What Is a Second Worth?When you are buying a molding machine (Woodworking) A planing machine for making moldings (Founding) A machine to assist in making molds for castings. See also: Molding Molding , the author advises, you should balance the initial price against the payback Payback The length of time it takes to recover the initial cost of a project, without regard to the time value of money. in productivity. Every molder mold·er v. mold·ered, mold·er·ing, mold·ers v.intr. To crumble to dust; disintegrate. v.tr. To cause to crumble. See Synonyms at decay. knows that time is money, but identifying the value of a single second's worth of cycle time might seem like splitting hairs. Yet a second saved on every cycle adds up to hours of valuable machine time and reduced part costs. Calculating the value of a second in a molding operation can give a new perspective on capital investment choices, a key factor in overall cost reduction. Molding machines and other capital equipment represent a fairly small share of the manufacturing costs for most plastic parts. Resin represents the largest chunk of the total--by some estimates, up to 75% of part cost. Among the cost factors that the molder can control, labor and overhead costs overhead costs see fixed costs. can provide ample opportunities for cost reduction on a plant-wide basis. Although the molding machine and related equipment typically represent only about 12% of the overall cost of producing a part, this cost component can be affected by wise buying decisions. Thus, equipment takes on greater importance than its share of the cost equation might suggest. Wise capital-investment decisions rarely depend solely on the initial price of the machine. Instead, they are based on the total cost of operating the equipment--including labor, utilities, and cycle time. While all these factors are important, cycle time looms largest. A premium purchase price based on cycle-time savings alone can often be justified in two years or less. Pricing a second There are several ways of calculating a second's value. For most molders, especially custom molders, value is best viewed through the lens of machine-hour rates. First, figure out the total number of production hours available in a year. For example, a shop that runs around the clock, seven days a week for 50 weeks per year would have a maximum of 8400 hr available. Assuming an uptime The time during which a system is working without failure. Contrast with downtime. See availability. efficiency of 95%, 8000 hr/yr are available for molding. Next, figure out the hours saved from a one-second reduction in cycle time and multiply mul·ti·ply v. 1. To increase the amount, number, or degree of. 2. To breed or propagate. that figure by the machine-hour rate. For example, if the molding cycle on a given part is reduced from 10 to 9 sec, that 10% reduction adds up to savings of 800 hr/yr in an 8000-hr/yr shop. For a press in the 300-499 ton range, with a typical machine-hour rate of $48.50, the additional 800 hr made available by a 1-sec shorter cycle is worth $38,800 in machine-hour cost. Of course, to realize this benefit we assume that the additional production time can be sold or used for another molding project. Another method of calculating the value of a second is to look at the incremental Additional or increased growth, bulk, quantity, number, or value; enlarged. Incremental cost is additional or increased cost of an item or service apart from its actual cost. revenue it generates. Using the same cycle-time reduction of 10 to 9 sec for a 32-cavity mold mold, name for certain multicellular organisms of the various classes of the kingdom Fungi, characteristically having bodies composed of a cottony mycelium. The colors of molds are caused by the spores, which are borne on the mycelium. , we can calculate the additional output per year. The 800 hr gained represents another 320,000 cycles. The additional output for the 32-cavity mold would be 10 million parts. If the selling price was $15/1000 parts, the incremental revenue would be $150,000/yr. Again, to realize the benefit, the molder must be able to sell the additional output. A very similar calculation would be performed based on profit. For the same 32-cavity example, using a profit of $2/1000 parts, the additional 10 million parts would generate $20,000/yr. Investment choices Once we know the value of a second in the molding operation, we can ask ourselves what we are willing to invest to gain a second. To see how a second's value can affect machine choices, consider this comparison: * Machine A of 500 tons (Transparent Optical Networking Services) A marketing term for providing dark fiber to a customer. The customer is responsible for generating the transmission signal and interpreting it at the other end. See dark fiber. costs $200,000, carries a machine-hour rate of $48.50, and can produce a part in a 10-sec cycle. * Machine B of 550 tons costs $250,000, has a machine-hour rate of $50.40, and can produce the same part in 9 sec. As shown in the table (Example 1), faster Machine B generates as many cycles in 8000 hours' running time as Machine A would if it ran for 8900 hr. That would provide $43,000/yr of additional saleable sale·a·ble adj. Variant of salable. saleable or US salable Adjective fit for selling or capable of being sold saleability or US machine time at Machine A's hourly rate. Thus, Machine B's $50,000 higher initial cost is offset by a 14-month payback based on cycle time alone. Now consider a scenario A scenario (from Italian, that which is pinned to the scenery) is a synthetic description of an event or series of actions and events. In the Commedia dell'arte in which the cycle time for Machine A is 60 sec compared with 59 sec for Machine B. The table for Example 2 shows that a cycle-time saving of 1 sec would yield the equivalent of only 136 hr extra running time for Machine A, worth just $6600/yr. The resulting 8-yr payback time would probably not justify the higher price of Machine B, given the shortness of typical product lives today. Cycle time isn't is·n't Contraction of is not. isn't is not isn't be the only way to justify a machine purchase. Energy efficiency, labor requirements, uptime, and scrap rate all help determine a machine's true cost. For example, the higher injection speed of an accumulator-based machine can reduce part weight and warpage Warp´age n. 1. The act of warping; also, a charge per ton made on shipping in some harbors. . Also, warranty An assurance, promise, or guaranty by one party that a particular statement of fact is true and may be relied upon by the other party. Warranties are used in a variety of commercial situations. In many instances a business may voluntarily make a warranty. coverage can reduce maintenance costs over the life of the machine. Machines with a longer service life also have a more favorable fa·vor·a·ble adj. 1. Advantageous; helpful: favorable winds. 2. Encouraging; propitious: a favorable diagnosis. 3. depreciation. Even though cycle time isn't the only way to identify the true value of a machine, it gives the the quickest snapshot (1) A saved copy of memory including the contents of all memory bytes, hardware registers and status indicators. It is periodically taken in order to restore the system in the event of failure. (2) A saved copy of a file before it is updated. of value and tells when a more expensive machine is worth a second look.
Payback Based on 10% Faster Cycle Alone
Machine A Machine B
Clamp Force 500 tons 550 tons
Machine Price $200,000 $250,000
Cycle Time 10 sec 9 sec
Machine-Hr Rate $48.50 $50.40
Operating Hr/Yr 8000 8000
Annual Cycles 2,880,000 3,200,000
Equivalent Extra Saleable
Machine-Hr -- 890
Value of Additional
Saleable Hr/Yr [a] -- $43,000
Payback (based on cycle only) [b] 14 months
Payback Based on 1.7% Faster Cycle Alone
Clamp Force 500 tons 550 tons
Machine Price $200,000 $250,000
Cycle Time 60 sec 59 sec
Machine-Hr Rate $48.50 $50.40
Operating Hr/Yr 8000 8000
Annual Cycles 480,000 488,000
Equivalent Extra Saleable
Machine-Hr -- 136
Value of Additional
Saleable Hr/Yr [a] -- $6600
Payback (based on cycle only) [b] 7.6yr
(a.)Based on Machine A's hourly rate.
(b.)For the $50,000 premium.
|
|
||||||||||||||||||||