILLUSTRATION OMITTED]

Once the design has been approved, the fabrication department converts the SolidWorks files onto SigmaNest (www.sigmanest.com), which automatically optimizes the layout of parts on each of the 8- and 12-ft. sheets of 1/8-in. thick marine-grade aluminum, reducing waste and improving efficiency. The parts are cut with a plasma torch, Trumpf punch or Komo router, then brake formed; it takes an average of 4 hours to cut as many as 80 sheets of parts for each box. The use of SigmaNest also allows Braun to store detailed specifications for each truck in a database for reference in case replacement parts need to be fabricated on short notice. All of the pieces are sent to the welding shop where they are spot welded together by hand, completing the basic box assembly. Then it moves onto paint. The box moves to final assembly, where lean manufacturing principles are followed. The 110,000 [ft.sup.2] assembly hall is arranged by "value streams": chassis prep, fabrication and quality. The combined chassis and box--now called an "ambulance"-travel through the assembly process via a "work center" arrangement, defined as specific areas of assembly, such as electrical or upholstery. Parts are kitted by truck number and delivered line-side for each of the work centers; there are up to five work centers per assembly station. Once the kitted parts are placed on the truck, the ambulance is moved to the next station, where another work center is completed. The entire build process, from the first cut of aluminum to the final quality check, takes up to 35 days, with cost ranging from $85,000 to $350,000.

by Kevin M. Kelly

* SENIOR EDITOR
COPYRIGHT 2009 Gardner Publications, Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2009 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:FEATURE
Author:Kelly, Kevin M.
Publication:Automotive Design & Production
Date:Apr 1, 2009
Words:431
Previous Article:Aero-style machining coming to auto: as the auto industry turns to materials that are certainly more exotic than the cast iron and aluminum that are...
Next Article:2010 Prius the not-so-little car that can: the first-generation Prius went on sale in the U.S. in 2000. The second-gen appeared in October 2003. Now...
Topics:


Related Articles
Extra cash will provide more care home beds; Health authorities get pounds 49m boost.
Drive: MG is first in the race to rescue.
Multi-million pound deal for local firm.
SAIC AWARDED A MORE THAN $97 MILLION ARMY ORDER FOR VACIS SYSTEMS.
Satnavs will help quicken 999 calls; Minister is determined to cut times.
Injured pensioner thanks neighbours; Widower left in agony with spine injury.
Dubai unveils longest ambulance in the world.
999 delays are very distressing.

Terms of use | Privacy policy | Copyright © 2022 Farlex, Inc. | Feedback | For webmasters |