Printer Friendly

Ancillary works for pipelines and cables.

Contract award: ppnh, baunatal, service building, material handling

Pressure piping outside buildings (DIN 18 307), Excavation (DIN 18300);

72 St sinking boreholes soil class 1-5, depth 10-15 m, d = 500 mm

72 St supply and introduction of spiral geothermal probes

6 pcs plastic distribution boxes d = 1200 mm

6 St manifold set for 12 heating circuits

280 m plastic piping system for underground 63/5, 8 mm to 90/8, 2 mm

600 m connection cable probes / distributor with insulation

1 Psch Delivering build, hold, reduce crusher

Record 350 mA Double-T patch

Break 115 mA of concrete ceiling, d = 30 cm

125 mA breaking asphalt inclusion 10 - 20 cm

Loosen 1100 mA ground, disconnect, record, promote, invite

Perform 400 mA of soil, non-polluting, recovery

350 mA of excavated soil carry away and dispose of Z 1.1

200 mA of excavated soil carry away and dispose of Z 1.2

T containing 200 jet carry away and dispose of fasteners

Making of 1200 mA Planum

Contractor name : SPEZIALTIEFBAU FREuMERT GMBH

Contractor address : DammstraE-e 44-46

33824 Werther

Agency : Hessisches Baumanagement Regionalniederlassung Nord Vergabebereich Fulda

Schillerstr. 8

Contact point(s): Vergabebereich Fulda

36043 Fulda

GERMANY

E-mail: info.vergabe-fd@hbm.hessen.de

Fax: +49 6616005306

country :Germany

2013 Al Bawaba (Albawaba.com)

Provided by Syndigate.info an Albawaba.com company
COPYRIGHT 2013 Al Bawaba (Middle East) Ltd.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2013 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:May 29, 2013
Words:217
Previous Article:Supply and delivery of 2 units hp proliant 350ml hard drive.
Next Article:Refuse and waste related services.

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters