Printer Friendly

Area 51 Pipelines Contract For The Fgp-wpmp Project.

Contract Awarded for the Area 51 Pipelines contract for the FGP-WPMP project, which will create a new gathering system for transporting the fluids of Tengiz and Korolev reservoir to the new FGP processing facilities.

Contract awarded: January 2018

Bonattis scope of work includes the construction and precommissioning of about 377 km of various diameters pipelines:

- Production gathering system.

- High pressure sour gas injection and utilities (water, fuel gas, diesel).

The contract signing ceremony took place on 30 November in Atyrau with participation of Tengizchevroil Projects General Manager, Kevin Kassner, FGP-WPMP Project Director, Mick Kraly, as well as Bonatti Chairman of the Board, Paolo Ghirelli and MontazhSpetsStroy JSC President, Talgat Nazarov.

During the signing ceremony Ghirelli conveyed the following: Kazakhstani content development is one of the highest priorities for our client Tengizchevroil. Bonatti supports Tengizchevroils goal to achieve maximum use of the countrys resources. I am pleased that our partner in this contract is a Kazakhstani company MontazhSpetsStroy, which has been on Kazakhstans market since 1994. The work to be executed as part this contract is a key element on the path to achieve our commitment to the Republic of Kazakhstan.

Being located in an operational field, the activities will be executed in particularly challenging conditions such as brownfield and characterised by an elevated number of crossings, which is estimated in about 3800 between pipelines, buried cables, areal cables, roads and SOE areas.

Contractor name : BONATTI

Contractor address : Via Nobel, 2/A

43122 Parma

P.O. Box 352 Parma

Implementing agency : TENGIZCHEVROIL (TCO) 060011 Atyrau,

3 Satpayev Street,Kazakhstan email : tcoinfo@tengizchevroil.com tel : 7 712 227 1212 / +7 712 302 6000 fax : +7 712 302 6752

Country :Italy

Email : bonattispa@pec.bonatti-group.com

Url : http://www.bonattinternational.com

[c] 2018 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2018 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2018 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Feb 13, 2018
Words:301
Previous Article:Supply A Gas Pipeline Management And Control System.
Next Article:56468052-yellow Aspect Main Led Signal, 110v Ac, Retrofittable In Existing Cls Housing And Compatible With Ac Led Ecr As Per Rdso Specn No....
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters