Printer Friendly

B 111, Ou Wolgast Building 05 And 4 Frame Structures.

Contract notice: b 111, ou wolgast building 05 and 4 frame structures

The contract includes the following engineering services: for building 05, bridge over the peenestrom: object planning for engineering structures according to 43 hoai lph. 3 and 6; special planning of structural design according to 51 hoai lph. 3; special services. for 4 frame structures: object planning for engineering structures according to 43 hoai lph. 1, 2, 3 and 6; special planning of structural design according to 51 hoai lph. 2 and 3. the subject of the planned construction project is the new construction of the federal highway 111 as a southern bypass of the city of wolgast. the planned new line begins in the area of the western border of wolgast, crosses the peenestrom with the sauziner bay and ends on usedom east of the district mahlzow. for the crossing of the federal highway 111 over the peenestrom at wolgast is planned to build a new bridge structure. the new construction of the bridge is part of the federal highway project neubau the b111 bypass wolgast. the planned bridge construction transfers the b 111 bypass wolgast over the peenestrom. the bridge route runs along the northern edge of the wolgaster sdhafen, crosses the peenestrom in a sweeping section (the crossing angle with the existing fairway is about 54 gon), touches the shore area of the peninsula "alte schanze" and crosses the sauziner bay before the island usedom is achieved. the total span is 1,465 m. the peenestrom is located in the bridge area west of the federal waterway, the access to the wolgast southern harbor. on the mainland side, three city streets are bridged with bahnhofstrasse, lotsenstrae and kapitnsweg, which open up the harbor area. another bridged traffic route is the single-track, operated by the usedomer bderbahn (ubb) railway line zssow-wolgast-ahlbeck. furthermore, an industrial track no longer in operation runs alongside the pilot road. structural data bauwerk 05, bridge over the peenestrom: asb no. internal construction designation (bw no.) bw 05. structure name bridge over the peenestrom. total length 1,465 m. width between railing 13,60 m. lane width 10.00 m. bridge area 19,924 m 2 . clear height 42.00 m above sea level. mw. additionally 4 frame structures in reinforced concrete or composite construction with spans from 11 m to 38 m.

This contract is divided into lots: no

Time limit for receipt of tenders or requests to participate: date: 06/02/2018

Local time: 12:00

Major organization : DEGES DEUTSCHE EINHEIT FERNSTRAENPLANUNGS- UND -BAU GMBH

Address : Zimmerstrae 54

Berlin

10117

Contact Person: Deges Deutsche Einheit Fernstraenplanungs- Und -Bau Gmbh

Country :Germany

Email : vergabe@deges.de

Url : http://www.deges.de

Tender notice number : 523370-2017

Notice type : Tender Notice

Open date : 2018-02-06

Tender documents : T431105722.html

[c] 2017 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Dec 28, 2017
Words:476
Previous Article:Rrx-a Dortmund-kurl, Construction.
Next Article:A44 Route 3. Ba With Tunnel Boyneburg And Bw.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters