Printer Friendly
The Free Library
14,505,710 articles and books
Member login
User name  
Password 
 
Join us Forgot password?

Work begins at WTC Memorial.


Work on the World Trade Center Memorial began last week as crews prepared the site for the construction of foundations and footings for the $510-million memorial and museum, designed by architects Michael Arad Michael Arad is an Israeli citizen and architect who was selected to design the World Trade Center Memorial in New York City. Early life
Arad was born in Israel but he has lived in the United States, Britain, and Mexico because his father: Moshe Arad, was an Israeli
 and Peter Walker.

"This is a great step forward for the Memorial," Memorial Foundation acting president Joe Daniels Joe Daniels may refer to:
  1. Joe Daniels (drummer) - rock drummer
  2. Joe Daniels (jazz drummer) - jazz musician from South Africa
  3. Joe Daniels (vintage British performer)
  4. Joe Daniels (Actor)
 said. "Over the coming weeks and months, visitors to the site will begin to see the foundations of the Memorial and Museum take shape. A total of 142 footings will be constructed to hold up the structures of the Memorial, the plaza, the Museum, and the Visitor Center. With the 5th anniversary of September 11th approaching, it's time It's Time was a successful political campaign run by the Australian Labor Party (ALP) under Gough Whitlam at the 1972 election in Australia. Campaigning on the perceived need for change after 23 years of conservative (Liberal Party of Australia) government, Labor put forward a  for the public to join our efforts to build a lasting Memorial by making a contribution in memory of those we lost."

Workers from Homdel, N J-based heavy construction firm E.E. Cruz & Company mobilized on the site last Thursday, excavating down to the level at which the foundation will be laid. E. E. Cruz is the first firm on site, having won a $17 million contract for construction of the foundations and footings in July.

"We're ready for this and we're excited," said E E Cruz president Edward Cruz. "This project obviously means a lot to our guys."

The Cruz crew has worked Ground Zero before. On September 11, 2001, E.E. Cruz & Company employees were working directly across the river from the World Trade Center in Jersey City, NJ. The company responded quickly, readying supplies, manpower and equipment to help the recovery effort.

Rui Andre, E.E. Cruz's Equipment Manager and Mark Carlucci, a Local 15 Mechanic and longtime employee, arrived at Ground Zero that afternoon. They both helped by forming a chain with other E.E. Cruz workmen, passing five-gallon pails filled with debris that had been removed by hand from the massive pile of rubble.

Later that day, E.E. Cruz delivered a flatbed truck A flatbed truck is a type of truck which can be either articulated or rigid. It has an entirely flat, level body with absolutely no sides or roof. This allows for quick and easy loading of goods, and consequently they are used to transport heavy loads that are not delicate or  containing oxygen, acetylene acetylene (əsĕt`əlēn') or ethyne (ĕth`īn), HC≡CH, a colorless gas. It melts at −80.8°C; and boils at −84.0°C;. , and burning torches. Soon to follow from Cruz building sites across the region were six off-road dump trucks, a 245 backhoe with a grapple attachment and a 980 loader A program routine that copies a program into memory for execution. .

The company continued to work on the site for several months.

Construction of the Memorial began in March with preliminary work to cover the original box beam Noun 1. box beam - a beam built up from boards; has a hollow rectangular cross section
box girder

beam - long thick piece of wood or metal or concrete, etc., used in construction
 columns that outline the perimeters of the Twin Towers.

The Memorial is currently on schedule for completion in September 2009.
COPYRIGHT 2006 Hagedorn Publication
No portion of this article can be reproduced without the express written permission from the copyright holder.
Copyright 2006, Gale Group. All rights reserved. Gale Group is a Thomson Corporation Company.

 Reader Opinion

Title:

Comment:



 

Article Details
Printer friendly Cite/link Email Feedback
Title Annotation:memorial and museum construction at World Trade Center site, E.E. Cruz and Company Inc. handles the task
Author:Moran, Tim
Publication:Real Estate Weekly
Geographic Code:1U2NY
Date:Aug 23, 2006
Words:397
Previous Article:Silvercup West project passes major hurdle.(New York City Council approves the film production studio plans)
Next Article:High Line Phase 2 set to get underway.
Topics:



Related Articles
LMDC urges patience in rebuilding.(Lower Manhattan Development Corp.)(Brief Article)
Construction begins at 7 WTC.
Tishman named to board of directors.(Brief Article)
WTC Memorial Foundation board of directors appointed.(Construction & Design)(Brief Article)
Modern memory.(architecture)
Sciame chops $500m from cost of memorial.
Port Authority now to build WTC Memorial.
NJ firm wins first major contract for WTC Memorial construction.(New Jersey, World Trade Center Memorial Foundation contracts E.E. Cruz and Company...
WTC memorial scheduled to open in 2009: stakeholders and families continue to clash.(9/11: 5 YEARS LATER)(World Trade Center Memorial Foundation)
PA awards steel contract for the WTC Memorial.(Construction & Design Section B)

Terms of use | Copyright © 2009 Farlex, Inc. | Feedback | For webmasters | Submit articles