A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling.

1. Introduction

As a part of production scheduling and combinatorial optimization problems, job-shop scheduling problem (JSP) attracts more and more researchers from all walks of life (e.g., mechanical engineering, mathematics, and computer software engineering) in the recent decades [1-5].

Flexible job-shop scheduling problem (FJSP) inherits the characteristics of the JSP, in which each operation is allowed to be processed by any machine in a given set rather than one specified machine, and it has been proved that the FJSP is strong NP-hard [6]. FJSP consists of two subproblems: one is the routing subproblem that each operation is assigned to one machine of a set of machines, and the other is the scheduling subproblem that a feasible schedule is obtained by sequencing the assigned operations on all machines. Therefore the FJSP is more difficult to be solved than the classical JSP because of its need to determine the assignment of operations in related machines [7].

The FJSP is firstly addressed by Brucker and Schlie [8]. And they presented a polynomial algorithm with only two jobs and identical machines. Brandimarte [9] proposed a hybrid tabu search (TS) algorithm which was based on decomposition to solve the FJSP. Dauzere-Peres and Paulli [10] provided a TS algorithm which was based on the integrated approach and developed a new neighbourhood function [11] for the FJSP in terms of solution quality and computation time. Gao et al. [12] proposed a hybrid genetic algorithm to solve the FJSP with nonfixed availability constraints. And in order to enhance the inheritability, this genetic algorithm uses an innovative representation method and applies genetic operations to phenotype space. Saidi-Mehrabad and Fattahi [13] developed aTS algorithm that took the operation sequences and sequence-dependent setups into consideration to solve the FJSP. A genetic algorithm (GA) combined with a variable neighbourhood search (VNS) was presented by Gao et al. [14], and a GA with different strategies was proposed by Pezzella et al. [15]. Yazdani etal. [16] developed a parallel VNS algorithm based on the application of multiple independent searches which increased the exploration of search space. Xing et al. [17] put forth a knowledge-based ant colony optimization algorithm. Recently, a novel artificial bee colony (ABC) algorithm [18] and a discrete harmony search (DHS) algorithm [19] were brought forward to solve the FJSP.

As is shown above, the single-objective optimization of FJSP (SO-FJSP) has been extensively studied, which generally minimizes the makespan that is the time required to complete all jobs. However, many industries (e.g., aircraft, semiconductors manufacturing, and electronics) have trade-offs in their scheduling problems in which multiple objectives need to be considered to optimize the overall performance of the system. Therefore, the MO-FJSP maybe closer to the realistic production environments and needs to be further studied. In recent years, the MO-FJSP has captured more and more interests of numerous domain researchers, and a great many of algorithms have been presented [20]. Compared with SOFJSP, MO-FJSP has two problems to be dealt with: incommensurability between objectives and contradiction between objectives (i.e., optimizing a single-objective generally results in deterioration of another objective) [13].

For the MO-FJSP, Schaffer [21] provided a genetic algorithm with vector evaluated. Jurisch [22] presented a branch-and-bound algorithm and some heuristic algorithms. By combining the VNS with particle swarm optimization (PSO), Liu et al. [23] presented a hybrid metaheuristic to solve the MO-FJSP. A new genetic algorithm (GA) which hybridized with a bottleneck shifting procedure was developed by Gao et al. [24] to solve the MO-FJSP. Zhangetal. [25] embedded tabu search (TS) inPSO as a local search to deal with the MO-FJSP. Xing et al. [26] advanced an efficient search method for the MO-FJSP. Gonzalez-Rodriguez et al. [27] proposed a generic multiobjective model which was based on lexicographical minimization of expected values for FJSP. By introducing several metrics of the multiobjective evaluation in the MO-FJSP literature, Rahmati et al. [28] adopted two multiobjective evolutionary algorithms for the MO-FJSP.

Recently, some studies based on the Pareto dominance relation have been used to solve the MO-FJSP and they are more desirable when compared with the prior linear weighted summation ones [29]. The nondominated sorting genetic algorithm (NSGA) [30] was one of the first methods used to solve the multiobjective problem. Kacem et al. [31] brought up a Pareto approach based on the hybridization of fuzzy logic (FL) and evolutionary algorithms to solve the MO-FJSP. Ho and Tay [32] integrated a guiding local search procedure and an elitism memory mechanism into the evolutionary algorithm to solve the MO-FJSP.

Deb et al. [33] came up with a nondominated sorting-based multiobjective evolutionary algorithm (MOEA), called nondominated sorting genetic algorithm II (NSGA-II). Wang et al. [34] proposed a multiobjective GA based on immune and entropy principle for the MO-FJSP. By employing simulated annealing (SA) algorithm as a local search process, Frutos et al. [35] introduced a memetic algorithm (MA) based on the NSGA-II. Wang et al. [36] presented an effective Pareto-based estimation of distribution algorithm (P-EDA), in which various strategies are integrated to maintain quality and diversity of solutions. Rohaninejad et al. [37] advanced an MO-FJSP problem with machines capacity constraints to minimize the makespan and overtime costs of machines. Kaplanoglu [38] put forth an object-oriented (OO) approach combined with SA optimization algorithm to solve the MOFJSP, in which a two-string encoding scheme was used to express this problem.

Our review of the above literatures reveals that the NSGA-II algorithm has been widely used to solve the MO-FJSP for its advantages such as high efficiency to optimize the complex problems and the ability to gain widespread Pareto-optimal solutions. And the algorithms with a two-stage optimization scheme have been also widely studied to solve the MOFJSP for it could fully tap the optimization potentials of various metaheuristic algorithms. However, we found that the NSGA-II algorithm has the disadvantage of premature convergence to local solution and the algorithms with a two-stage optimization scheme have the disadvantages of being unable to gain stable and high quality initial population in the first stage. Hence, in this paper, we propose a bee evolutionary guiding NSGA-II (BEG-NSGA-II) with a two-stage optimization scheme to solve the MO-FJSP, which aims to fully play the respective advantages of NSGA-II algorithm and the algorithms with a two-stage optimization scheme and to overcome the disadvantages of them. In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N which consists of three parts changing with the iteration times. In order to extensively exploit the solution space, an effective local search operator is invented in this stage. In the second stage, the NSGA-II algorithm with GEN iteration times is used to obtain the Pareto-optimal solutions. In order to enhance the searching ability and avoid the premature convergence, an updating mechanism and some useful genetic operators were employed in this stage. Four famous benchmarks that include 53 open problems of FJSP are chosen to estimate the performance of the proposed algorithm. Moreover, by comparing the results of our algorithm and some existing well-known algorithms, the virtues of our algorithm can be clearly demonstrated.

The rest of this paper is organized as follows. The definition and formalization of the MO-FJSP are given in the next section. In Section 3, NSGA-II is briefly introduced, and then the overview and implementation details of the proposed BEG-NSGA-II are presented, respectively. Afterwards, Experimental Studies and Discussions are made in Section 4. Finally, Conclusions and Future Studies are described in Section 5.

2. Problem Definition

The FJSP is commonly defined as follows. There is a set of n jobs ([J.sub.i], i [member of] {1,2,..., n}) and a set of m machines ([M.sub.k], k [member of] {1, 2, ..., m}). One or more operation(s) ([O.sub.ij], j [member of] {1, 2, ..., [n.sub.i]}, [n.sub.i] is the total number of operations for job [J.sub.i]) is/are allowed to be processed by one machine of [M.sub.ij], which consists of a set of machines of the jth operations for job [J.sub.i]. [P.sub.ijk] denotes the processing time of the jth operation for job [J.sub.i], which is processed by machine k. Generally, the FJSP consists of two subproblems: the routing subproblem of assigning each operation to a machine among a set of machines available and the scheduling subproblem of sequencing the assigned operations on all machines to obtain a feasible schedule for optimizing a certain objective function [39, 40].

One classical 4x5 FJSP is shown in Table 1. In this paper, we aim to minimize the following three objectives:

(i) Maximal completion time of machines (makespan).

(ii) Workload of the most loaded machine (MW).

(iii) Total workload of all machines (TW).

Some assumptions are put forward:

(i) Each operation cannot be interrupted during processing.

(ii) Each machine can process at most one operation at any time.

(iii) One operation cannot be processed by more than one machine simultaneously.

(iv) Moving time between operations and setting up time of machines are negligible.

(v) Machines are independent of each other.

(vi) Jobs are independent of each other.

The notations used in the definition of multiobjective FJSP in this paper are shown in Notations [25].

The mathematical model could be given as follows [25]:

Objective functions:

[mathematical expression not reproducible] (1)

Subject to: [C.sub.ij] - [C.sub.i(j-i)] [greater than or equal to] [P.sub.ijk][x.sub.ijk], j = 2, ..., [n.sub.i]; [for all]i, j (2)

[mathematical expression not reproducible] (3)

[summation over (k [member of] [M.sub.ij])] [v.sub.ijk] = 1 (4)

[mathematical expression not reproducible] (5)

Equation (1) indicates the three optimizing objectives. Inequality (2) ensures the operation precedence constraint. Inequality (3) ensures that each machine processes only one operation at each time. Equation (4) states that one machine can be selected from the set of available machines for each operation [25]. According to whether machine k is selected to process step [O.sub.ij] or not, equation (5) is used to determine the value of [x.sub.ijk].

3. The Proposed Algorithm

3.1. Brief Introduction of NSGA-II. The nondominated sorting genetic algorithm II (NSGA-II) is a population-based multiobjective evolutionary algorithm, which is widely used in the optimization of multiobjective problems. The core procedure of NSGA-II can be briefly formulated as follows. First, using [P.sub.t] and [U.sub.t] presents the current parent and offspring population, respectively. The sizes of [P.sub.t] and [U.sub.t] are both N. Then a new population [R.sub.t] = [P.sub.t] U [U.sub.t] (of size 2N) is formed by combining [P.sub.t] with [U.sub.t]. Furthermore, an operator called nondominated sorting is executed, which defines [R.sub.t] as different nondominated levels (rankl, rank2, etc.), to choose the best N members as the new population named [P.sub.t+1] for the next generation. In NSGA-II, the crowding distance is computed by a special operator, and then the solutions with larger crowding distance values are selected. More details of the NSGA-II could refer to [33].

3.2. The BEG-NSGA-II

3.2.1. Framework. In this paper, a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) with a two-stage optimization scheme is proposed for the FJSP, in which a bee evolutionary guiding scheme is presented that focus on the exploitation of solution space, and some mechanisms are used to enhance the searching ability and avoid the premature convergence. Its framework is shown in Figure 1. More details of steps are described as follows.

The First Stage

Step 1. Generate N individuals as the initial population randomly, and set t = 1.

Step 2. Calculate the fitness value of individuals based on objective 1, objective 2, and objective 3; then select the best fitness individuals as the queen 1, queen 2, and queen 3 correspondingly; if t > 1, compare the fitness value of the parent queens and offspring queens, and select the best ones as the new queens correspondingly.

Step 3. Use roulette wheel method to select P individuals according to the fitness value of objective 1, objective 2, and objective 3.

Step 4. Randomly generate R individuals, and combine these individuals with the P individuals generated from Step 3, respectively.

Step 5. The new queens selected from Step 2 take crossover and mutation with other corresponding individuals generated from Step 4 to produce the offspring population 1, offspring population 2, and offspring population 3, respectively.

Step 6. Combine the three offspring populations into a combining population.

Step 7. Fast nondominated sorting and congestion computing.

Step 8. Select the top N individuals as the offspring population.

Step 9. Set t = t + 1; if t > T, continue next step; otherwise return Step 2, and the population is replaced by the selected N individuals.

The Second Stage

Step 10. Select S top individuals (from the top N individuals) as the elite individuals.

Step 11. Use a binary tournament selection method to select cross individuals from offspring population (i.e., the selected N individuals); if D(i, j) > u, use a precedence operation crossover; otherwise, use job-based crossover.

Step 12. If [P.sub.m] <= 0.1 and if offspring rank = 1, then choose swapping mutation; else, choose two binding mutation or reverse mutation; else, the population does not take mutation.

Step 13. Randomly generate R' new individuals.

Step 14. Combine the three-part individuals which get from Steps 10, 12, and 13.

Step 15. Use Step 7 to deal with the combining population to generate offspring population.

Step 16. If t > GEN, output the result; otherwise, t = t + 1, and return Step 10.

The parameters used in this algorithm are defined as follows:

At the first stage,

[mathematical expression not reproducible], (6)

At the second stage,

[alpha]' = t/GEN, (7)

R' = N(1 - [alpha]')/2, (8)

[chi]' + S + 0.5N >= N (9)

D(i, j) = [L.summation over (l=1)] [absolute value of min [max[0, [absolute value of [a.sub.il] - [a.sub.jl]]] - 1,0]] / L, (10)

D (i, j) [less than or equal to] u, Precedence operation crossover D (i, j) > u, Job-based crossover. (11)

In (6)-(9), where N is the number of individuals in the initial population, t is the current iteration, T is the iteration times in the first stage, and GEN is the iteration times in the second stage. Equation (9) ensures that there are enough numbers of individuals to be selected in the following offspring, and we set the value of S as 0.3 x N. Equation (10) is a difference degree function which is used to compute the similarity between chromosome i and chromosome j (the two chromosomes that will be crossed), where L is the length of a chromosome and aa denotes the Ith gene in chromosome i. In (11), u is a parameter set as 0.7. The chromosomes tend to select the multipoint preservative crossover with the decrease of u.

3.2.2. Chromosome Encoding and Decoding. In this paper, we use the encoding method presented by Gao et al. [12]. The FJSP problem includes two subproblems: one is operation sequence part and the other is machine assignment part. Chromosome that corresponds to the solution of the FJSP also consists of two parts. The first one is the operation sequence vector and the second one is the machine assignment vector. Two different encoding methods are used to generate the two vectors.

In terms of the operation sequence vector, the operation-based representation method is used, which is composed of the jobs' numbers. This representation uses an array of uninterrupted integers from 1 to n, where n is the total number of jobs, and each integer appears Oni times, where Oni is the total number of operations of job i; therefore, the length of the initial operation sequence population is equal to [[summation].sup.n.sub.i=1] Oni. By scanning the operation sequence from left to right, the mth occurrence of a job number expresses the mth operation of this job. The operation sequence vector of every initial individual of population is generated with the randomly encoding principle. By using these representation features, any permutation of the operation sequence vector can be decoded to a feasible solution.

The machine assignment vector indicates the selected machines that are assigned to the corresponding operations for all jobs. It contains n parts, and the length of ith part is Oni, hence the length of this vector also equals [[summation].sup.n.sub.i=1] Oni. The ith part of this vector expresses the machine assignment set of ith job. Supposing a machine set [S.sub.ih] = {[m.sub.ih1], [m.sub.ih2], ..., [m.sub.ihcih]} can be selected to process the hth operation of job i, a gen set {[g.sub.i1], [g.sub.i2], ..., [g.sub.ih], ..., [g.sub.iOni]} denotes the ith part of machine assignment vector, and [g.sub.ih] is an integer between 1 and [C.sub.ih], and this means that the hth operation of job i is processed by the [g.sub.ih] machine [m.sub.ihgih] from [S.sub.ih]. The machine assignment vector of every initial individual of population is generated by selecting the available machine randomly for each operation of every job. An example is shown in Figure 2(a), and the operation and machine sequence are shown in it as follows: ([O.sub.31], [M.sub.1]), ([O.sub.11], [M.sub.4]), ([O.sub.21], [M.sub.2]), ([O.sub.32], [M.sub.1]), ([O.sub.12], [M.sub.3]), ([O.sub.22], [M.sub.4]), ([O.sub.41], [M.sub.2]), ([O.sub.33], [M.sub.3]), ([O.sub.42], [M.sub.5]), ([O.sub.13], [M.sub.5]), ([O.sub.34], [M.sub.4]), and ([O.sub.23], [M.sub.5]); then we can get the value of objectives of the work by referring to Table 1.

When the chromosome representation is decoded, each operation starts as soon as possible following the precedence and machine constraints [31]. A schedule generated by using this decoding method can be ensured to be active schedule [40]. The procedure of decoding is implemented as follows.

Step 1. Identify the machine of all operations based on the machine assignment vector.

Step 2. Identify the set of machines used to process every job.

Step 3. Identify the set of operations for every machine.

Step 4. Determine the allowable starting time of every operation. [AS.sub.ij] = [C.sub.i(j-1)], where [AS.sub.ij] denotes the allowable starting time of operation [O.sub.ij], and [C.sub.i(j-1)] is the completion time of operation [O.sub.i(j-1)] for the same job.

Step 5. Calculate the idle time of the machine of operation [O.sub.ij], and get the idle areas [t_start, t_end], where t_start is the start time of these idle areas and t_end is the end time of these idle areas. Scanning these areas from left to right, if max ([AS.sub.ij], t_start) + [t.sub.ijk] < t_end, the earliest starting time is [S.sub.ij] = t_start; else [S.sub.ij] = max([AS.sub.ij], [C.sub.i(j-1)]).

Step 6. Calculate the completion time of every operation. [C.sub.ij] = [S.sub.ij] + [t.sub.ijk].

Step 7. Generate the sets of starting time and completion time for every operation of every job.

By using the above procedure, a feasible schedule for the FJSP is obtained. Figure 2 shows the examples of encoding and decoding methods, and the processing time and machine date of jobs can be seen from Table 1. This example contains 4 jobs and 5 machines. Job 1 and job 2 both have 3 operations; job 3 and job 4 contains 4 and 2 operations, respectively. Figure 2(a) shows a chromosome which contains two parts: the operation sequence vector and the machine assignment vector. The operation sequence vector is an unpartitioned permutation with repetitions of job numbers. It contains three 1s, three 2s, four 3s, and two 4s, because there are 4 jobs: job 1 contains 3 operations, job 2 contains 3 operations, job 3 contains 4 operations, and job 4 contains 2 operations. Its length is 12. The machine assignment vector consists of 4 parts because of 4 jobs. Its length is also 12. Each part presents the machines selected for the corresponding operations of job. For example, the first part contains 3 numbers which are 4, 3, and 5. Number 4 means that machine 4 is selected for operation 1 of job 1, number 3 means machine 3 is selected for operation 2 of job 1, and number 5 means machine 5 is selected for operation 3 of job 1. A Gantt chart of a schedule based on the chromosome in Figure 2(a) is shown in Figure 2(b).

3.2.3. Crossover Operators. In this paper, the proposed algorithm contains two optimization stages. In order to expand the searching space and avoid premature of local optimal solutions, we use different crossover operators in these two stages.

At the first stage, a single-point crossover (SPX) or multipoint crossover (MPX) operator is selected randomly (50%) for the operation sequence vector, and a two-point crossover (TPX) operator is selected for the machine assignment vector.

The procedure of SPX is described as follows ([P.sub.1] and [P.sub.2] are used to denote two parents; [O.sub.1] and [O.sub.2] are used to denote two offspring).

Step 1. A random parameter k that meets the inequality 0 < k < P (the length of operation sequence vector) is generated to determine the position of the crossover.

Step 2. The elements from 1 to k in [P.sub.1] are duplicated to [O.sub.1] in the same positions; and the elements from 1 to k in [P.sub.2] are duplicated to [O.sub.2] in the same positions.

Step 3. Calculate the total number of each element (in this example, the total number of 1, 2, 3, and 4 is three, three, four, and two, resp.).

Step 4. The elements in [P.sub.2] are appended to the remaining empty positions in [O.sub.1] from left to right until the total number of each element in [O.sub.1] equals each one in [P.sub.1]. The elements in [P.sub.1] are appended to the remaining empty positions in [O.sub.2] from left to right until the total number of each element in [O.sub.2] equals each one in [P.sub.2].

The procedure of MPX is described as follows ([P.sub.1] and [P.sub.2] are used to denote two parents; [O.sub.1] and [O.sub.2] are used to denote two offspring).

Step 1. Two random parameters [k.sub.1] and [k.sub.2] that meet the inequality 0 <[k.sub.1] < [k.sub.2] < Pas well as [k.sub.1] [not equal to] [k.sub.2] are generated to determine the positions of crossover.

Step 2. The elements from [k.sub.1] to [k.sub.2] in [P.sub.1] are appended to the leftmost positions of [O.sub.1]; and the elements from [k.sub.1] to [k.sub.2] in [P.sub.2] are appended to the leftmost positions of [O.sub.2].

Step 3. Calculate the total number of each element (in this example, the total number of 1,2,3, and 4 is three, three, four, and two, resp.).

Step 4. The elements in [P.sub.2] are appended to the remaining empty positions in [O.sub.1] from left to right until the total number of each element in [O.sub.1] equals each one in [P.sub.1]. The elements in [P.sub.1] are appended to the remaining empty positions in [O.sub.2] from left to right until the total number of each element in [O.sub.2] equals each one in [P.sub.2].

The examples of SPX and MPX are, respectively, shown in Figures 3 and 4.

For the machine assignment vector, a two-point crossover (TPX) has been adopted here as the crossover operator. The procedure of it is described as follows ([P.sub.1] and [P.sub.2] are used to denote two parents; [O.sub.1] and [O.sub.2] are used to denote two offspring).

Step 1. Two random parameters [k.sub.1] and [k.sub.2] that meet the inequality 0 <[k.sub.1] < [k.sub.2] < P as well as [k.sub.1] [not equal to] [k.sub.2] are generated to determine the positions of crossover.

Step 2. Append the elements between [k.sub.1] and [k.sub.2] positions in [P.sub.2] to the same positions in [O.sub.1], append the elements before [k.sub.1] and after [k.sub.2] positions in [P.sub.1] to the same positions in [O.sub.1], and use the same process to generate [O.sub.2].

Based on the above procedure, we can obtain feasible offspring if the parents are feasible. An example of TPX crossover is shown in Figure 5.

At the second stage, a precedence operation crossover (POX) or job-based crossover (JBX), which is determined by equation (11), is selected for operation sequence vector and the TPX is also selected for machine assignment vector.

The main procedure of POX is described as follows ([P.sub.1] and [P.sub.2] are used to denote two parents; [O.sub.1] and [O.sub.2] are used to denote two offspring).

Step 1. The Job set is randomly divided into two subsets: Jobsetl and Jobset2.

Step 2. The element(s) which belong(s) to Jobsetl in [P.sub.1] is (are) appended to the same position(s) in [O.sub.1] and deleted in [P.sub.1]; and the element(s) which belong(s) to Jobset2 in [P.sub.2] is (are) appended to the same positions in [O.sub.2] and deleted in [P.sub.2].

Step 3. Append the elements remaining in [P.sub.1] to the remaining empty positions in [O.sub.2] from left to right; and append the elements remaining in [P.sub.2] to the remaining empty positions in [O.sub.1] from left to right.

The main procedure of JBX is described as follows ([P.sub.1] and [P.sub.2] are used to denote two parents; [O.sub.1] and [O.sub.2] are used to denote two offspring).

Step 1. The Job set is randomly divided into two subsets: Jobsetl and Jobset2.

Step 2. The element(s) which belong(s) to Jobsetl in [P.sub.1] is (are) appended to the same position(s) in [O.sub.1]; and the element(s) which belong(s) to Jobset2 in [P.sub.2] is (are) appended to the same positions in [O.sub.2].

Step 3. The element(s) which belong(s) to Jobset2 in [P.sub.2] is (are) appended to the remained empty positions in [O.sub.1] from left to right; and the element(s) which belong(s) to Jobsetl in [P.sub.1] is (are) appended to the remained empty positions in [O.sub.2] from left to right.

The examples of POX and JBX are, respectively, shown in Figures 6 and 7.

3.2.4. Mutation Operators. In this paper, we have adopted different mutation operators at two stages for purpose of expanding the solution space as well as maintaining the good solutions.

At the first stage, a swapping mutation or reverse mutation operator is selected randomly (50%) with probability pm (set as 0.1 in our algorithm) for operation sequence vector. And a multipoint mutation (MPM) operator is selected for machine assignment vector.

The main procedure of swapping mutation operator is described as follows ([P.sub.1] and [O.sub.1] are used to denote a parent and offspring, resp.).

Step l. Randomly select two positions in [P.sub.1].

Step 2. Swap the elements in the selected positions to generate [O.sub.1].

The main procedure of reverse mutation operator is described as follows ([P.sub.1] and [O.sub.1] are used to denote a parent and offspring, resp.).

Step l. Randomly select two positions in [P.sub.1].

Step 2. Reverse the numbers between the selected two positions to generate [O.sub.1].

The main procedure of MPM operator is described as follows ([P.sub.1] and [O.sub.1] are used to denote a parent and offspring, resp.).

Step 1. Randomly select k positions in [P.sub.1] (k equals the half of the length of the machine assignment vector).

Step 2. Change the value of these selected positions according to their optional machine sets selected for process the corresponding operations.

At the second stage, if the individual is at the forefront of Pareto, it will select the swapping mutation; otherwise choose the two binding mutation (TBM) or reverse mutation for operation sequence vector. The MPM operator is also selected for the machine assignment vector.

The main procedure of TBM is described as follows ([P.sub.1] and [O.sub.1] are used to denote a parent and offspring, resp.).

Step 1. A random parameter m (m < the length of the operation sequence vector subtract 3) is generated in [P.sub.1].

Step 2. Exchange the elements m with m + 3 and m +1 with m + 2 in [P.sub.1] to generate [O.sub.1].

The examples of swapping mutation operator, reverse mutation operator, TBM operator, and MPM operator are, respectively, shown in Figures 8, 9,10, and 11.

4. Experimental Studies and Discussions

The proposed BEG-NSGA-II algorithm was coded in MATLAB R2014a and implemented on a computer configured with Intel Core i3 CPU with 2.67 GHz frequency and 4 GB RAM. Four famous benchmarks that include 53 open problems of FJSP are chosen to estimate the proposed algorithm, which were also used by many researchers to evaluate their approaches. In order to illustrate the performance of the proposed algorithm, we compare our algorithm with other state-of-the-art reported ones. The computational time used to solve these benchmarks is also compared to show the good efficiency of the proposed method. Because the computation time and implementing performance are not only affected by the algorithm itself but also affected by the computer hardware, implementing software, and coding skills, we also append the information of hardware and software, as well as the original computational time with the corresponding algorithms. All experimental simulations were run 20 times, respectively, for each problem of these benchmarks. The adopted parameters of the BEG-NSGA-II are listed in Table 2.

4.1. Experiment 1. The data of Experiment 1 are taken from Kacem et al. [31]. It contains 4 representative instances (problem 4 x 5, problem 8 x 8, problem 10 x 10, and problem 15 x 10). The experimental results and comparisons with other well-known algorithms are shown in Table 3 (n x m means that the problem includes n jobs and m machines; [f.sub.1], [f.sub.2], and [f.sub.3] mean the optimization objectives of makespan, MW, and TW, resp. T means the average computer-independent CPU times in minute spent on each problem of these benchmarks; the symbol "--" means the time has not been given in the paper). BEG-NSGA-II denotes the proposed algorithm. The results of AL which are taken from Kacem et al. [31], PSO + SA which are taken from Xia and Wu [41], hGA which are taken from Gao et al. [24], MOGA which are taken from Wang et al. [34], hPSO which are taken from Shao et al. [42], and OO approaches which are taken from Kaplanoglu [38] are used to make comparison with the proposed algorithm. The bolded results are the new Pareto-optimal solutions found in our algorithms.

For the problem 4 x 5, the proposed BEG-NSGA-II algorithm obtains not only all best solutions in these compared algorithms, but also another new Pareto-optimal solution ([f.sub.1] = 13, [f.sub.2] = 7, and [f.sub.3] = 33). The Gantt chart of this new Pareto solution is shown in Figure 12. For the problems 8 x 8, 10 x 10, and 15 x 10, the proposed algorithm gets more Pareto-optimal solutions than other listed algorithms but hPSO, and although it obtains the same results with hPSO, it seems to consume less computation time than the hPSO does.

4.2. Experiment 2. The data of Experiment 2 are taken from Dauzere-Peres and Paulli [10]. It contains 18 problems. The experimental results and comparisons with other well-known algorithms are shown in Table 4 (n x m means that the problem includes n jobs and m machines, [f.sub.1], [f.sub.2], and [f.sub.3] mean the optimization objectives of makespan, MW, and TW, resp. T means the average computer-independent CPU times in minute spent on each problem of these benchmarks). BEG-NSGA-II denotes the proposed algorithm. The results of MOGA are adopted from Wang et al. [34]. The bolded results are the new Pareto-optimal solutions found in our algorithms. From Table 4, except the problem 01a, we can see that our algorithm can obtain some new Pareto-optimal solutions which are better for objectives [f.sub.2] or [f.sub.3], or both of them, but a little worse for the objective [f.sub.1]. For the problem 01a, our algorithm gets the same solutions as MOGA. For all problems, our algorithm consumes less computational time than MOGA. Figure 13 illustrates the Gantt chart of the problem 18a ([f.sub.1] = 2,634, [f.sub.2] = 2,156, and [f.sub.3] = 21,005).

4.3. Experiment 3. The data of Experiment 3 are taken from Brandimarte [9]. It contains 10 problems. The experimental results and comparisons with other well-known algorithms are shown in Table 5 (n x m means that the problem includes n jobs and m machines, [f.sub.1], [f.sub.2], and [f.sub.3] mean the optimization objectives of makespan, MW, and TW, resp. T means the average computer-independent CPU times in minute spent on each problem of these benchmarks). BEG-NSGA-II denotes the proposed algorithm. The results of SM and MOGA are adopted from [26, 34]. The bolded results are the new Pareto-optimal solutions found in our algorithms. From Table 5, we can see that our algorithm can obtain some new Pareto-optimal solutions in problems MK01, MK04, MK05, MK08, and MK10 compared with SM and MOGA and the same solutions in MK2, MK3, MK6, MK7, and MK9 as MOGA. For all problems, our algorithm consumes less computational time than MOGA. Figure 14 illustrates the Gantt chart of the problem MK08 ([f.sub.1] = 541, [f.sub.2] = 533, and [f.sub.3] = 2,516).

4.4. Experiment 4. The data of Experiment 4 are taken from Barnes and Chambers [43]. It contains 21 problems. The experimental results and comparisons with other well-known algorithms are shown in Table 6 (n x m means that the problem includes n jobs and m machines, [f.sub.1], [f.sub.2], and [f.sub.3] mean the optimization objectives of makespan, MW, and TW, resp. T means the average computer-independent CPU times in minute spent on each problem of these benchmarks). BEG-NSGA-II denotes the proposed algorithm. The results ofHGTS and HA are adopted from [44, 45], and there are no other multiobjective optimization algorithms to compare for these problems in the up to date literatures. The bolded results are the new multiobjective optimization solution found in our algorithms. From Table 6, we can see that our algorithm can solve these problems with little worse objective [f.sub.1] but simultaneously get the other two objectives [f.sub.2] and [f.sub.3] with less computation time. Figure 15 illustrates the Gantt chart of the problem seti5xyz ([f.sub.1] = 1270, [f.sub.2] = 835, and [f.sub.3] = 11,472).

4.5. Discussions. From the simulation results of test examples 1-3, we can see that our proposed BEG-NSGA-II could obtain the same or more different Pareto-optimal solutions for the most benchmarks of MFJSP with less computation time. That means more schemes can be chosen by the production managers when they make scheduling decisions with high efficiency. From the simulation results of test example 4, we can see that our proposed algorithm of BEG-NSGA-II works better in multiobjective optimization as well as single-objective optimization.

5. Conclusions and Future Studies

In this paper, in order to fully play the respective advantages of nondominated sorting genetic algorithm II (NSGA-II) algorithm and the algorithms with a two-stage optimization scheme and to overcome the disadvantages of them, we developed a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) for solving the multiobjective flexible job-shop scheduling problem with the optimization objectives of minimizing the maximal completion time, the workload of the most loaded machine, and the total workload of all machines. A two-stage optimization mechanism is constructed in the optimization process. In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N which consists of three parts changing with the iteration times. In this stage, an effective local search operator is invented to extensively exploit the solution space. In the second stage, the NSGAII algorithm with GEN iteration times is used to obtain the Pareto-optimal solutions, in which an updating mechanism and some useful genetic operators were employed to enhance the searching ability and avoid the premature convergence. From the simulation results, we can get the conclusions that our proposed algorithm BEG-NSGA-II could obtain more different Pareto-optimal solutions for most benchmarks of MO-FJSP with less computation time. Hence, it could provide more schemes for the production managers to choose when they make scheduling decisions. This proposed computational intelligence method (BEG-NSGA-II) could be widely used in flexible job-shop scheduling problems, especially the multiobjective optimization problems in scheduling filed.

In the future, we will concentrate on the dynamic and real-time scheduling problems which possibly include newly inserted jobs during the production process. Meanwhile, the redistribution of job operations and machine breakdowns may also be taken into consideration.
Notations

n:             Total number of jobs
m:             Total number of machines
[n.sub.i]:    Total number of operations of job i
[O.sub.ij]:    The jth operation of job i
[M.sub.ij]:    The set of available machines for the operation
[P.sub.ijk]:   Processing time of [O.sub.ij] on machine k
[t.sub.ijk]:   Starting time of operation [O.sub.ij] on machine k
[C.sub.ij]:    Completion time of the operation [O.sub.ij]
i, h:          Index of jobs, i,h= 1,2, ..., n
k:           Index of machines, k = 1,2 ..., m
j, g:          Index of operation sequence, j, g = 1, 2 ..., [n.sub.i]
[C.sub.k]:     The completion time of [M.sub.k]
[W.sub.k]:     The workload of [M.sub.k].


https://doi.org/10.1155/2017/5232518

Conflicts of Interest

The authors declare that they have no conflicts of interest.

Acknowledgments

This work was supported by the National Natural Science Foundation of China (Grant no. 71473077); National High Technology Research and Development Program of China (863 Program) (Grant no. 2013AA040206); National Key Technology R&D Program of China (2015BAF01B00).

References

[1] J. Blazewicz, W. Domschke, and E. Pesch, "The job shop scheduling problem: conventional and new solution techniques," European Journal of Operational Research, vol. 93, no. 1, pp. 1-33, 1996.

[2] E. Perez, M. Posada, and F. Herrera, "Analysis of new niching genetic algorithms for finding multiple solutions in the job shop scheduling," Journal of Intelligent Manufacturing, vol. 23, no. 3, pp. 341-356, 2012.

[3] X. Qiu and H. Y. K. Lau, "An AlS-based hybrid algorithm for static job shop scheduling problem," Journal of Intelligent Manufacturing, vol. 25, no. 3, pp. 489-503, 2014.

[4] L. Asadzadeh, "A local search genetic algorithm for the job shop scheduling problem with intelligent agents," Computers and Industrial Engineering, vol. 85, article no. 4004, pp. 376-383, 2015.

[5] W.-Y. Ku and J. C. Beck, "Mixed Integer Programming models for job shop scheduling: a computational analysis," Computers and Operations Research, vol. 73, pp. 165-173, 2016.

[6] M. R. Garey, D. S. Johnson, and R. Sethi, "The complexity of flowshop and job-shop scheduling," Mathematics of Operations Research, vol. 1, no. 2, pp. 117-129, 1976.

[7] S. Wang, L. Wang, Y. Xu, and M. Liu, "An effective estimation of distribution algorithm for the flexible job-shop scheduling problem with fuzzy processing time," International Journal of Production Research, vol. 51, no. 12, pp. 3778-3793, 2013.

[8] P. Brucker and R. Schlie, "Job-shop scheduling with multipurpose machines," Computing, vol. 45, no. 4, pp. 369-375, 1990.

[9] P. Brandimarte, "Routing and scheduling in a flexible job shop by tabu search," Annals of Operations Research, vol. 41, no. 3, pp. 157-183, 1993.

[10] S. Dauzere-Peres and J. Paulli, "An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search," Annals of Operations Research, vol. 70, no. 1, pp. 281-306, 1997.

[11] M. Mastrolilli and L. M. Gambardella, "Effective neighbourhood functions for the flexible job shop problem," Journal of Scheduling, vol. 3, no. 1, pp. 3-20, 2000.

[12] J. Gao, M. Gen, and L. Sun, "Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm," Journal of Intelligent Manufacturing, vol. 17, no. 4, pp. 493-507, 2006.

[13] M. Saidi-Mehrabad and P. Fattahi, "Flexiblejob shop scheduling with tabu search algorithms," The International Journal of Advanced Manufacturing Technology, vol. 32, no. 5-6, pp. 563-570, 2007.

[14] L. Gao, C. Y. Peng, C. Zhou, and P. G. Li, "Solving flexible job shop scheduling problem using general particle swarm optimization," in Proceedings of the 36th CIE Conference on Computers & Industrial Engineering, pp. 3018-3027, Taipei, Taiwan, 2006.

[15] F. Pezzella, G. Morganti, and G. Ciaschetti, "A genetic algorithm for the flexible job-shop scheduling problem," Computers & Operations Research, vol. 35, no. 10, pp. 3202-3212, 2008.

[16] M. Yazdani, M. Amiri, and M. Zandieh, "Flexible job-shop scheduling with parallel variable neighborhood search algorithm," Expert Systems with Applications, vol. 37, no. 1, pp. 678-687, 2010.

[17] L.-N. Xing, Y.-W. Chen, P. Wang, Q.-S. Zhao, and J. Xiong, "A knowledge-based ant colony optimization for flexible job shop scheduling problems," Applied Soft Computing, vol. 10, no. 3, pp. 888-896, 2010.

[18] L. Wang, G. Zhou, Y. Xu, S. Wang, and M. Liu, "An effective artificial bee colony algorithm for the flexible job-shop scheduling problem," The International Journal of Advanced Manufacturing Technology, vol. 56, no. 1, pp. 1-8, 2012.

[19] K. Z. Gao, P. N. Suganthan, Q. K. Pan, and M. F. Tasgetiren, "An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time," International Journal of Production Research, vol. 53, no. 19, pp. 5896-5911, 2015.

[20] M. Rabiee, M. Zandieh, and P. Ramezani, "Bi-objective partial flexiblejob shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches," International Journal of Production Research, vol. 50, no. 24, pp. 7327-7342, 2012.

[21] J. D. Schaffer, "Multiple objective optimization with vector evaluated genetic algorithms," in Proceedings of the 1st International Conference on Genetic Algorithms and Their Applications, pp. 93-100, Lawrence Erlbaum Associates, Hillsdale, NJ, USA, 1985.

[22] B. Jurisch, "Scheduling jobs in shops with multi-purpose machines," in Software Technologies for Embedded and Ubiquitous Systems, pp. 114-125, Springer, Berlin, Germany, 1992.

[23] H. Liu, A. Abraham, O. Choi, and S. H. Moon, "Variable neighborhood particle swarm optimization for multi-objective flexible job-shop scheduling problems," in SEAL 2006, vol. 4247 of Lecture Notes in Computer Science, pp. 197-204, Springer, Berlin, Germany, 2006.

[24] J. Gao, M. Gen, L. Sun, and X. Zhao, "A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems," Computers & Industrial Engineering, vol. 53, no. 1, pp. 149-162, 2007

[25] G. Zhang, X. Shao, P. Li, and L. Gao, "An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem," Computers & Industrial Engineering, vol. 56, no. 4, pp. 1309-1318, 2009.

[26] L.-N. Xing, Y.-W. Chen, and K.-W. Yang, "An efficient search method for multi-objective flexible job shop scheduling problems," Journal of Intelligent Manufacturing, vol. 20, no. 3, pp. 283-293, 2009.

[27] I. Gonzalez-Rodriguez, C. R. Vela, and J. Puente, "A genetic solution based on lexicographical goal programming for a multiobjective job shop with uncertainty," Journal of Intelligent Manufacturing, vol. 21, no. 1, pp. 65-73, 2010.

[28] S. H. A. Rahmati, M. Zandieh, and M. Yazdani, "Developingtwo multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem," The International Journal of Advanced Manufacturing Technology, vol. 64, no. 5-8, pp. 915-932, 2013.

[29] Y. Yuan and H. Xu, "Multiobjective flexible job shop scheduling using memetic algorithms," IEEE Transactions on Automation Science and Engineering, vol. 12, no. 1, pp. 336-353, 2015.

[30] N. Srinivas and K. Deb, "Muiltiobjective optimization using nondominated sorting in genetic algorithms," Evolutionary Computation, vol. 2, no. 3, pp. 221-248, 1994.

[31] I. Kacem, S. Hammadi, and P. Borne, "Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic," Mathematics and Computers in Simulation, vol. 60, no. 3-5, pp. 245-276, 2002.

[32] N. B. Ho and J. C. Tay, "Solving multiple-objective flexible job shop problems by evolution and local search," IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews, vol. 38, no. 5, pp. 674-685, 2008.

[33] K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan, "A fast and elitist multiobjective genetic algorithm: NSGA-II," IEEE Transactions on Evolutionary Computation, vol. 6, no. 2, pp. 182-197, 2002.

[34] X. Wang, L. Gao, C. Zhang, and X. Shao, "A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem," International Journal of Advanced Manufacturing Technology, vol. 51, no. 5-8, pp. 757-767, 2010.

[35] M. Frutos, A. C. Olivera, and F. Tohme, "A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem," Annals of Operations Research, vol. 181, pp. 745-765, 2010.

[36] L. Wang, S. Wang, and M. Liu, "A Pareto-based estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem," International Journal of Production Research, vol. 51, no. 12, pp. 3574-3592, 2013.

[37] M. Rohaninejad, A. Kheirkhah, P Fattahi, and B. Vahedi-Nouri, "A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem," The International Journal of Advanced Manufacturing Technology, vol. 77, no. 1-4, pp. 51-66, 2015.

[38] V. Kaplanoglu, "An object-oriented approach for multi-objective flexible job-shop scheduling problem," Expert Systems with Applications, vol. 45, pp. 71-84, 2016.

[39] I. Kacem, S. Hammadi, and P Borne, "Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems," IEEE Transactions on Systems, Man & Cybernetics Part C: Applications & Reviews, vol. 32, no. 1, pp. 1-13, 2002.

[40] R. Cheng, M. Gen, and Y. Tsujimura, "A tutorial survey of job-shop scheduling problems using genetic algorithms--I. Representation," Computers & Industrial Engineering, vol. 30, no. 4, pp. 983-997, 1996.

[41] W. Xia and Z. Wu, "An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems," Computers & Industrial Engineering, vol. 48, no. 2, pp. 409-425, 2005.

[42] X. Shao, W. Liu, Q. Liu, and C. Zhang, "Hybrid discrete particle swarm optimization for multi-objective flexible job-shop scheduling problem," International Journal of Advanced Manufacturing Technology, vol. 67, no. 9-12, pp. 2885-2901, 2013.

[43] J. W. Barnes and J. B. Chambers, "Flexible job shop scheduling by tabu search, Graduate program in operations research and industrial engineering," Tech. Rep., University of Texas, Austin, Tex, USA, 1996.

[44] J. J. Palacios, I. Gonzalez-Rodriguez, C. R. Vela, and J. Puente, "Coevolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop," Fuzzy Sets and Systems, vol. 278, pp. 81-97, 2015.

[45] X. Li and L. Gao, "An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem," International Journal of Production Economics, vol. 174, pp. 93-110, 2016.

Qianwang Deng, Guiliang Gong, Xuran Gong, Like Zhang, Wei Liu, and Qinghua Ren

State Key Laboratory of Advanced Design and Manufacturing for Vehicle Body, Hunan University, Changsha 410082, China

Correspondence should be addressed to Guiliang Gong; gong_guiliang@163.com

Received 11 November 2016; Accepted 20 February 2017; Published 28 March 2017

Academic Editor: J. Alfredo Hernandez-Perez

Caption: Figure 1: The framework of BEG-NSGA-II for MO-FJSP.

Caption: Figure 2: An encoding and decoding example of a chromosome of 4 x 5 FJSP.

Caption: Figure 3: SPX crossover.

Caption: Figure 4: MPX crossover.

Caption: Figure 5: TPX crossover.

Caption: Figure 6: POX crossover.

Caption: Figure 7: JBX crossover.

Caption: Figure 8: Swapping mutation operator.

Caption: Figure 9: Reverse mutation operator.

Caption: Figure 10: TBM mutation operator.

Caption: Figure 11: MPM operator for machine assignment vector.

Caption: Figure 12: A new Pareto solution of problem 4 x 5 in Experiment 1.

Caption: Figure 13: Gantt chart of a solution of problem 18a in Experiment 2.

Caption: Figure 14: Gantt chart of a solution of problem MK08 in Experiment 3.

Caption: Figure 15: Gantt chart of problem seti5xyz in Experiment 4.
Table 1: The 4x5 problem.
                      M1    M2    M3    M4     M5

        [O.sub.1,1]    2     5     4     1     2
Job 1   [O.sub.1,2]    5     4     5     7     5
        [O.sub.1,3]    4     5     5     4     5

        [O.sub.2,1]    2     5     4     7     8
Job 2   [O.sub.2,2]    5     6     9     8     5
        [O.sub.2,3]    4     5     4    54     5

        [O.sub.3,1]    9     8     6     7     9
Job 3   [O.sub.3,2]    6     1     2     5     4
        [O.sub.3,3]    2     5     4     2     4

        [O.sub.4,1]    4     5     2     1     5
Job 4   [O.sub.4,2]    1     5     2     4     12
        [O.sub.4,3]    5     1     2     1     2

Table 2: Parameters of the BEG-NSGA-II.

Parameters                         Value

Population size                     100
Maximal total generation            300
Iteration times of first stage      100
Iteration times of second stage     200
Crossover probability                1
Mutation probability                0.1

Table 3: Results on Experiment 1.

Problem                       AL (a)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]   T

4x5          --          --          --       --

8x8          16          13          75       --

10 x 10       7           5          45       --
              8           5          42
              8           7          41

15 x 10      23          11          95       --
             24          11          91

Problem                 PSO + SA (b)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]   T

4x5          --          --          --       --

8x8          15          12          75       --
             16          13          73

10 x 10       7           6          44       --

15 x 10      12          11          91       --

Problem                      MOGA (c)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]    T

4x5          11          10          32       0.10
             11           9          34
             12           8          32

8x8          15          11          81       0.16
             15          12          75
             16          13          73

10 x 10       8           5          42       0.24
              7           6          42
              8           7          41
              7           5          45
15 x 10      11          11          91       1.46
             12          10          95
             11          10          98

Problem                       hPSO (d)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]    T

4x5          --          --          --        --

8x8          14          12          77       0.14
             15          12          75
             16          11          77
             16          13          73
10 x 10       7           5          43       0.20
              7           6          42
              8           5          42
              8           7          41
15 x 10      11          11          91       1.36
             12          10          93
             11          10          95

Problem                       hGA (e)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]    T

4x5          --          --          --        --

8x8          15          12          75       0.01

10 x 10       7           5          43       0.01

15 x 10      11          11          91       0.03

Problem                  OO approach (f)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]    T

4x5          11          10          32       0.03

8x8          16          13          73       0.04
             15          12          75

10 x 10       8           7          41       0.05
              8           5          42
              7           7          43

15 x 10      13          13          91       0.09
             14          12          91

Problem                   BEG-NSGA-II (g)

n x m       [f.sub.1]   [f.sub.2]   [f.sub.3]    T

4x5          11          10          32       0.10
             11           9          34
             12           8          32
             13           7          33
8x8          14          12          77       0.12
             15          12          75
             16          11          77
             16          13          73
10 x 10       7           5          43       0.18
              7           6          42
              8           5          42
              8           7          41
15 x 10      11          11          91       0.05
             12          10          93
             11          10          95

(a) The computation configuration is not listed in AL.

(b) The computation configuration is not listed in PSO + SA.

(c) The CPU time on a PC with 2 GHz CPU and 2 GB of RAM memory in
C++.

(d) The CPU time on a personal computer with 2 GHz CPU and 2 GB of
RAM memory in C++.

(e) The CPU time on a 3.0 GHz Pentium in Delphi.

(f) The CPU time on an Intel Core i5, 2.67 GHz processor with 4 GB
RAM of memory in Java.

(g) The CPU time on an Intel Core i3, 2.67 GHz processor with 4 GB
RAM in MATLAB R2014a.

Table 4: Results on Experiment 2.

                                    MOGA (a)          `
Problem (n x m)
                  [f.sub.1]   [f.sub.2]   [f.sub.3]     T

01a (10x5)          2,568       2,505      11,137     2.04
                    2,572       2,568      11,137
                    2,594       2,554      11,137

02a (10x5)          2,289       2,263      11,137     2.56
                    2,313       2,238      11,137

03a (10x5)          2,287       2,248      11,137     2.90
                    2,256       2,252      11,137

04a (10 x 5)        2,550       2,503      11,090     2.07
                    2,569       2,565      11,076
                    2,579       2,552      11,080
                    3,095       2,727      11,064

05a (10 x 5)        2,292       2,252      11,077     2.37
                    2,293       2,242      11,091
                    2,297       2,255      11,054
                    2,315       2,272      11,063
                    2,343       2,298      11,050
                    2,358       2,322      11,038
                    2,376       2,243      11,022
                    2,904       2,620      10,941
                    2,945       2,571      10,941
                    3,056       2,507      10,941

06a (10 x 5)        2,250       2,233      11,009     3.09
                    2,254       2,223      10,994
                    2,398       2,219      10,973
                    2,437       2,280      10,988
                    2,744       2,448      10,850
                    2,902       2,439      10,847
                    2,967       2,840      10,839

07a (15x8)          2,450       2,413      16,485      763
                    2,457       2,299      16,485
                    2,484       2,289      16,485

08a (15 x 8)        2,187       2,102      16,485     8.27
                    2,171       2,104      16,485

09a (15x8)          2,157       2,113      16,485     10.16
                    2,144       2,119      16,485
                    2,158       2,102      16,485

10a (15x8)          2,461       2,433      16,505     7.55
                    2,470       2,310      16,537
                    2,478       2,330      16,533
                    2,482       2,360      16,499
                    2,501       2,265      16,547
                    2,501       2,312      16,528
                    2,547       2,476      16,490
                    3,064       2,734      16,464

11a (15 x 8)        2,182       2,170      16,449     10.14
                    2,202       2,114      16,476
                    2,210       2,113      16,442
                    2,337       2,185      16,377
                    2,874       2,389      16,247
                    2,894       2,330      16,247
                    2,962       2,312      16,247

12a (15x8)          2,161       2,107      16,295     11.92
                    2,168       2,130      16,220
                    2,191       2,084      16,355
                    2,210       2,103      16,331
                    2,315       2,125      16,292
                    2,366       2,105      16,237
                    2,493       2,297      16,124
                    2,631       2,309      16,112
                    2,637       2,303      16,113
                    2,683       2,397      16,104

13a (20 x 10)       2,408       2,326      21,610     23.99

14a (20 x 10)       2,340       2,251      21,610     29.05
                    2,334       2,258      21,610

15a (20 x 10)       2,285       2,247      21,610     33.29
                    2,287       2,218      21,610

16a (20 x 10)       2,447       2,354      21,602     21.52
                    2,450       2,380      21,590
                    2,487       2,454      21,584
                    2,492       2,417      21,576
                    2,540       2,396      21,547
                    2,550       2,492      21,545
                    2,568       2,428      21,540
                    3,013       2,588      21,478
                    3,106       2,548      21,478

17a (20 x 10)       2,322       2,240      21,433     28.47
                    2,322       2,280      21,362
                    2,323       2,238      21,454
                    2,343       2,224      21,420
                    2,480       2,285      21,344
                    2,528       2,231      21,313
                    2,789       2,448      21,198
                    2,808       2,303      21,200
                    2,816       2,370      21,197

18a (20 x 10)       2,267       2,235      21,483     33.01
                    2,269       2,206      21,408
                    2,320       2,208      21,354
                    2,437       2,221      21,311
                    2,531       2,310      21,285
                    2,545       2,305      21,282

                               BEG-NSGA-II (b)
Problem (n x m)
                  [f.sub.1]   [f.sub.2]   [f.sub.3]     T

01a (10x5)          2,568       2,505      11,137     1.91
                    2,572       2,568      11,137
                    2,594       2,554      11,137

02a (10x5)         2,487#      2,237#      11,137#    2.13
                   3,014#      2,234#      11,137#
                   2,564#      2,236#      11,137#

03a (10x5)         2,492#      2,247#      11,137#     2.5
                   2,516#      2,234#      11,137#

04a (10 x 5)       2,882#      2,572#      11,069#    2.03
                   2,912#      2,552#      11,070#
                   2,904#      2,626#      11,067#
                   3,019#      2,665#      11,066#
                   2,997#      2,523#      11,073#
                   2,933#      2,688#      11,065#
                   2,953#      2,668#      11,066#
                   2,938#      2,606#      11,068#
                   2,955#      2,503#      11,074#

05a (10 x 5)       2,740#      2,250#      10,981#    2.12
                   2,846#      2,212#      10,986#
                   2,747#      2,229#      10,988#
                   2,700#      2,255#      10,977#
                   2,915#      2,231#      10,981#
                   2,818#      2,208#      10,990#
                   2,787#      2,350#      10,970#
                   2,759#      2,320#      10,971#
                   2,667#      2,237#      10,983#
                   2,686#      2,277#      10,974#
                   2,641#      2,332#      10,974#
                   2,687#      2,221#      11,000#
                   2,779#      2,237#      10,981#
                   2,707#      2,299#      10,972#
                   2,702#      2,233#      10,989#

06a (10 x 5)       2,673#      2,194#      10,893#    2.86
                   2,716#      2,194#      10,891#
                   2,683#      2,245#      10,890#
                   2,666#      2,248#      10,893#
                   2,679#      2,229#      10,892#
                   2,816#      2,186#      10,903#
                   2,898#      2,186#      10,899#
                   2,713#      2,234#      10,889#
                   2,758#      2,209#      10,890#
                   2,722#      2,229#      10,890#

07a (15x8)         2,927#      2,187#      16,485#    6.21
                   2,910#      2,213#      16,485#
                   2,889#      2,264#      16,485#
                   2,891#      2,219#      16,485#
                   2,922#      2,190#      16,485#

08a (15 x 8)       2,621#      2,091#      16,485#    6.35
                   2,770#      2,089#      16,485#
                   2,780#      2,080#      16,485#

09a (15x8)         2,442#      2,103#      16,485#    7.26
                   2,470#      2,074#      16,485#
                   2,455#      2,081#      16,485#

10a (15x8)         2,998#      2,317#      16,487#    6.43
                   3,036#      2,363#      16,482#
                   3,091#      2,491#      16,473#
                   2,984#      2,319#      16,486#
                   3,052#      2,377#      16,477#
                   3,098#      2,491#      16,472#
                   3,013#      2,293#      16,487#
                   3,136#      2,457#      16,471#
                   3,025#      2,377#      16,480#
                   3,041#      2,351#      16,481#
                   2,980#      2,258#      16,494#
                   3,021#      2,319#      16,484#

11a (15 x 8)       2,551#      2,116#      16,229#    7.25
                   2,599#      2,131#      16,224#
                   2,612#      2,146#      16,222#
                   2,573#      2,058#      16,231#
                   2,753#      2,186#      16,217#
                   2,628#      2,102#      16,224#
                   2,702#      2,098#      16,223#
                   2,658#      2,089#      16,224#
                   2,555#      2,111#      16,229#
                   2,664#      2,063#      16,228#

12a (15x8)         2,624#      2,049#      16,055#    8.22
                   2,620#      2,022#      16,068#
                   2,587#      2,035#      16,065#
                   2,614#      2,057#      16,051#
                   2,585#      2,043#      16,061#
                   2,659#      2,038#      16,055#
                   2,617#      2,024#      16,065#
                   2,575#      2,057#      16,057#
                   2,587#      2,050#      16,059#
                   2,582#      2,098#      16,052#

13a (20 x 10)      2,595#      2,036#      16,059#
                   2,566#      2,044#      16,061#
                   2,894#      2,277#      21,610#    10.27
                   2,928#      2,233#      21,610#
                   2,896#      2,244#      21,610#
                   2,877#      2,282#      21,610#

14a (20 x 10)      2,649#      2,186#      21,610#    12.39
                   2,664#      2,183#      21,610#
                   2,641#      2,207#      21,610#
                   2,738#      2,182#      21,610#

15a (20 x 10)      2,627#      2,216#      21,610#    13.60
                   2,681#      2,196#      21,610#
                   2,645#      2,215#      21,610#
                   2,652#      2,201#      21,610#
                   2,668#      2,197#      21,610#
                   2,682#      2,178#      21,610#

16a (20 x 10)      2,965#      2,279#      21,534#    11.48
                   3,158#      2,303#      21,504#
                   3,184#      2,400#      21,490#
                   3,039#      2,279#      21,523#
                   3,050#      2,318#      21,507#
                   3,071#      2,286#      21,513#
                   3,275#      2,281#      21,511#
                   3,105#      2,352#      21,496#
                   3,175#      2,344#      21,497#
                   3,180#      2,293#      21,507#
                   3,130#      2,312#      21,503#
                   3,034#      2,352#      21,503#

17a (20 x 10)      2,806#      2,195#      21,096#    13.92
                   2,750#      2,165#      21,120#
                   2,791#      2,141#      21,114#
                   2,716#      2,157#      21,129#
                   2,849#      2,148#      21,107#
                   2,769#      2,166#      21,111#
                   2,856#      2,183#      21,098#
                   2,773#      2,145#      21,111#
                   2,856#      2,142#      21,105#
                   2,803#      2,203#      21,094#
                   2,759#      2,186#      21,106#
                   2,789#      2,176#      21,101#
                   2,772#      2,202#      21,101#

18a (20 x 10)      2,634#      2,156#      21,005#    16.23
                   2,642#      2,126#      21,006#
                   2,638#      2,185#      20,999#
                   2,638#      2,148#      21,002#
                   2,674#      2,148#      21,000#
                   2,644#      2,145#      21,002#
                   2,651#      2,140#      21,005#
                   2,641#      2,157#      21,000#
                   2,664#      2,145#      21,001#
                   2,621#      2,181#      21,002#
                   2,659#      2,140#      21,003#
                   2,661#      2,137#      21,004#
                   2,651#      2,181#      20,999#
                   2,669#      2,126#      21,005#
                   2,708#      2,125#      21,009#

(a) The CPU time on a PC with 2 GHz CPU and 2 GB of RAM memory in
C++.

(b) The CPU time on an Intel Core i3, 2.67 GHz processor with 4 GB
RAM in MATLAB R2014a.

Note: The new Pareto-optical solutions found in our algorithms are
indicated with #.

Table 5: Results on Experiment 3.

                                    SM (a)
Problem (n x m)
                  [f.sub.1]   [f.sub.2]   [f.sub.3]     T

MK01 (10 x 6)        42          42          162      4.78

MK02 (10 x 6)        28          28          155      3.02

MK03 (15 x 8)        204         204         852      26.14

MK04 (15 x 8)        68          67          352      17.74

MK05 (15 x 4)        177         177         702      8.26

MK06 (10 x 15)       67          431        18.79

MK07 (20 x 5)        150         150         717      5.68

MK08 (20 x 10)       523         523        2,524     67.67

MK09 (20 x 10)       311         299        2,374     77.76

MK10 (20 x 15)       227         221        1,989     122.52

                                  MOGA (b)
Problem (n x m)
                  [f.sub.1]   [f.sub.2]   [f.sub.3]     T

MK01 (10 x 6)        42          39          158      0.49
                     44          40          154
                     43          40          155
                     40          36          169

MK02 (10 x 6)        26          26          151      0.75
                     27          27          146
                     29          27          145
                     29          29          143
                     31          31          141
                     33          33          140

MK03 (15 x 8)        204         199         855      4.75
                     204         144         871
                     204         135         882
                     204         133         884
                     213         199         850
                     214         210         849
                     221         199         847
                     222         199         848
                     231         188         848
                     230         177         848

MK04 (15 x 8)        66          63          345      1.76
                     65          63          362
                     63          61          371
                     62          61          373
                     61          60          382
                     60          59          390
                     73          55          350
                     74          54          349
                     74          55          348
                     90          76          331

