Printer Friendly

Blida Tramway.

Scope of work:

Construction of Blida Tramway.

Description:

The Blida tramway feasibility study entrusted to the group Bureauxd'etudes Algerian - French EGISRAIL - DAR TOTAL SOLUTION allowed dedefinir variant of the first tramway line in Blida consists of primary and two secondary ALine shaped sections depouvoir fork to serve the densest neighborhoods in order demieux meet growing demand movement stand in the wilaya of Blida and the best use of the performance of laligne structuring Tramway.

The main line connects the university 2, in the village of Ouled Yaich, the Drioueche cited in downtown Blida. The first secondary section connects the sports complex mustaphatchaker at the bus station in the town of Ben Mokadem. The second secondary section connects the square of freedom in hopitalfranz dewlap through the bus station.

Line 1 of the Tramway Blida extends over a length of 18.9 km with 27stations and 5 interchanges, other features have been revealed lorsde the study as:

The average distance Inter station: 731 meters

The course time: 43.7 minutes

The commercial speed: 21.4 km / h

The Crossover frequency of trains: 5 minutes

The operation of this line will be with oars 39 with a capacity of 330personnes and each having a length of 45 meters and 2.65 meters delargeur. Transportation forecasts by tram on this line are estimated parl'etude to 162,000 passengers per day in the medium term and 174 long-term 000voyageurs, sized to 3600.

The line Blida tram would connect the city of Soumaa hospital Frantz Fanon On an overall length of over 10 km, this new means of transport will reduce the pressure on the main roads of the city, especially in terms of fluidity of traffic.

Project completion date : 2018-12-31 12:00:00

Major organization : ENTREPRISE DE METRO D ALGER (EMA)

Address : 170 B, rue Hassiba Ben Bouali Street, Algiers

Country :Algeria

Url : www.metroalger-dz.com

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Oct 5, 2015
Words:325
Previous Article:Desarrollo articulado de mecanismos y redes de protecciEn para las y los defensores de derechos humanos en la frontera sur de Mexico (Articulated...
Next Article:Tram Line Linking Santa Ana Regional Transportation Center.
Topics:

Terms of use | Privacy policy | Copyright © 2018 Farlex, Inc. | Feedback | For webmasters