Printer Friendly

Asr (aquifer storage and recovery) temporary facilities for cycle test 5.

Request for Bid: Asr (aquifer storage and recovery) temporary facilities for cycle test 5

The City of North Port is requesting sealed bids to secure the services of an experienced, professional, licensed, and qualified Contractor capable of providing construction services in accordance with the specification and drawings for the installation of temporary facilities at the Citys Aquifer Storage and Recovery (ASR) well for the performance of planned Cycle Test 5. The Citys ASR well is located at the Citys Myakkahatchee Creek Water Treatment Plant (MCWTP) on North Port Boulevard. The temporary facilities include, but are not limited to, provision and installation of 4-inch and 8-inch HDPE piping, 6-inch schedule 80 PVC piping, concrete pad, aluminum canopy, filtration system; and, chemical feed systems for sodium hypochlorite (NaClO), hydrochloric acid (HCl), and Sodium Hydrosulfide (NaHS). Work also includes, but is not limited to, connection to existing piping from the MCWTP raw surface water intake structure; connection to existing piping to/from ASR well; and, connections to existing ASR discharge line and existing plant drain system. In addition, a portable booster pump supplied by the City is also to be installed within the work. The work of this Contract does not include performance of Cycle Test 5.

Major organization : CITY OF NORTH PORT

Address : 4970 City Hall Boulevard,

Suite 337,

North Port,

Fl. 34286

Attn: Alla Skipper

Contract Specialist

Country :United States

Tender notice number : RFB-2016-33-0-2016/AS

Notice type : Tender Notice

Open date : 2016-01-25

Tender documents : T31283692.html

[c] 2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Dec 30, 2015
Words:258
Previous Article:Inspection & laboratory testing services.
Next Article:Compliance Testing - Rice Neshap Oconomowoc Wastewater Treatment Facility.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters