Printer Friendly

2017 Manhole Rehabilitation & Stp Lining Project.

Tenders are invited for bid schedule a: mh~s to be structurally rehabilitated, new/repaired benches and removal of all steps, 7 ea; alt 1: mh~s to be structurally rehabilitated new/repaired benches and removal of all steps, 7 ea; alt 2: mh~s to be structurally rehabilitated new/repaired benches and removal of all steps, 8 ea.; alt 3: mh~s to be structurally rehabilitated new/repaired benches and removal of all steps, 8 ea. bid schedule b: mobilization, traffic control cleaning/televising, dye testinq, 4,200 lf of cipp for 8" vcp (spread across 10 locations), 395 lf of cipp for 10" vcp (1 location), sanitary service reconnection, post construction televising within the city.

Bid date & time: 08/10/17 1:30 pm

Major organization : PIERRE, CITY OF

Address : PO Box 1253 222 E Dakota Ave

Pierre,

SD, 57501

Country :United States

Url : http://ci.pierre.sd.us

Notice type : Tender Notice

Open date : 2017-08-10

Tender documents : T40945400.html

[c] 2017 Al Bawaba (Albawaba.com) Provided by SyndiGate Media Inc. ( Syndigate.info ).

COPYRIGHT 2017 SyndiGate Media Inc.
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2017 Gale, Cengage Learning. All rights reserved.

Article Details
Printer friendly Cite/link Email Feedback
Publication:Mena Report
Date:Jul 16, 2017
Words:175
Previous Article:Construction Schedule For This Project Is 11 Weeks Which Includes 3 Weeks Of Re-fixturing The Store.
Next Article:Sale Of $645,000 School Building Revenue Bonds, Series Of 2017.
Topics:

Terms of use | Privacy policy | Copyright © 2019 Farlex, Inc. | Feedback | For webmasters