MK05 (15 x 4)        173         173         683      2.34
                     175         175         682
                     183         183         677
                     185         185         676
                     179         179         679

MK06 (10 x 15)       62          55          424      1.93
                     65          54          417
                     60          58          441
                     62          60          440
                     76          60          362
                     76          74          356
                     78          60          361
                     73          72          360
                     72          72          361
                     100         90          330

MK07 (20 x 5)        139         139         693      4.92
                     140         138         686
                     144         144         673
                     151         151         667
                     157         157         662
                     162         162         659
                     166         166         657

MK08 (20 x 10)       523         515        2,524     12.04
                     523         497        2,534
                     524         524        2,519
                     578         578        2,489
                     587         587        2,484

MK09 (20 x 10)       311         299        2,290     19.48
                     310         299        3514
                     311         301        2,287
                     314         299        2,315
                     315         299        2,283
                     332         302        2,265
                     329         301        2,266
                     328         308        2,259
                     325         299        2,275

MK10 (20 x 15)       224         219        1,980     17.87
                     225         211        1,976
                     233         214        1,919
                     235         218        1,897
                     235         225        1,895
                     240         215        1,905
                     240         216        1,888
                     242         214        1,913
                     246         215        1,896
                     252         224        1,884
                     256         211        1,919
                     260         244        1,869
                     266         254        1,864
                     268         264        1,858
                     276         256        1,857
                     281         268        1,854
                     217         207        2,064
                     214         204        2,082

                              BEG-NSGA-II (b)
Problem (n x m)
                  [f.sub.1]   [f.sub.2]   [f.sub.3]     T

MK01 (10 x 6)        42          39          158      0.36
                     44          40          154
                     43          40          155
                     40          36          169
                     47#         36#        167#
                     47#         37#        165#
                     49#         37#        164#
                     50#         38#        162#

MK02 (10 x 6)        26          26          151      0.70
                     27          27          146
                     29          27          145
                     29          29          143
                     31          31          141
                     33          33          140

MK03 (15 x 8)        204         199         855      3.66
                     204         144         871
                     204         135         882
                     204         133         884
                     213         199         850
                     214         210         849
                     221         199         847
                     222         199         848
                     231         188         848
                     230         177         848

MK04 (15 x 8)        66          63          345      1.63
                     65          63          362
                     63          61          371
                     60          59          390
                     74          54          349
                     74          55          348
                     72#         72#        342#
                     78#         78#        339#
                     72#         66#        348#
                     73#         72#        343#

MK05 (15 x 4)        173         173         683      1.96
                     175         175         682
                     183         183         677
                     179         179         679
                    199#        199#        674#
                    193#        193#        675#
                    183#        183#        677#

MK06 (10 x 15)       62          55          424      1.85
                     65          54          417
                     60          58          441
                     62          60          440
                     76          60          362
                     76          74          356
                     78          60          361
                     73          72          360
                     72          72          361
                     100         90          330

MK07 (20 x 5)        139         139         693      3.12
                     140         138         686
                     144         144         673
                     151         151         667
                     157         157         662
                     162         162         659
                     166         166         657

MK08 (20 x 10)       523         515        2,524     8.34
                     523         497        2,534
                     524         524        2,519
                     578         578        2,489
                     587         587        2,484
                    541#        533#       2,516#
                    542#        542#       2,511#
                    560#        560#       2,505#

MK09 (20 x 10)       311         299        2,290     10.15
                     310         299        3514
                     311         301        2,287
                     314         299        2,315
                     315         299        2,283
                     332         302        2,265
                     329         301        2,266
                     328         308        2,259
                     325         299        2,275

MK10 (20 x 15)       224         219        1,980     12.38
                     235         225        1,895
                     240         215        1,905
                     246         215        1,896
                     252         224        1,884
                     256         211        1,919
                     260         244        1,869
                     266         254        1,864
                    246#        206#       1,938#
                    246#        204#       1,948#
                    246#        205#       1,940#
                    251#        202#       1,948#
                    253#        207#       1,930#
                    249#        203#       1,947#
                    255#        202#       1,943#
                    260#        210#       1,926#
                    250#        205#       1,935#
                    254#        203#       1,942#
                    244#        207#       1,935#

(a) The CPU time on a Pentium IV 2.4 GHz processor with 1.0 GB of
RAM memory in MATLAB.

(b) The CPU time on a PC with 2 GHz CPU and 2 GB of RAM memory in
C++.

(c) The CPU time on an Intel Core i3, 2.67 GHz processor with 4 GB
RAM in MATLAB R2014a.

Note: The new Pareto-optical solutions found in our algorithms are
indicated with #.

Table 6: Results on Experiment 4.

                          HGTS (a)           HA (b)
Problem (n x m)
                     [f.sub.1]    T     [f.sub.1]    T

mt10cl (10 x 11)        927      0.22      927      0.20
mt10cc (10 x 12)        908      0.22      908      0.16
mt10x (10 x 11)         918      0.25      918      0.18
mt10xx (10 x 12)        918      0.20      918      0.18
mt10xxx (10 x 13)       918      0.20      918      0.18
mt10xy (10 x 12)        905      0.22      905      0.19
mt10xyz (10 x 13)       847      0.30      847      0.16
setb4c9 (15 x 11)       914      0.27      914      0.26
setb4cc (15 x 12)       907      0.25      907      0.25
setb4x (15 x 11)        925      0.25      925      0.21
setb4xx (15 x 12)       925      0.23      925      0.09
setb4xxx (15 x 13)      925      0.25      925      0.15
setb4xy (15 x 12)       910      0.32      910      0.20
setb4xyz (15 x 13)      905      0.25      905      0.24
seti5c12 (15 x 16)     1,170     0.68     1,170     0.52
seti5cc (15 x 17)      1,136     0.57     1,136     0.28
seti5x (15 x 16)       1,199     0.63     1,198     0.46
seti5xx (15 x 17)      1,197     0.57     1,197     0.48
seti5xxx (15 x 18)     1,197     0.52     1,197     0.32
seti5xy (15 x 17)      1,136     0.57     1,136     0.29
seti5xyz (15 x 18)     1,125     0.72     1,125     0.55

                                   BEG-NSGA-II (c)
Problem (n x m)
                     [f.sub.1]   [f.sub.2]   [f.sub.3]    T

mt10c1 (10 x 11)      1,092#       631#       5,109#     0.18
mt10cc (10 x 12)      1,005#       631#       5,109#     0.20
mt10x (10 x 11)       1,117#       556#       5,109#     0.18
mt10xx (10 x 12)      1,117#       556#       5,109#     0.18
mt10xxx (10 x 13)     1,100#       556#       5,109#     0.19
mt10xy (10 x 12)      1,061#       548#       5,109#     0.21
mt10xyz (10 x 13)      925#        534#       5,109#     0.23
setb4c9 (15 x 11)     1,035#       857#       7,727#     0.25
setb4cc (15 x 12)     1,023#       857#       7,727#     0.24
setb4x (15 x 11)      1,030#       846#       7,727#     0.20
setb4xx (15 x 12)     1,030#       846#       7,727#     0.10
setb4xxx (15 x 13)    1,033#       846#       7,727#     0.16
setb4xy (15 x 12)     1,020#       845#       7,727#     0.22
setb4xyz (15 x 13)    1,011#       838#       7,727#     0.23
seti5c12 (15 x 16)    1,319#      1,027#      11,472#    0.48
seti5cc (15 x 17)     1,301#       888#       11,472#    0.29
seti5x (15 x 16)      1,368#       938#       11,472#    0.52
seti5xx (15 x 17)     1,346#       938#       11,472#    0.55
seti5xxx (15 x 18)    1,346#       938#       11,472#    0.37
seti5xy (15 x 17)     1,301#       888#       11,472#    0.27
seti5xyz (15 x 18)    1,270#       835#       11,472#    0.61

(a) The CPU time on a Xeon E5520 processor with 24 GB of RAM memory
in C++.

(b) The CPU time on an Intel 2.0 GHz Core (TM) 2 Duo processor with
8.0 GB of RAM memory in C++.

(c) The CPU time on an Intel Core i3, 2.67 GHz processor with 4 GB
RAM in MATLAB R2014a.

Note: The new multiobjective optimization solutions found in our
algorithms are indicated with #.
COPYRIGHT 2017 Hindawi Limited
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:Research Article
Author:Deng, Qianwang; Gong, Guiliang; Gong, Xuran; Zhang, Like; Liu, Wei; Ren, Qinghua
Publication:Computational Intelligence and Neuroscience
Article Type:Report
Date:Jan 1, 2017
Words:11994
Previous Article:Search for an Appropriate Behavior within the Emotional Regulation in Virtual Creatures Using a Learning Classifier System.
Next Article:Patch-Based Principal Component Analysis for Face Recognition.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters