Printer Friendly

Anacostia Initial Line.

Location : Washington DC

Miles : 1.1

Description : The Anacostia Initial Line Segment is a 1.1-mile planned streetcar line connecting the Anacostia Metro Station with the Joint Base Anacostia-Bolling (JBAB), via Firth Sterling Avenue and South Capitol Street. The line includes a storage yard and maintenance facility adjacent to South Capitol Street.

Construction is currently underway on the Testing and Commissioning Site that will be housed on this line and is expected to conclude in Summer 2013. The Testing and Commissioning Site will serve as a critical piece of infrastructure for the operation of DC Streetcar service. Vehicles will be tested at this site in advance of their testing and operation on H/Benning and future corridors.

Project completion date : 2016-12-31 12:00:00

Major organization : DC STREETCAR

Address : Washington, DC

Country :United States

Email : info@dcstreetcar.com

Url : http://www.dcstreetcar.com/

2015 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2015 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2015 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jul 1, 2015
Words:155
Previous Article:ISIGrowth: Innovation-fuelled, Sustainable, Inclusive Growth.
Next Article:Re.Cri.Re.: Between the representation of the crisis and the crisis of representation. How crisis changed the symbolic background of European...

Terms of use | Copyright © 2017 Farlex, Inc. | Feedback | For webmasters